Shell BC-10: BP Block 31; Exxon Mobil Saxi- Batuque

Engineer / Project Engineer, Subsea 7, Shell BC-10: BP Block 31; Exxon Mobil Saxi- Batuque

START Date: 
September, 2007
END Date: 
January, 2012
Substantial experience as a project engineer, that entailed similat activities as a project planner. 
  • Developed, planned and produced load-out and installation procedures of project assets.
  •  Managed equipment fabrication and product acceptance tests.
  •  Presented HIRAs, HAZOPs, Shift handover meetings, team updates & safety briefings.
  •  Managed drafting team to produce technical drawings & sketches.
  • &nbsp
Experience Hours (Planning & Scheduling): 
50
Experience Hours (Cost Management): 
50
Experience Hours (Forensic Analysis): 
0

Engineer / Project Engineer, Subsea 7, Shell BC-10: BP Block 31; Exxon Mobil Saxi- Batuque

START Date: 
September, 2007
END Date: 
January, 2012
  • Developed, planned and produced load-out and installation procedures of project assets.

•  Managed equipment fabrication and product acceptance tests.

•  Presented HIRAs, HAZOPs, Shift handover meetings, team updates & safety briefings.

•  Managed drafting team to produce technical drawings & sketches.

Experience Hours (Planning & Scheduling): 
50
Experience Hours (Cost Management): 
50
Experience Hours (Forensic Analysis): 
0