Senior Scheduling Engineer, Negev Airbase Constructors, Ovda, Israel, 1980-1982
Responsible for the field scheduling of 300 base buildings on a 4 billion USD (2011) airbase as part of the Camp David Peace Accords using McConnel Douglas MS/CS Mainframe scheduling