Area Planning Engineer

Area Planning Engineer, ARAMCO SRACO COMPANY, KARAN GAS PLANT PROJECT

START Date: 
April, 1989

<?xml:namespace prefix = v />

Area Planning Engineer, OIGSA, Oil & Gas Field

START Date: 
March, 2007

Planning Engineer in the Oil & Gas , Petrochemical and Building construction Project(Persian Gulf).

Area Planning Engineer, Sinopec, SWCC

START Date: 
June, 2013

 

Ø  Developed detailed construction schedule (P3) with contractor based on the material delivery and shutdown logic,

Ø  Monitored construction schedule, daily progress report was prepared for updating management on progress

Ø  Interface with project site management and client counterparts, Organizing & attending progress meeting with client.

Area Planning Engineer, Singapore Technologies Electronics, Chennai Metro Railway Project

START Date: 
June, 2011

HI

 

My Role :  Planning Engineer 

i would like to join in this group because of while make plan ,i made mistake  i want discus

Area Planning Engineer, Impregilo, Eastern Bypass Highway of Milan (Italy)

START Date: 
November, 2011

Duties:

Area Planning Engineer, AKSAN Survey Consultant Engineering Construction Co, UAE Projects

START Date: 
August, 2008
END Date: 
July, 2009

 

Dates

01 Aug 2008 – 31 Jul 2009

Occupation or position held

Planning & Cost Control Engineer

Main activities and responsibilities

Area Planning Engineer, International Master, hospital-

START Date: 
July, 1999
END Date: 
May, 2016

Senior Planning Engineer

§Preparing Master Plan with realistic method of statement

§Preparing Detailed Contractor Construction Schedule

§Analyzing B.O.Q. for an effective cost loading

§Updating of schedule & monitoring the work progress

§Perform detailed analysis of the schedule updates

§Revising of schedule logic according to site condition

Area Planning Engineer., A W Galadari, Military Complex

START Date: 
September, 1982
END Date: 
June, 1983

Abdul wahed Galadari Dubai - Military Complex in Sweihan Abu dhabi UAE

Area Planning Engineer., Mircond, Many projects

START Date: 
June, 2009
END Date: 
June, 2010
  • Following up sites,
  • Solving any technical problems,
  • Present daily sheets for working status/production,
  • Weekly reports,
  • Monthly plans/targets and
  • As built programs.

Area Planning Engineer., ARCHIRODON CONSTRUCTION OVERSEAS CO. (S.A.), Banha Power Station 750 MW

START Date: 
January, 2012
  • Contract Baseline (Resources, Materials, Equipment, Cost),
  • 4 Weeks Look Ahead Schedule,
  • 90 Days Look Ahead Schedule,
  • MTS (Material Tracking System),
  • TIA (Time Impact Analysis),
  • Productivity, Production Rates and
  • Cost Control.