EPC & FEED Project

Planning/Project Controls Engineer, SBM Malaysia Sdn. Bhd., EPC & FEED Project

START Date: 
April, 2014

Project Engineer, SBM Offshore Malaysia

Project Controls Engineer, SBM Offshore Malaysia

Experience Hours (Planning & Scheduling): 
2000
Experience Hours (Cost Management): 
2000

Planning/Project Controls Engineer, SBM Malaysia Sdn. Bhd., EPC & FEED Project

START Date: 
April, 2014

Project Engineer, SBM Offshore Malaysia

Project Controls Engineer, SBM Offshore Malaysia

Senior Piping Engineer, "KBR (Kellogg, Brown & Root) Design & Construction", EPC & FEED Project

START Date: 
December, 2004

Working as piping layout engineer since 2004.

Worked on onshore and offshore projects.

Experience in refinery, petrochemical, chemical, caustic soda, and offshore projects.

Present role is of Dy. Lead of a team of 6 for a FEED project.

Experience Hours (Planning & Scheduling): 
0
Experience Hours (Cost Management): 
0
Experience Hours (Forensic Analysis): 
0

Senior Planner, Tripatra Engineering, EPC & FEED Project

START Date: 
October, 2013
END Date: 
December, 2013

- Develop WBS and cost estimation for owner estimate EPC Bid Package

- Evaluate contingency requirements

- Integrated project progress, cost performance, and cost forecast report

- Cost monitoring and reporting system in FEED Project

- Develop, maintain, and control integrated schedule FEED with P6 and Ms. Project

Experience Hours (Cost Management): 
500

Planner/Scheduler, WGPSN Australia, EPC & FEED Project

START Date: 
May, 2013

 

  • +13 yrs project controls experience in Oil & Gas (LNG, FEED/EPC/EPCM, AG piping, pipelines, onshore & offshore, brownfield & greenfield) in Australia and Middle East, with strong knowledge in:

     

    ·      Primavera P6, EPPM R8.2, MSP, Excel, PowerPoint and Oracle base (ERS), PertMaster and practicing PMBOK as PMP certified

    ·      Establish baseline from scratch (Level II to Level V) and communicate project requirements with stakeholders