Website Upgrade Incoming - we're working on a new look (and speed!) standby while we finalise the project

Chief Operations Officer, Concreteman SA, V-drains, Curbs, Manholes,Farm stores

START Date: 
May, 2014

Construction of RDP housing.

  • Excavation of foundation
  • Level and compacting of foundation
  • Steel fixing
  • Pouring concrete
  • Power float floors

 

Concreteman SA 

  • Pour concrete with 4x4 off-road concrete mixer. 
  • We specialize in pouring concrete in difficult terrain and batching.
    • Pouring V-drains.
    • Curbs
    • Manholes
    • Foundations
    • Pouring concrete in remote places.
    • Mixing is done on site.
    • All wheel steering
    • Drum rotates 300 degrees
    • Capacity of 3,5 cubes.
    • Handle slopes of up to 30 degrees with full load.
    • Computer controlled mixing from inside the cab
    • Carries 800L of water
    • Self loading
Experience Hours (Planning & Scheduling): 
4000
Experience Hours (Cost Management): 
4000
Experience Hours (Forensic Analysis): 
50