Planning Engineer/ SAP Specialist, Linde Philippines, SAP PM Process and Implementation, SAP PM Data gathering, upload a Testing

START Date: 
January, 2013
END Date: 
December, 2014

Maintenance Planning Engineer / SAP PM Specialist

Linde Philippines (Linde Group) Reliability- Engineering Department

January 16, 2013- January 1, 2015- KM.47 Sampaloc, Apalit Pampanga Philippines

 

 

·         Planning Coordination of preventive & corrective maintenance system in all Air separation Unit, Nitrogen, Oxygen, Argon, CO2, Hydrogen, Bulk and Cylinder and Customer Engineering Services Plant all over in the Philippines

·         SAP PM KPI’S Monitoring, Analysis & Reporting. PM and CM Completion.

·         Tracks progress of all pending works including shutdown and preventive maintenance work.

·         Prepares breakdown of maintenance job into major steps with different crafts involved for planning purposes.

·         Estimates materials requirement and verifies availability & required man-hour for each craft to complete work

·         Prepares preliminary schedule on the basis of job opportunity, manpower and material availability and process preparation needed.

·         Prepares status report of on-going and ending maintenance work to track status for planning, preparation and execution.

·         Prepares shutdown work list for all jobs requiring unit shut down for implementation.

·         Prepares/updated job plan/shutdown work schedule for implementation during the shutdown.

·         Tracks progress and status of shutdown work items during a unit shut down and updates outstanding shutdown work

·         Prepares updated inspection program and schedule for vessels ,piping, structures, painting and insulation

·         Ensure, analyze and filing CBM reports are executed on time based on the schedule plan. (Vibration Analysis, Oil Analysis, Calibration, Thermo graphic, Survey, Earth ground, TEV, etc.

·         Responsible for implementation, data gathering and formatting of SAP PM project to operational. This included:

1. Data Gathering & formatting of Functional location, Equipment & BOM to be uploaded in the SAP system (O2, N2, H2, CO2, Argon Plants , Customer at site Plants, Cryogenic Tanks, Product Gases and Packaging sites).

2. Allocation of Maintenance Plan to each hierarchy functional location as per Linde Global PM and OEM maintenance Manual.

3. Failure Code Development

4. SAP DMS development (Document Management System)

Experience Hours (Planning & Scheduling): 
5000
Experience Hours (Cost Management): 
900
Experience Hours (Forensic Analysis): 
600