Website Upgrade Incoming - we're working on a new look (and speed!) standby while we deliver the project

Process Engineer

Process Engineer, Tecna, Oil & Gas Projects

START Date: 
March, 2007
END Date: 
October, 2007

The responsibilities of this role included:

Experience Hours (Cost Management): 
50

Process Engineer, "Bechtel, Technip, Fluor Daniel, Tecnimont, Lurgi & Linde", Pertamina Jet A-1 Storage Facility

START Date: 
June, 2008
END Date: 
July, 2009

On Duty as Process Engineer : Design for Pump, Design For Pipe Checking, Design For Depressuring Sytem - FLARE, Simulation by Optimization using HYSYS

PROCESS ENGINEER, TOTAL, Using Statistical Process Control (SPC) of the stabilization of kerosene Freeze Point

START Date: 
August, 2005
END Date: 
February, 2006

ü  Analysis of Process ; Identification of quality variability causes ; Six sigma

ü  Correlations ; Modeling: Virtual analyzer, reduction of stock and cost of production

PROCESS ENGINEER, DEVON, the leak of the well of production of oil and gas & optimization of production

START Date: 
October, 2006
END Date: 
March, 2007

ü  Analysis of the offshore production system (oil & natural gas)

ü  Analysis of completion & identification of the causes of leaks in production’s well

ü  Corrosion Analysis, Planning of up keeping of production’s well; Reducing of production’s cost

ü  Well performance & Optimization of the production

PROCESS ENGINEER, TOTAL / SIR, Process Analysis in RB.eye Projet

START Date: 
April, 2008
END Date: 
August, 2008

ü  Process Analysis and Updating of Process and Instrumentation Diagram

ü  Measure of corrosive ; Planning of maintenance

ü  Calculation of corrosion rate, Initiation of inspection’s methods

Process Engineer, TOTAL/ SIR, Using Statistical Process Control (SPC) of the stabilization of kerosene Freeze Point

START Date: 
August, 2005
END Date: 
February, 2006

ü  Analysis of Process ; Identification of quality variability causes ; Six sigma

ü  Correlations ; Modeling: Virtual analyzer, reduction of stock and cost of production

Process Engineer, DEVON ENERGY, the leak of the well of production of oil and gas & optimization of production

START Date: 
October, 2006
END Date: 
March, 2008

ü  Analysis of the offshore production system (oil & natural gas)

ü  Analysis of completion & identification of the causes of leaks in production’s well

ü  Corrosion Analysis, Planning of up keeping of production’s well; Reducing of production’s cost

ü  Well performance & Optimization of the production

Process Engineer, TOTAL / SIR, Process Analysis in RB.eye Projet

START Date: 
April, 2008
END Date: 
September, 2008
 Process Analysis and Updating of Process and Instrumentation Diagram  Measure of corrosive ; Planning of maintenance  Calculation of corrosion rate, Initiation of inspection’s methods

Market Place

No results found... (try selecting a different content filter)

Syndicate content