BIM has brought numerous benefits to many areas of project delivery in construction, but the greatest of these could be seen as the process of linking up 3D geometry to time, site costs and resources. Also known as 4D BIM or construction sequencing, this allows all project members to clearly see a virtual construction of the project based on the main construction plan of works, which was traditionally delivered as a complex Gantt chart. This article is focused on the deployment of construction sequencing technology such as Synchro Professional onto a project and the benets it will deliver. For me there are two clear reasons why Synchro should be considered when construction sequencing is to be deployed on a live construction project.
- The ability to have a true bi-directional synchronisation of data between the Gantt chart in Synchro and the master planning application such as Primavera, Asta Powerproject or Microsoft Project is key. It means that changes can be deployed in either Synchro or the planning application and both will be updated to ensure a consistent record of information is retainedt
- The second and even more important benet is that the task links between actions is retained from the master planning tool and brought through into Synchro. Synchro can also generate these task links and they will be delivered back to the master planning tool when synchronised. This capability to retain links ensures the integrity of the critical path in the planning and scheduling process. In essence, the critical path drives the process so that related tasks cannot be moved out of sync to cause potential problems on site and the critical path is always kept dened.