Junior Planner

Junior Planner, Metronet, Civils

START Date: 
September, 2007

Junior planner 

Exp in progress monitoring/updating by liasing with project managers and working along side senior planners,creating reports,WBS.

Junior Planner, Naim Cendera Sdn Bhd, New General Operation Force Camp for Royal Malaysian Police

START Date: 
October, 2005
END Date: 
October, 2007

 

IV. General Operation Force Camp, Royal Malaysian Police                

(October 2005 – October 2007)

Duration: 2 years

 

Client

Royal Malaysian Police

Position Held

Planning Engineer

Scope

To Construct New General Operation Force Camp for Royal Malaysian Police

Action / Responsibilities

Junior Planner, Zikay, IBS Building

START Date: 
May, 2012

I have just develop my first planning program using MS Project 2010. I am still learning this tool.

Junior Planner, Abengoa, Solar Thermal Power Projects

START Date: 
February, 2008
END Date: 
May, 2012

      

  • Project Planner, thermo-solar power plant (Spain): Solaben Logrosán 1, 2, 3 y 6. (May 2011 till now): Supervise and provide technical direction for planning/scheduling activities of contractors, review, and analysis of the schedule and status of contractors during all phases of the project, including the analysis of any schedule deviations and corrective actions. Managing Logistic, Engineering, purshase, construction work and commissioning on site plan.

Junior Planner, Celebrity structures, Construction of United Residency

START Date: 
April, 2012

·         Analysing and controlling of project cash flow, updating cash flow report

·         To identify the root cause of any delay  event and report to project manager with recommended corrective action

·         Using Earned Value Calculations to monitor project status.

·         Generating monthly weekly and daily reports, preparing look ahead program for week and month

junior planner, Celebrity structures, Construction of VEDADRI Apartment

START Date: 
June, 2008
END Date: 
August, 2009

·         AS PLANNING ENGINEER-
* Planed & Scheduled the Project, as per Construction Drawings
* Prepared the Project Cash Flow

·          AS SITE ENGINEER
* Implemented the Construction Schedule
* Controlled the Site Execution Work

·         Preparing schedule by creating WBS and codes, linking relationships, assigning resources and budget, updating progress.

junior planner, Celebrity Structures, : Construction of CELEBRITY SRIKARA'S Apartment

START Date: 
August, 2007
END Date: 
May, 2008

·         Worked on Creating a project, WBS, Resource Breakdown structure and adding activities, creating activity codes which helps in displaying particular required data using Grouping, sorting and Filtering.

·         Worked on creating relationships of WBS elements using Activity network diagram and Activity details. In-depth knowledge in understanding and calculating Early, Late dates along with total, free floats.

Junior Planner, CMW Management, Consultant

START Date: 
June, 2010

A strong understanding of construction including the interpretation of fabrication drawings and the ability to convert my appraisals into realistic plans, whilst adopting a robust Work Breakdown Structure. A team player and effective communicator.

Daily tasks have included :

 

Generation of bespoke multi discipline Primavera P6 Reports as required, highlighting under performance in schedule and strategy.

Junior Planner, Costain, Berkeley Nuclear Power Station Decommissioning

START Date: 
July, 2011

Position: Planning Engineer with Costain on their nuclear decommissioning framework at Berkeley Power Station. 

 

The framework objective is to help Magnox put the decommissioned nuclear power station at Berkeley into ‘Care & Maintenance’.  To achieve this they are in the process of extracting all remaining ‘intermediate level waste’ and processing it ready for disposal at a geological disposal facility.  The framework contract is based on the NEC model.  My role as the site planner is fourfold:

Junior Planner, EIED (Energy Industries Engineering & Design), Tabriz Gasoline Production & Sirri-NGL

START Date: 
February, 2012

1)P6 2)Primavera 3 3)Planning & Project Control 4)Project Schedule Updating 5)Invoicing 6)Progress Reporting 7)Claim 8)Data Entry  9)Cost Controling