Website Upgrade Incoming - we're working on a new look (and speed!) standby while we deliver the project

pre engineering building

Executive Production And QC, pyramid building systems pvt ltd., Pre Engineering Building

START Date: 
October, 2010
END Date: 
October, 2013

1.    Designated manpower for particular projects.

2.    Planned and oversaw entire program.

3.    Ensured that structure’s member production cycle is safe and that structure member’s are completed safely and in accordance with the specified standards of welding and dimension.

4.    Specified the time and elements of structure’s member’s dispatch.

5.    Routing the processes and sub-processes to minimize the ideal time & maximum utilization of all resources.

Executive Production And QC, pyramid building systems pvt ltd., Pre Engineering Building

START Date: 
October, 2010
END Date: 
October, 2013

1.    Designated manpower for particular projects.

2.    Planned and oversaw entire program.

3.    Ensured that structure’s member production cycle is safe and that structure member’s are completed safely and in accordance with the specified standards of welding and dimension.

4.    Specified the time and elements of structure’s member’s dispatch.

5.    Routing the processes and sub-processes to minimize the ideal time & maximum utilization of all resources.

planning engineer, MK trading, Muscat, pre engineering building

START Date: 
September, 2013
.Planning engineer in the pre engineering building fabrication and erection

Market Place

No results found... (try selecting a different content filter)

Syndicate content