Website Upgrade Incoming - we're working on a new look (and speed!) standby while we deliver the project

Pertamina EP

/ Construction Project Planner / Senior Planner / Forensic Analyst, Pertamina EP, Gas Engine Generating Set Project

START Date: 
July, 2015
END Date: 
May, 2017

Gas Engine Generating Set Project is made for solve the electrical transmission problem because of subsea cable is hit by an anchor. Subsea cable repair planning doesn't execute because of new government regulation which state that new cable is prohibited to lay on riverbed.

Experience Hours (Planning & Scheduling): 
2000
Experience Hours (Cost Management): 
1000
Experience Hours (Forensic Analysis): 
1850

Budget & Cost Control Senior Engineer, Pertamina EP, Upgrading Offshore Separation System

START Date: 
June, 2017
END Date: 
September, 2019

The goal of Upgrading Offshore Oil and Gas Separation System is add capacity of separation system because of increasing water content from oil well.

The obstacle of this project is limited space to locate separator that will be constructed. To solve this problem, we must demolish heat transfer system and use the location for construct separator system.

The completion of this project is over due from the target because the project construction need demolition work. 

Experience Hours (Planning & Scheduling): 
2000
Experience Hours (Cost Management): 
1000
Experience Hours (Forensic Analysis): 
1500

/ Construction Project Planner / Senior Planner / Forensic Analyst, Pertamina EP, Offshore Power Plant

START Date: 
July, 2015
END Date: 
December, 2017

On Offshore Gas Turbine Generator Set Project, I joint on mid of construction work. The project scope is to decommissioning the existing generator set and to construct 4 set new Gas Turbine Generator System complete with panel control set. The obstacle is limited space and no stop oil and gas production operation.

To solve problem limited space, we choose the GTG with big capacity and small size. For no stop production operation, we use external power plant that we set up the generator set on the barge with subsea cable. That condition will make the problem if the weather is bad.

Experience Hours (Planning & Scheduling): 
2000
Experience Hours (Cost Management): 
1000
Experience Hours (Forensic Analysis): 
2000

Market Place

No results found... (try selecting a different content filter)

Syndicate content