(Senior) Scheduler, Prepare and Manage Baseline schedule, Daily, Weekly and Monthly reports., Odebrecht Contracting International Inc., Rehabilitation of 243 KM Railway
Professional Experience
Odebrecht Construction International – Liberia – (Mar 2012 to Present)
AML Compound, Buchanan City,
Liberia, West Africa
Position: Sr. Planning and Scheduling Engineer
Perform construction project planning utilizing Primavera P6 software. Develop and maintain comprehensive integrated master project schedules including Front-end Loading, Detail Design, Procurement, Construction and Start-up/Commissioning Project Stages etc,.
Communicate plan variances to the engineering and production management. Able to perform Time–Impact Analysis.
Develop and implement a basic change management system for schedules, provide project team schedule alerts, identify critical path, analyze progress trends, and recommend corrective action.
Prepare Preliminary Schedules to various Tendering, Projects involved - Civil works for Port Loading Operations, Concentrator site for Mining Operations, Mine and Camp Enabling Works, Stormwater Managemnent System, DAMS and Taililng management systems.
Project As a part of reinstatement of the iron ore operations in Liberia, a west coast country in Africa, OCII has been contracted by ArcelorMittal to rehabilitate the existing 262 Km of railway from the Port of Buchanan to Yekepa.
The scope of work also includes the rehabilitation of a total of eight (8) railway deck truss, through truss, plate girder steel bridges between Buchanan and Tokadeh, a total of 594 CMP culverts rehabilitation including cleaning, slip lining, open cut & concrete invert and maintenance of access roads.
AC Tajanlangit Construction and Builders Corporation – (Aug 2011 to Mar 2012)
2nd Floor ATM Building, Ledesma corner Jalandoni Sts.
Iloilo City 5000, Philippines
Position Operations Manager
Planning, Organizing, Directing and Controlling of On-going projects throughout Philippine islands, most projects are hotel buildings that includes, structural works, finishing/furnishings, site development, electromechanical services, heavy civil works, road works and underground utilities.
Attend Job explanation Meetings and Site visits for Tendering projects, prepare preliminary schedules, manage the estimating department, evaluate supplier and subcontractor offers, check and finalize tender costs and documents prior to submission.
B.L. Harbert International, L.L.C. - Jun 2008 to Aug 2011
1030 London Drive, Suite 400,
Birmingham, Alabama 35211, USA
Position: Project Planner / Scheduler
Manage the project schedule to ensure key financial and implementation milestones are met. Update and prepare the monthly management report and billing for issue to the Client – Overseas Building Operations (OBO).
Undertake regular field visits to gather up-to-date information on implementation. Day to day monitoring and management of the established Key Performance Indicator as outlined in the work plan.Recommend changes to the work plan if required and track variation orders
Project : Construction of New American Embassy Compound - August 2009 to Aug 2011
Country: Monrovia, Liberia, West Africa
Project : Construction of New American Embassy Compound - June 2008 to August 2009
Country: Ouagadougou, Burkina Faso, West Africa
AC Tajanlangit Construction and Builders Corporation – (Apr 2007 to Jun 2008)
2nd Floor ATM Building, Ledesma corner Jalandoni Sts.
Iloilo City 5000, Philippines
Position: Operations Manager
Planning, Organizing, Directing and Controlling of On-going projects throughout Philippine islands, most projects are hotel buildings that includes, structural works, finishing/furnishings, site development, electromechanical services, heavy civil works, road works and underground utilities.
Attend Job explanation Meetings and Site visits for Tendering projects, prepare preliminary schedules, manage the estimating department, evaluate supplier and subcontractor offers, check and finalize tender costs and documents prior to submission.
H.B. Zachry Company (International) – (Apr 2006 to Apr 2007)
527 Logwood, San Antonio,
Texas 78221-1738, USA
Position : Project Planner / Scheduler
Manage the project schedule to ensure key financial and implementation milestones are met. Update and prepare the monthly management report and billing for issue to the Client – Overseas Building Operations (OBO)
Undertake regular field visits to gather up-to-date information on implementation. Day to day monitoring and management of the established Key Performance Indicator as outlined in the work plan.
Recommend changes to the work plan if required and track variation orders
Project : Construction of New American Embassy Compound
Country: Quito, Ecuador
British Petroleum Philippines, Inc. (BPPI) – (Apr 2003 – Apr 2005)
Dino Compound, Labogon Road, Basak,
Mandaue City, Cebu, Philippines
Position Field Implementation Manager
Overall Planning, Organizing, Directing and Control of the Project sites. Manage the project schedule to ensure key financial and implementation milestones are met.
Update and prepare the monthly management report for issue to the Client (DAR). Undertake regular field visits to gather up-to-date information on implementation review and modify sub-contract structure to optimize performance.
