Production Planning & Control Engineer, Grandspan Development Corporation, Coal-Fired Power Plant, Fly-over/Bridges, Metro Rail Stations, Commercial Buildings, Storage Tanks

START Date: 
December, 2003
END Date: 
April, 2005
• Understanding contractual obligations, project work scope, client requirements and specifications. • Creating WBS, BOM, estimating required resources and duration, and generating preliminary schedule and cost budget for approval. • Establishing schedule and cost baselines and performing work performance measurements throughout the project duration. • Preparing and distributing status reports (Gantt/milestone charts), performance reports and forecasts (S-curves). • Tracking and controlling shop drawing revisions and material availability and issuances. • Conducting routine shop walkthrou