SUMMARY OF EXPERIENCE
My most recent position. I was employed by FJ Booth Construction at a new Bio-Mass plant as a site manager, tasked with managing the installation of 127 tons of ducting of 4mm – 6mm rolled mild steel ducting with diameters ranging from 400mm to 2700mm. All welded connections using Bare wire positional MIG welding.
Duties included:
· Planning all the works using, Micro Soft Project Planner.