Senior Planning Engineer., Willbros Engineering International, Chad to Cameroon Pipeline Project

START Date: 
December, 2000
END Date: 
April, 2003

Seconded to the Willbros Spie Capag Joint Venture.

Responsible for detailed construction planning for the Chad to Cameroon pipeline project.                                                Project comprised the construction of 1071 km of 30” pipeline, 48 valve stations, 3 pump stations and a pressure reduction station.

Project Controls Manager, Willbros Engineering International, Houston, ERHA Deepwater Project

START Date: 
April, 2003
END Date: 
December, 2003

Responsible for all Project Controls activities related to the ERHA Deepwater Development Project.

The ERHA Deepwater Project consisted of the fabrication and SIT testing of several deepwater manifolds.