Day to day monitoring and management of the established Key Performance Indicator as outlined in the work plan.
Ensure employees and contractors are following procedures and guidelines. Recommend changes to the work plan if required and track variation orders. Ensure employees and contractors are in compliance with BP’s HSSE policies and practices
Project: Electrification of the Department of Agrarian Reform Beneficiaries, Mindanao Island, Philippines
Freelance Planning Consultant
Client : Leighton Contractors Philippines, Inc. (Australian Firm)- June to October 2002
9/F Insular Life building6781 Ayala Avenue, Makati City, Philippines
Projects: Tendering of Various Civil Works, Mining works and Medium to High Rise Buildings, Commercial and Industrial Buildings, etc.
Client : Anderson Asphalt Philippines Inc. (Hong Kong Firm) - October to December 2001
Leighton Compound, Pulilan Interchange, Brgy Tibag, Pulilan, Bulacan, Philip[pines
Project : Asphalt Overlay – 89 km North Luzon Expressway Project
Leighton Contractors Philippines, Inc. (Australian Firm) – (Feb 2000 to Apr 2001)
9/F Insular Life building6781 Ayala Avenue,
Makati City, Philippines
Position Sr. Planning Engineer
Overall In-charge for the preparation of Tender and Pre-construction schedules
John Holland Contractor Inc. (Australian Firm) - (Feb 1996 to Feb 2000)
5 /F 115-117 Esteban Corner Herrera Sts.Legaspi Village,
Makati City, Philippines
Position: Sr. Planning Engineer
Update and prepare the monthly management report for issue to the Client. Undertake regular field visits to gather up-to-date information on implementation review and modify sub-contract structure to optimize performance.
Day to day monitoring and management of the established Key Performance Indicator as outlined in the work plan. Ensure employees and contractors are following procedures and guidelines. Recommend changes to the work plan if required and track variation orders.
Project : Malampaya Concrete Gravity Sub Structure- October 1998 – Feb 2000
Main Contractor - Halliburton Multinational Inc. (Brown & Root)
Owner - Shell Philippines Exploration B.V.
Scope of Works- Design, Procure, Build, Supervision and Tow - The sub structure constructed in Subic, Zambales, towed and installed to its location in Malampaya Oil Field, Palawan, about 500 Nautical Miles south of Manila.
It is about 80,000 Metric tons in weight, 12,000 metric tons of reinforcing steel, 35,000 cubic meters of concrete and approximately 500 tons of Mechanical outfitting.
Project : Quezon Power Plant Marine Facilities - April – October 1998
Owner -Bechtel Overseas Corp.
Project : JHP - Makati Main office - November 1997 April 1998
Overall In-charge for the preparation of Tender and Pre-construction schedules
Project : Belleview Tagaytay Condominiums - September 1996 to November 1997
Owner - Belle Corporation
Scope of Works - Procure, construct and supervise - 12-storey 30,000m2 total floor area + carpark 4,000m2 45 deg.–Slopped typed building - Tagaytay Highlands, Tagaytay City. Works include Bored piling and concreting, complete concrete structure, and complete electromechanical and finishing works.
Hands-on Computer Training Center – (Apr 1995 to Dec 1995)
2nd Floor La sallete Building, Valeria St.
Iloilo City, Philippines
Position Electronic Data Processing Instructor (Computer Software)
Courses Handled; Primavera Project Planner P3 (Basic), Autocad (Basic and Advance), Microsoft office software.
Al Osais International Holdings Company – (Oct 1988 to Mar 1995)
P. O. Box 1083, Dammam 31431, Kingdom of Saudi Arabia
Position Chief Estimator/Tender Planner - January 1992 to March 1995 (Head Office)
Attend Job explanation Meetings and Site visits for Tender projects, prepare preliminary schedules, collaborate with quantity surveyors and estimators, evaluate supplier and subcontractor offers, check and finalize tender costs and documents prior to submission.
Project : Construction of 12 KM Asphalt Road To Ministry of Interior, Royal Commission, Jubail,KSA
Site Engineer - November 1991 to January 1992
Owner - Bechtel Overseas Corp. KSA
Project : Construction of Aramco Built Government Schools – Dammam, KSA
Jr. Site Engineer - December 1990 to November 1991
Owner - Saudi Aramco (Arabian-American Oil Company)
Project : Const. of Ras Tanura Control Rooms and Communication Building - Rahima, Ras Tanura
Jr. Site Engineer - November 1989 to November 1990
Owner – Ras Tanura Refinery, Saudi Aramco (Arabian-American Oil Company)
Project : Const. of Aramco Built Govt. Schools – 3 Buildings. in Rahima, Ras Tanura
Jr. Site Engineer - October 1988 to November 1989
Owner - Saudi Aramco (Arabian-American Oil Company)
Professional Experience
Odebrecht Construction International – Liberia – (Mar 2012 to Present)
AML Compound, Buchanan City,
Liberia, West Africa
Position: Sr. Planning and Scheduling Engineer
Perform construction project planning utilizing Primavera P6 software. Develop and maintain comprehensive integrated master project schedules including Front-end Loading, Detail Design, Procurement, Construction and Start-up/Commissioning Project Stages etc,.
