QCLNG Export and Collection Header Pipeline Project Brisbane, Australia (Jun 2010 – Oct 2010) Principal Scheduler/Planner - Engineering
- Responsible for leading the development of the detailed resource loaded detailed design schedule
- Responsible for the integration of the detailed engineering schedule into the master EPC schedule, and the development of a schedule methodology to allow use of the Integrated Project Management System (IPMS) engineering progress module
- Responsible for ongoing Pertmaster schedu