Document Controller

Document Controller, Joint technology Pakistan, DS-7 water tank Project, Rumaila Oil field Iraq

START Date: 
December, 2012
END Date: 
June, 2013
Joint technology Pakistan,As document control engineer 19th, December 2012‐ 16th, June 2013Assisting in managing documents of “West Qurna Basra project” for the client Al‐Karrar Engineering Certification in Primavera P6 ver.

Document Controller, Terna Contracting WLL, Riffa Views, Ministry Of Housing,

START Date: 
October, 2007

Document ControllerDocument Controller

The Works comprised the construction and completion of luxury villas inclusive of substructure, finishes, electrical, plumbing & mechanical installations, ancillary external works and services within the site boundaries. 

 

Specific duties were:

Document Controller, SOJV - Taisei Corp - TAV, New Doha International Airport project (value of 15 billion QR); Managed by Overseas Bechtel

START Date: 
October, 2009

v  Preparation of Transmittals for the submission of subcontractors.

v  Preparation of Transmittals for Internal Distribution.

v  Updating Various Log sheets.

v  Receiving subcon Letters.

v  Filing Invoices, Incoming and Outgoing letters, Transmittals, to the appropriate files.

v  Labelling of each folders.

Document Controller, Saipem, & Oil & Gas Projects 2) Buildings 3) Infrastructure

START Date: 
October, 2011

10/18/2011- Present     Saipem– Abu Dhabi.

Document Controller, Saipem, & Oil & Gas Projects 2) Buildings 3) Infrastructure

START Date: 
October, 2011

10/18/2011- Present     Saipem– Abu Dhabi.

Document Controller, Alcon Nigeria Limited, Shell - Gbaran-Ubie FLB Bayelsa State

START Date: 
March, 2008
END Date: 
September, 2007

Project DCC for the Construction of the Gbaran-Ubie FLB for Shell in Bayelsa State