Communicate plan variances to the engineering and production management. Able to perform Time–Impact Analysis.
Develop and implement a basic change management system for schedules, provide project team schedule alerts, identify critical path, analyze progress trends, and recommend corrective action.
Prepare Preliminary Schedules to various Tendering, Projects involved - Civil works for Port Loading Operations, Concentrator site for Mining Operations, Mine and Camp Enabling Works, Stormwater Managemnent System, DAMS and Taililng management systems.
Project As a part of reinstatement of the iron ore operations in Liberia, a west coast country in Africa, OCII has been contracted by ArcelorMittal to rehabilitate the existing 262 Km of railway from the Port of Buchanan to Yekepa.
The scope of work also includes the rehabilitation of a total of eight (8) railway deck truss, through truss, plate girder steel bridges between Buchanan and Tokadeh, a total of 594 CMP culverts rehabilitation including cleaning, slip lining, open cut & concrete invert and maintenance of access roads.
AC Tajanlangit Construction and Builders Corporation – (Aug 2011 to Mar 2012)
2nd Floor ATM Building, Ledesma corner Jalandoni Sts.
Iloilo City 5000, Philippines
Position Operations Manager
Planning, Organizing, Directing and Controlling of On-going projects throughout Philippine islands, most projects are hotel buildings that includes, structural works, finishing/furnishings, site development, electromechanical services, heavy civil works, road works and underground utilities.
Attend Job explanation Meetings and Site visits for Tendering projects, prepare preliminary schedules, manage the estimating department, evaluate supplier and subcontractor offers, check and finalize tender costs and documents prior to submission.
B.L. Harbert International, L.L.C. - Jun 2008 to Aug 2011
1030 London Drive, Suite 400,
Birmingham, Alabama 35211, USA
Position: Project Planner / Scheduler
Manage the project schedule to ensure key financial and implementation milestones are met. Update and prepare the monthly management report and billing for issue to the Client – Overseas Building Operations (OBO).
Undertake regular field visits to gather up-to-date information on implementation. Day to day monitoring and management of the established Key Performance Indicator as outlined in the work plan.Recommend changes to the work plan if required and track variation orders
Project : Construction of New American Embassy Compound - August 2009 to Aug 2011
Country: Monrovia, Liberia, West Africa
Project : Construction of New American Embassy Compound - June 2008 to August 2009
Country: Ouagadougou, Burkina Faso, West Africa
AC Tajanlangit Construction and Builders Corporation – (Apr 2007 to Jun 2008)
2nd Floor ATM Building, Ledesma corner Jalandoni Sts.
Iloilo City 5000, Philippines
Position: Operations Manager
Planning, Organizing, Directing and Controlling of On-going projects throughout Philippine islands, most projects are hotel buildings that includes, structural works, finishing/furnishings, site development, electromechanical services, heavy civil works, road works and underground utilities.
Attend Job explanation Meetings and Site visits for Tendering projects, prepare preliminary schedules, manage the estimating department, evaluate supplier and subcontractor offers, check and finalize tender costs and documents prior to submission.
H.B. Zachry Company (International) – (Apr 2006 to Apr 2007)
527 Logwood, San Antonio,
Texas 78221-1738, USA
Position : Project Planner / Scheduler
Manage the project schedule to ensure key financial and implementation milestones are met. Update and prepare the monthly management report and billing for issue to the Client – Overseas Building Operations (OBO)
Undertake regular field visits to gather up-to-date information on implementation. Day to day monitoring and management of the established Key Performance Indicator as outlined in the work plan.
Recommend changes to the work plan if required and track variation orders
Project : Construction of New American Embassy Compound
Country: Quito, Ecuador
British Petroleum Philippines, Inc. (BPPI) – (Apr 2003 – Apr 2005)
Dino Compound, Labogon Road, Basak,
Mandaue City, Cebu, Philippines
Position Field Implementation Manager
Overall Planning, Organizing, Directing and Control of the Project sites. Manage the project schedule to ensure key financial and implementation milestones are met.
Update and prepare the monthly management report for issue to the Client (DAR). Undertake regular field visits to gather up-to-date information on implementation review and modify sub-contract structure to optimize performance.
Day to day monitoring and management of the established Key Performance Indicator as outlined in the work plan.
