Development of schedules for design and installation of the SCADA remote operating systems for Great Man Made River Phase 2 (the pumping of fresh water from an underground lake through 1,000km of 5m diameter Water Pipe and Pumping Stations between south Libya and Tripoli).
Development of schedules, progress updates/reports, delay notices, delay and disruption analysis and acceleration schedules for the installation and commissioning fixed ground power Installation (960V DC).