Guild of Project Controls: Compendium | Roles | Assessment | Certifications | Membership

CAD / Scheduler

CAD / Scheduler, Dupont, Energy Improvement

START Date: 
January, 2014

Nuclear , Industrial, Residential, and Commercial Construction. I have been in this industry since 1998.

CAD / Scheduler, Dupont, Energy Improvement

START Date: 
January, 2014

Nuclear , Industrial, Residential, and Commercial Construction. I have been in this industry since 1998.

CAD / Scheduler, V co., Civil Works

START Date: 
July, 1998
As CADD:In charge with all the Project Layouts, Design, Detailed Engineering and planning – prepare the initial schematic plans,details and related drawings needed and obtain Manager’s approval. Prepares all relevant shop drawings and As-builts with site inspection. Coordinate the drawings with the PM and check consistencies on site. Ensure that all design and drawings are complying with the Specifications and Standard Maintain systematic filing system Prepare correspondences and minutes of meeting

CAD / Scheduler, V co., Building Construction

START Date: 
July, 1998
As CADD: In charge with all the Project Layouts, Design, Detailed Engineering and planning – prepare the initial schematic plans,details and related drawings needed and obtain Manager’s approval. Prepares all relevant shop drawings and As-builts with site inspection. Coordinate the drawings with the PM and check consistencies on site. Ensure that all design and drawings are complying with the Specifications and Standard Maintain systematic filing system Prepare correspondences and minutes of meeting

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher. Teach yourself using on-line or book based learning or run your own in-house or public courses.
Syndicate content