Developed annual program plan for up to $200M annually. Converted from mainframe schedule to Primavera schedules. Develop schedule templates. Developed schedules for Commuter Rail, Ultimate I-4, Flex-Bus.
Maintained schedules for up to 500 design projects annually. Projects included sidewalk, resurfacing, ITS, Landscaping, right-of-way, bridge repair and add lanes.