Revision of Bituminous Waterproofing from Sat, 2009-02-07 15:54
Brush applied coatings (tretol etc) to prepared concrete surfaces.
- A two coat application = 5.0 m2/hr
- A three coat application = 3.5 m2/hr
- Horizontal Surfaces = 4.0 m2/hr
- Vertical Surfaces = 3.5 m2/hr