BP ACG Full Field Development (Fabrication of 4 Integrated Topside Decks)

Certification Inspector, McDermott Caspian Contractors, Inc., BP ACG Full Field Development (Fabrication of 4 Integrated Topside Decks)

START Date: 
April, 2002
END Date: 
June, 2002
 Quality Management System set up to comply with the Project requirements to controlStructural/Piping fabrication, including dimensional and weight control, material traceability numbers,NDT, welding, welder qualifications, ISO drawings, Site Instructions and offshore documentation MCCI Project Certification System set up for Project Certification and Final Handover PackagesPreparation

Certification Inspector, McDermott Caspian Contractors, Inc., BP ACG Full Field Development (Fabrication of 4 Integrated Topside Decks)

START Date: 
June, 2002
END Date: 
June, 2005
 Authoritative acting of documenting compliance with requirements of Quality Assurance ManagementProcedures related to Structural/Piping fabrication, including dimensional and weight control, materialtraceability numbers, NDT, welding, welder qualifications, ISO drawings, Site Instructions and offshoredocumentation Monitoring the timely input of DATA onto the special proprietary database (MCCI Project CertificationSystem) and Progress of Certification. Reports generation required in the Project Certification.