Theodoros Keravnou-Flatman

First Name: 
Theodoros
Last Name: 
Keravnou-Flatman

Professional Since: 
Sep-2013 (11.7 yrs experience)
Oldest experience: 
Sep 2013 (11.7 yrs experience)
Years Experience: 
4
Guild Accreditation: 
GPC Member

Electricity Projects Planner, National Grid Limited, National Grid - Capital Delivery

START Date: 
October, 2015
END Date: 
May, 2017

My role at National Grid was to continue to provide the services as per my time as a contractor supplied from Logikal Projects. In addition, I contributed to data analysis for: stakeholder management, key performance indices, and National Grid planning process improvements. I produced managerial plans for increasing the maturity of work conducted by the scheduling team for the Electricity Transmission Project Controls function. I became a skilled user of Primavera P6 during this role.

Experience Hours (Planning & Scheduling): 
2800
Experience Hours (Cost Management): 
500

Project manager, Government transport department, Infrastructure

START Date: 
February, 2014
END Date: 
May, 2015

jjj jjj jjj jjj jjj jjj jjj jjj jjj jjj jjj jjj jjj jjj

balaji pandurangan

First Name: 
balaji
Last Name: 
pandurangan

I have prepared a proposal for the Skill Levels and Roles for Planning Engineers and I would appreciate your comments.

1. Scheduler

Professional Since: 
May-2012 (13.0 yrs experience)
Oldest experience: 
Apr 2012 (13.1 yrs experience, WARNING: 0.1 years variance with Professional Since)
Years Experience: 
5

Project Planner / Forensic Planner, CMC di Ravenna, Itare Dam & Water Supply Project

START Date: 
June, 2017
  • To revise the POW for the changes & to schedule unforeseen works & activities.
  • To assist the Production Team in making strategies to attempt different activities so as to reduce both the time and cost.
  • To analyze and study the delays, time loses and additional works and to work out for the EOT claims.
  • Time Impact Analysis & Reports for EOT Claims.
  • To revise & update the cash flow.
  • To prepare the Internal WBS (Work Breakdown Structure) of different activities to insure better monitoring and boosted progress.
  • Early warning o

Project Planner / Forensic Planner, CMC di Ravenna, Cornubia Interchange to Meridian Drive, Durban

START Date: 
August, 2015
END Date: 
June, 2017
  • To revise the POW for the changes & to schedule unforeseen works & activities.
  • To assist the Production Team in making strategies to attempt different activities so as to reduce both the time and cost.
  • To analyze and study the delays, time loses and additional works and to work out for the EOT claims.
  • Time Impact Analysis & Reports for EOT Claims.
  • To revise & update the cash flow.
  • To prepare the Internal WBS (Work Breakdown Structure) of different activities to insure better monitoring and boosted progress.
  • Early warning o

Project Planner / Forensic Planner, CMC di Ravenna, Improvements to the MT. Edgecombe Interchange (Km 3.7)

START Date: 
August, 2013
END Date: 
June, 2017
  • To revise the POW for the changes & to schedule unforeseen works & activities.
  • To assist the Production Team in making strategies to attempt different activities so as to reduce both the time and  cost.
  • To analyze and study the delays, time loses and additional works and to work out for the EOT claims.
  • Time Impact Analysis & Reports for EOT Claims.
  • To revise & update the cash flow.
  • To prepare the Internal WBS (Work Breakdown Structure) of different activities to insure better monitoring and boosted progress.
  • Early war

engineer planner /scheduler / Quantity Surveyor, MHS Ltd., Diamer Basha Dam Project - Pre-Construction Works

START Date: 
July, 2012
END Date: 
November, 2012
  • In addition to the responsibilities of Quantity Surveyor also working as Planning Engineer and responsible for the preparation of up-to-date works schedule.
  • Preparation of Monthly & Weekly Progress Reports etc.

Ejaz Ahmed Anjum

First Name: 
Ejaz Ahmed
Last Name: 
Anjum

I am a young professional destined to grow my career in the fields of Project Control, Forensic Planning, Claims and Disputes. I have a formal qualification in the field of Civil Engineering and currently pursuing a management degree as well. I have worked and been working on some of the very exciting projects around the globe including Dams, Hydro Power, Roads, Bridges, Incremental Launching Bridge construction, Pipeline, tunneling etc…

Professional Since: 
Jun-2007 (17.9 yrs experience)
Oldest experience: 
Jul 2009 (15.9 yrs experience, WARNING: 2.1 years variance with Professional Since)
Years Experience: 
8

Contracts Engineer, VSL-INTRAFOR Asia-Pacific, Ganga Bridge-Bakthiyarpur Tajpur

START Date: 
August, 2010
END Date: 
February, 2012

Worked as contracts Engineer for VSL india private Ltd

 

  • Extensively involved in preperaing risk review matrices, final commitment review matrices
  • Budiling contemporary correspondences for delays
  • Preparing delay analaysis
  • Preparing extension fo time documents with substantiations
  • Claim negotiation, close out

 

key projects handled:

Experience Hours (Planning & Scheduling): 
3450
Experience Hours (Cost Management): 
5400
Experience Hours (Forensic Analysis): 
6050