Ensure employees and contractors are following procedures and guidelines. Recommend changes to the work plan if required and track variation orders. Ensure employees and contractors are in compliance with BP’s HSSE policies and practices
Project: Electrification of the Department of Agrarian Reform Beneficiaries, Mindanao Island, Philippines
Freelance Planning Consultant
Client : Leighton Contractors Philippines, Inc. (Australian Firm)- June to October 2002
9/F Insular Life building6781 Ayala Avenue, Makati City, Philippines
Projects: Tendering of Various Civil Works, Mining works and Medium to High Rise Buildings, Commercial and Industrial Buildings, etc.
Client : Anderson Asphalt Philippines Inc. (Hong Kong Firm) - October to December 2001
Leighton Compound, Pulilan Interchange, Brgy Tibag, Pulilan, Bulacan, Philip[pines
Project : Asphalt Overlay – 89 km North Luzon Expressway Project
Leighton Contractors Philippines, Inc. (Australian Firm) – (Feb 2000 to Apr 2001)
9/F Insular Life building6781 Ayala Avenue,
Makati City, Philippines
Position Sr. Planning Engineer
Overall In-charge for the preparation of Tender and Pre-construction schedules
John Holland Contractor Inc. (Australian Firm) - (Feb 1996 to Feb 2000)
5 /F 115-117 Esteban Corner Herrera Sts.Legaspi Village,
Makati City, Philippines
Position: Sr. Planning Engineer
Update and prepare the monthly management report for issue to the Client. Undertake regular field visits to gather up-to-date information on implementation review and modify sub-contract structure to optimize performance.
Day to day monitoring and management of the established Key Performance Indicator as outlined in the work plan. Ensure employees and contractors are following procedures and guidelines. Recommend changes to the work plan if required and track variation orders.
Project : Malampaya Concrete Gravity Sub Structure- October 1998 – Feb 2000
Main Contractor - Halliburton Multinational Inc. (Brown & Root)
Owner - Shell Philippines Exploration B.V.
Scope of Works- Design, Procure, Build, Supervision and Tow - The sub structure constructed in Subic, Zambales, towed and installed to its location in Malampaya Oil Field, Palawan, about 500 Nautical Miles south of Manila.
It is about 80,000 Metric tons in weight, 12,000 metric tons of reinforcing steel, 35,000 cubic meters of concrete and approximately 500 tons of Mechanical outfitting.
Project : Quezon Power Plant Marine Facilities - April – October 1998
Owner -Bechtel Overseas Corp.
Project : JHP - Makati Main office - November 1997 April 1998
Overall In-charge for the preparation of Tender and Pre-construction schedules
Project : Belleview Tagaytay Condominiums - September 1996 to November 1997
Owner - Belle Corporation
Scope of Works - Procure, construct and supervise - 12-storey 30,000m2 total floor area + carpark 4,000m2 45 deg.–Slopped typed building - Tagaytay Highlands, Tagaytay City. Works include Bored piling and concreting, complete concrete structure, and complete electromechanical and finishing works.
Hands-on Computer Training Center – (Apr 1995 to Dec 1995)
2nd Floor La sallete Building, Valeria St.
Iloilo City, Philippines
Position Electronic Data Processing Instructor (Computer Software)
Courses Handled; Primavera Project Planner P3 (Basic), Autocad (Basic and Advance), Microsoft office software.
Al Osais International Holdings Company – (Oct 1988 to Mar 1995)
P. O. Box 1083, Dammam 31431, Kingdom of Saudi Arabia
Position Chief Estimator/Tender Planner - January 1992 to March 1995 (Head Office)
Attend Job explanation Meetings and Site visits for Tender projects, prepare preliminary schedules, collaborate with quantity surveyors and estimators, evaluate supplier and subcontractor offers, check and finalize tender costs and documents prior to submission.
Project : Construction of 12 KM Asphalt Road To Ministry of Interior, Royal Commission, Jubail,KSA
Site Engineer - November 1991 to January 1992
Owner - Bechtel Overseas Corp. KSA
Project : Construction of Aramco Built Government Schools – Dammam, KSA
Jr. Site Engineer - December 1990 to November 1991
Owner - Saudi Aramco (Arabian-American Oil Company)
Project : Const. of Ras Tanura Control Rooms and Communication Building - Rahima, Ras Tanura
Jr. Site Engineer - November 1989 to November 1990
Owner – Ras Tanura Refinery, Saudi Aramco (Arabian-American Oil Company)
Project : Const. of Aramco Built Govt. Schools – 3 Buildings. in Rahima, Ras Tanura
Jr. Site Engineer - October 1988 to November 1989
Owner - Saudi Aramco (Arabian-American Oil Company)
- Company:
- Industry:
- Job Role:
- Project:
- Region:
- Skills & Expertise: