ANALYST / PLANNING ENGINEER, PBAD.SBG -Saudi Binladn Group, kudai station
Name:
Ahmed Tawfik Hassan
PMI - PMP
Contact:
Mob. : 00966561365628
E-mail : A4_A488@YAHOO.COM
Personal Information
Marital status :Married
National :Egyptian
D.O.B :16/2/1985
Age : 29 year“male”
MilitaryService :Finished
Education
2002-2007
FacultyofEngineering Mansoura UniversityEgypt BachelorofScienceinCivilEngineering (B.Sc.) major : steelstructure
GraduationProjectGrade :verygood
ProjectAdvisors : DR.NabilMahmoud &DR.FekriSalem
Professional certifications
- PMI – PMP
- Sap2000V14,AutoCAD2D.
- Computerprogramming.
- Officexp.
- Photoshop.
- Primavera. (P6- R8)
- Safe,csicolumn.
- Q.S.
- Internet applications.
Working
Worked as civil engineer in different job roles:
· Planning & Project Control Engineer
- In the biggest residential projects.
· Site Construction engineer:
- Execute all aspects of work for Traditional Residential high rise building including reinforcement concrete Skelton (simple beams, flat slabs, and hollow blocks), brick works, and high class finishing apartments.
· Quality Control Engineer:
- For Contractor Company in Constructions & Ready Mix Concrete.
Training :
ConsultantofficeEngineer.
Eng. MohsenBadra .
Position: Designer Engineer
Working:
September 2007 TILL February 2008: Cairo, Egypt
- ConsultingEngineeringLaboratories (CEL)
1) In“NubariaPowerStation750MWCombined
CycleProjectModuleIII“
UnderPejesco (Americanconsultantoffice)
Position: QualityControlEng.
Main Responsibilities:
· Responsible for Mix design For Concrete.
· Responsible for making Tests for Concrete.
· Responsible for accounting quantities for all materials.
· Calculating quantities for purchasing orders for concrete row materials, steel, bricks, etc.
Mars 2008 TILL September 2010: Jeddah, kingdom of Saudi Arabia
-SalmanMohammedsaidcompany
In many projects of:
1) Ministry of Education.
2) Ministry of Municipal and Rural Affairs.
Position: Project Eng.
Main Responsibilities:
· Following all the civil activity.
· Responsible for construction of the high rise building Skelton including raft foundation, flat slabs, simple beam slabs, hollow blocks, supervising all reinforced steel bar fixing work and formwork construction.
· Preparation for tenders and follow the corporations which execution the different jobs.
· Discuss and solve the problems with engineers of execution companies.
· Make regular meetings with sub-contractors.
· Contractor payment certificate.
· Calculating quantities for purchasing orders for concrete row materials,
Steel, bricks, etc.
Nov. 2010 TILL January 2012: Cairo, Egypt
TMG Holding:
TALAAT MOSTAFA Group (TMG) Holding is the leading community real estate developer in
Egypt, with a land bank of 50 million square meters. The group has a strong, 20-year track record
In the housing and real-estate development industry also extend to the hotels and resorts segment.
It has developed three large scale luxury hotels, Nile Plaza in Cairo, San Stefano in Alexandria,
And Four Seasons in SHARM EL SHEIKH, all managed by the internationally reputable
Four Seasons chain, in addition to two other Hotel & Resort projects currently under development.
MADINATY Project:
A city of international standards in Egypt.
A well-designed and detailed master plan was the result of a collaborative effort between
Three top U.S design firms: HHCP, SWA and SASAKI.
MADINATY is a city built on 8000 FEDDANS (33.6 million m²), designed to provide a modern life
For 600,000 inhabitants in 120,000 housing units acting as a modern extension to New Cairo
Making it the biggest of all-inclusive enclosed city in the Middle East.
Position: Project Eng.
January 2012 TILL Now: Jeddah, kingdom of Saudi Arabia
- Saudi Bin Ladin Group(SBG):
1) Infrastructure Project ( Roads and Buildings )
· Location : Gizan.
· Client : Ministry Of interior.
· Consultant : Dar Al-Handasah.
Position: Project Eng.
2) Makkah First Ring Road & Bus Station
· Location : Jeddah head office.
· Client : Ministry Of Finance.
· Consultant : Dar Al-Handasah.
Position: Planning Eng.
Main Responsibilities:
· Method and sequence of construction operations of the project.
· Monitor and prepare different progress and forecast reports as needed by the management / client/consultants.
· Resource and Time estimation for the activities.
· Make detailed status reports in MS Excel.
· Prepare detail progress reports for each area and each job including updated Photos from the site.
· Prepare Projects Presentations for the monthly Progress Meetings by Power Point.
Objective:
WorkingtoobtaininternshipinthefieldofCivil
EngineeringinNational/Multi-NationalleadingCompany
Languages:
Arabic:(MotherLanguage)
English:(Good)
- Company:
- Industry:
- Job Role:
- Project:
- Region: