Website Upgrade Incoming - we're working on a new look (and speed!) standby while we finalise the project

(Senior) Scheduler, Prepare and Manage Baseline schedule, Daily, Weekly and Monthly reports., Odebrecht Contracting International Inc., Rehabilitation of 243 KM Railway

START Date: 
March, 2012

Professional Experience

 

Odebrecht Construction International – Liberia – (Mar 2012 to Present)

AML Compound, Buchanan City,

Liberia, West Africa

 

Position:               Sr. Planning and Scheduling Engineer

Perform construction project planning utilizing Primavera P6 software. Develop and maintain comprehensive integrated master project schedules including Front-end Loading, Detail Design, Procurement, Construction and Start-up/Commissioning Project Stages etc,.

Communicate plan variances to the engineering and production management. Able to perform Time–Impact Analysis.

Develop and implement a basic change management system for schedules, provide project team schedule alerts, identify critical path, analyze progress trends, and recommend corrective action.

Prepare Preliminary Schedules to various Tendering, Projects involved - Civil works for Port Loading Operations, Concentrator site for Mining Operations, Mine and Camp Enabling Works, Stormwater Managemnent System, DAMS and Taililng management systems.

 

Project                   As a part of reinstatement of the iron ore operations in Liberia, a west coast country in Africa, OCII has been contracted by ArcelorMittal to rehabilitate the existing 262 Km of railway from the Port of Buchanan to Yekepa.

The scope of work also includes the rehabilitation of a total of eight (8) railway deck truss, through truss, plate girder steel bridges between Buchanan and Tokadeh, a total of 594 CMP culverts rehabilitation including cleaning, slip lining, open cut & concrete invert and maintenance of access roads.

 

 

 


 

AC Tajanlangit Construction and Builders Corporation – (Aug 2011 to Mar 2012)

2nd Floor ATM Building, Ledesma corner Jalandoni Sts.

Iloilo City 5000, Philippines

 

Position                 Operations Manager

Planning, Organizing, Directing and Controlling of On-going projects throughout Philippine islands, most projects are hotel buildings that includes, structural works, finishing/furnishings, site development, electromechanical services, heavy civil works, road works and underground utilities.

Attend Job explanation Meetings and Site visits for Tendering projects, prepare preliminary schedules, manage the estimating department, evaluate supplier and subcontractor offers, check and finalize tender costs and documents prior to submission.

 

 


 

B.L. Harbert International, L.L.C. - Jun 2008 to Aug 2011

1030 London Drive, Suite 400,

Birmingham, Alabama 35211, USA

 

Position:               Project Planner / Scheduler

Manage the project schedule to ensure key financial and implementation milestones are met. Update and prepare the monthly management report and billing for issue to the Client – Overseas Building Operations (OBO).

Undertake regular field visits to gather up-to-date information on implementation. Day to day monitoring and management of the established Key Performance Indicator as outlined in the work plan.Recommend changes to the work plan if required and track variation orders

 

Project   :               Construction of New American Embassy Compound - August 2009 to Aug 2011

Country:               Monrovia, Liberia, West Africa

 

Project   :               Construction of New American Embassy Compound - June 2008 to August 2009

Country:               Ouagadougou, Burkina Faso, West Africa

 

 

 


 

AC Tajanlangit Construction and Builders Corporation – (Apr 2007 to Jun 2008)

2nd Floor ATM Building, Ledesma corner Jalandoni Sts.

Iloilo City 5000, Philippines

 

Position:               Operations Manager

Planning, Organizing, Directing and Controlling of On-going projects throughout Philippine islands, most projects are hotel buildings that includes, structural works, finishing/furnishings, site development, electromechanical services, heavy civil works, road works and underground utilities.

Attend Job explanation Meetings and Site visits for Tendering projects, prepare preliminary schedules, manage the estimating department, evaluate supplier and subcontractor offers, check and finalize tender costs and documents prior to submission.

 

 


 

H.B. Zachry Company (International) – (Apr 2006 to Apr 2007)

527 Logwood, San Antonio,

Texas 78221-1738, USA

 

Position :               Project Planner / Scheduler

Manage the project schedule to ensure key financial and implementation milestones are met. Update and prepare the monthly management report and billing for issue to the Client – Overseas Building Operations (OBO)

Undertake regular field visits to gather up-to-date information on implementation. Day to day monitoring and management of the established Key Performance Indicator as outlined in the work plan.

Recommend changes to the work plan if required and track variation orders

 

Project   :               Construction of New American Embassy Compound

Country:               Quito, Ecuador

 

 


 

British Petroleum Philippines, Inc. (BPPI) – (Apr 2003 – Apr 2005)

Dino Compound, Labogon Road, Basak,

Mandaue City, Cebu, Philippines

 

Position                Field Implementation Manager

                                Overall Planning, Organizing, Directing and Control of the Project sites. Manage the project schedule to ensure key financial and implementation milestones are met.

                               

                               

 

                                Update and prepare the monthly management report for issue to the Client (DAR). Undertake regular field visits to gather up-to-date information on implementation review and modify sub-contract structure to optimize performance.

                                Day to day monitoring and management of the established Key Performance Indicator  as outlined in the work plan.

Ensure employees and contractors are following procedures and guidelines. Recommend changes to the work plan if required and track variation orders. Ensure employees and contractors are in compliance with BP’s HSSE policies and practices

 

Project:                  Electrification of the Department of Agrarian Reform Beneficiaries, Mindanao Island, Philippines

                               

 


 

Freelance Planning Consultant

 

Client     :               Leighton Contractors Philippines, Inc. (Australian Firm)- June to October 2002

                                9/F Insular Life building6781 Ayala Avenue, Makati City, Philippines

Projects:                Tendering of Various Civil Works, Mining works and Medium to High Rise Buildings, Commercial and Industrial Buildings, etc.

 

Client     :               Anderson Asphalt Philippines Inc. (Hong Kong Firm) - October to December 2001

                                Leighton Compound, Pulilan Interchange, Brgy Tibag, Pulilan, Bulacan, Philip[pines

Project   :               Asphalt Overlay – 89 km North Luzon Expressway Project

 

 

 


 

Leighton Contractors Philippines, Inc. (Australian Firm) – (Feb 2000 to Apr 2001)

9/F Insular Life building6781 Ayala Avenue,

Makati City, Philippines

 

Position                Sr. Planning Engineer

Overall In-charge for the preparation of Tender and Pre-construction schedules

 

 

 


 

John Holland Contractor Inc. (Australian Firm) - (Feb 1996 to Feb 2000)

5 /F 115-117 Esteban Corner Herrera Sts.Legaspi Village,

Makati City, Philippines

 

Position:               Sr. Planning Engineer

                                Update and prepare the monthly management report for issue to the Client. Undertake regular field visits to gather up-to-date information on implementation review and modify sub-contract structure to optimize performance.

                                Day to day monitoring and management of the established Key Performance Indicator  as outlined in the work plan. Ensure employees and contractors are following procedures and guidelines. Recommend changes to the work plan if required and track variation orders.

 

Project   :               Malampaya Concrete Gravity Sub Structure- October 1998 – Feb 2000

Main Contractor - Halliburton Multinational Inc. (Brown & Root)

Owner - Shell Philippines Exploration B.V.

                               

Scope of Works- Design, Procure, Build, Supervision and Tow - The sub structure constructed in Subic, Zambales, towed and installed to its location in Malampaya Oil Field, Palawan, about 500 Nautical Miles south of Manila.

It is about 80,000 Metric tons in weight, 12,000 metric tons of reinforcing steel, 35,000 cubic meters of concrete and approximately 500 tons of Mechanical outfitting.

 

Project   :               Quezon Power Plant Marine Facilities - April – October 1998

Owner -Bechtel Overseas Corp.

 

Project   :               JHP - Makati Main office - November 1997 April 1998

Overall In-charge for the preparation of Tender and Pre-construction schedules

 

Project   :               Belleview Tagaytay Condominiums - September 1996 to November 1997

                                Owner - Belle Corporation

Scope of Works - Procure, construct and supervise - 12-storey 30,000m2 total floor area + carpark 4,000m2 45 deg.–Slopped typed building - Tagaytay Highlands, Tagaytay City. Works include Bored piling and concreting, complete concrete structure, and complete electromechanical and finishing works.

 

 


 

Hands-on Computer Training Center – (Apr 1995 to Dec 1995)

2nd Floor La sallete Building, Valeria St.

Iloilo City, Philippines

 

Position                Electronic Data Processing Instructor (Computer Software)

                                Courses Handled; Primavera Project Planner P3 (Basic), Autocad (Basic and Advance), Microsoft office software.

 

 


 

Al Osais International Holdings Company – (Oct 1988 to Mar 1995)

P. O. Box 1083, Dammam 31431, Kingdom of Saudi Arabia

 

Position                Chief Estimator/Tender Planner - January 1992 to March 1995 (Head Office)

Attend Job explanation Meetings and Site visits for Tender projects, prepare preliminary schedules, collaborate with quantity surveyors and  estimators, evaluate supplier and subcontractor offers, check and finalize tender costs and documents prior to submission.

 

Project   :               Construction of 12 KM Asphalt Road To Ministry of Interior, Royal Commission, Jubail,KSA

Site Engineer - November 1991 to January 1992

                                Owner - Bechtel Overseas Corp. KSA

 

Project   :               Construction of Aramco Built Government Schools –  Dammam, KSA

Jr. Site Engineer - December 1990 to November 1991

Owner - Saudi Aramco (Arabian-American Oil Company)

 

Project   :               Const. of Ras Tanura Control Rooms and Communication Building - Rahima, Ras Tanura

                                Jr. Site Engineer - November 1989 to November 1990

                                Owner – Ras Tanura Refinery, Saudi Aramco (Arabian-American Oil Company)

 

Project   :               Const. of Aramco Built Govt. Schools – 3 Buildings. in Rahima, Ras Tanura

                                Jr. Site Engineer - October 1988 to November 1989

                                Owner - Saudi Aramco (Arabian-American Oil Company)

Professional Experience

 

Odebrecht Construction International – Liberia – (Mar 2012 to Present)

AML Compound, Buchanan City,

Liberia, West Africa

 

Position:               Sr. Planning and Scheduling Engineer

Perform construction project planning utilizing Primavera P6 software. Develop and maintain comprehensive integrated master project schedules including Front-end Loading, Detail Design, Procurement, Construction and Start-up/Commissioning Project Stages etc,.

Communicate plan variances to the engineering and production management. Able to perform Time–Impact Analysis.

Develop and implement a basic change management system for schedules, provide project team schedule alerts, identify critical path, analyze progress trends, and recommend corrective action.

Prepare Preliminary Schedules to various Tendering, Projects involved - Civil works for Port Loading Operations, Concentrator site for Mining Operations, Mine and Camp Enabling Works, Stormwater Managemnent System, DAMS and Taililng management systems.

 

Project                   As a part of reinstatement of the iron ore operations in Liberia, a west coast country in Africa, OCII has been contracted by ArcelorMittal to rehabilitate the existing 262 Km of railway from the Port of Buchanan to Yekepa.

The scope of work also includes the rehabilitation of a total of eight (8) railway deck truss, through truss, plate girder steel bridges between Buchanan and Tokadeh, a total of 594 CMP culverts rehabilitation including cleaning, slip lining, open cut & concrete invert and maintenance of access roads.

 

 

 


AC Tajanlangit Construction and Builders Corporation – (Aug 2011 to Mar 2012)

2nd Floor ATM Building, Ledesma corner Jalandoni Sts.

Iloilo City 5000, Philippines

 

Position                 Operations Manager

Planning, Organizing, Directing and Controlling of On-going projects throughout Philippine islands, most projects are hotel buildings that includes, structural works, finishing/furnishings, site development, electromechanical services, heavy civil works, road works and underground utilities.

Attend Job explanation Meetings and Site visits for Tendering projects, prepare preliminary schedules, manage the estimating department, evaluate supplier and subcontractor offers, check and finalize tender costs and documents prior to submission.

 

 


B.L. Harbert International, L.L.C. - Jun 2008 to Aug 2011

1030 London Drive, Suite 400,

Birmingham, Alabama 35211, USA

 

Position:               Project Planner / Scheduler

Manage the project schedule to ensure key financial and implementation milestones are met. Update and prepare the monthly management report and billing for issue to the Client – Overseas Building Operations (OBO).

Undertake regular field visits to gather up-to-date information on implementation. Day to day monitoring and management of the established Key Performance Indicator as outlined in the work plan.Recommend changes to the work plan if required and track variation orders

 

Project   :               Construction of New American Embassy Compound - August 2009 to Aug 2011

Country:               Monrovia, Liberia, West Africa

 

Project   :               Construction of New American Embassy Compound - June 2008 to August 2009

Country:               Ouagadougou, Burkina Faso, West Africa

 

 

 


AC Tajanlangit Construction and Builders Corporation – (Apr 2007 to Jun 2008)

2nd Floor ATM Building, Ledesma corner Jalandoni Sts.

Iloilo City 5000, Philippines

 

Position:          Operations Manager

Planning, Organizing, Directing and Controlling of On-going projects throughout Philippine islands, most projects are hotel buildings that includes, structural works, finishing/furnishings, site development, electromechanical services, heavy civil works, road works and underground utilities.

Attend Job explanation Meetings and Site visits for Tendering projects, prepare preliminary schedules, manage the estimating department, evaluate supplier and subcontractor offers, check and finalize tender costs and documents prior to submission.

 

 


H.B. Zachry Company (International) – (Apr 2006 to Apr 2007)

527 Logwood, San Antonio,

Texas 78221-1738, USA

 

Position :               Project Planner / Scheduler

Manage the project schedule to ensure key financial and implementation milestones are met. Update and prepare the monthly management report and billing for issue to the Client – Overseas Building Operations (OBO)

Undertake regular field visits to gather up-to-date information on implementation. Day to day monitoring and management of the established Key Performance Indicator as outlined in the work plan.

Recommend changes to the work plan if required and track variation orders

 

Project   :               Construction of New American Embassy Compound

Country:               Quito, Ecuador

 

 


British Petroleum Philippines, Inc. (BPPI) – (Apr 2003 – Apr 2005)

Dino Compound, Labogon Road, Basak,

Mandaue City, Cebu, Philippines

 

Position                Field Implementation Manager

                                Overall Planning, Organizing, Directing and Control of the Project sites. Manage the project schedule to ensure key financial and implementation milestones are met.

                               

                               

 

                                Update and prepare the monthly management report for issue to the Client (DAR). Undertake regular field visits to gather up-to-date information on implementation review and modify sub-contract structure to optimize performance.

                                Day to day monitoring and management of the established Key Performance Indicator  as outlined in the work plan.

Ensure employees and contractors are following procedures and guidelines. Recommend changes to the work plan if required and track variation orders. Ensure employees and contractors are in compliance with BP’s HSSE policies and practices

 

Project:                  Electrification of the Department of Agrarian Reform Beneficiaries, Mindanao Island, Philippines

                               

 


Freelance Planning Consultant

 

Client     :               Leighton Contractors Philippines, Inc. (Australian Firm)- June to October 2002

                                9/F Insular Life building6781 Ayala Avenue, Makati City, Philippines

Projects:                Tendering of Various Civil Works, Mining works and Medium to High Rise Buildings, Commercial and Industrial Buildings, etc.

 

Client     :               Anderson Asphalt Philippines Inc. (Hong Kong Firm) - October to December 2001

                                Leighton Compound, Pulilan Interchange, Brgy Tibag, Pulilan, Bulacan, Philip[pines

Project   :               Asphalt Overlay – 89 km North Luzon Expressway Project

 

 

 


Leighton Contractors Philippines, Inc. (Australian Firm) – (Feb 2000 to Apr 2001)

9/F Insular Life building6781 Ayala Avenue,

Makati City, Philippines

 

Position                Sr. Planning Engineer

Overall In-charge for the preparation of Tender and Pre-construction schedules

 

 

 


John Holland Contractor Inc. (Australian Firm) - (Feb 1996 to Feb 2000)

5 /F 115-117 Esteban Corner Herrera Sts.Legaspi Village,

Makati City, Philippines

 

Position:               Sr. Planning Engineer

                                Update and prepare the monthly management report for issue to the Client. Undertake regular field visits to gather up-to-date information on implementation review and modify sub-contract structure to optimize performance.

                                Day to day monitoring and management of the established Key Performance Indicator  as outlined in the work plan. Ensure employees and contractors are following procedures and guidelines. Recommend changes to the work plan if required and track variation orders.

 

Project   :               Malampaya Concrete Gravity Sub Structure- October 1998 – Feb 2000

Main Contractor - Halliburton Multinational Inc. (Brown & Root)

Owner - Shell Philippines Exploration B.V.

                               

Scope of Works- Design, Procure, Build, Supervision and Tow - The sub structure constructed in Subic, Zambales, towed and installed to its location in Malampaya Oil Field, Palawan, about 500 Nautical Miles south of Manila.

It is about 80,000 Metric tons in weight, 12,000 metric tons of reinforcing steel, 35,000 cubic meters of concrete and approximately 500 tons of Mechanical outfitting.

 

Project   :               Quezon Power Plant Marine Facilities - April – October 1998

Owner -Bechtel Overseas Corp.

 

Project   :               JHP - Makati Main office - November 1997 April 1998

Overall In-charge for the preparation of Tender and Pre-construction schedules

 

Project   :               Belleview Tagaytay Condominiums - September 1996 to November 1997

                                Owner - Belle Corporation

Scope of Works - Procure, construct and supervise - 12-storey 30,000m2 total floor area + carpark 4,000m2 45 deg.–Slopped typed building - Tagaytay Highlands, Tagaytay City. Works include Bored piling and concreting, complete concrete structure, and complete electromechanical and finishing works.

 

 


Hands-on Computer Training Center – (Apr 1995 to Dec 1995)

2nd Floor La sallete Building, Valeria St.

Iloilo City, Philippines

 

Position                Electronic Data Processing Instructor (Computer Software)

                                Courses Handled; Primavera Project Planner P3 (Basic), Autocad (Basic and Advance), Microsoft office software.

 

 


Al Osais International Holdings Company – (Oct 1988 to Mar 1995)

P. O. Box 1083, Dammam 31431, Kingdom of Saudi Arabia

 

Position                Chief Estimator/Tender Planner - January 1992 to March 1995 (Head Office)

Attend Job explanation Meetings and Site visits for Tender projects, prepare preliminary schedules, collaborate with quantity surveyors and  estimators, evaluate supplier and subcontractor offers, check and finalize tender costs and documents prior to submission.

 

Project   :               Construction of 12 KM Asphalt Road To Ministry of Interior, Royal Commission, Jubail,KSA

Site Engineer - November 1991 to January 1992

                                Owner - Bechtel Overseas Corp. KSA

 

Project   :               Construction of Aramco Built Government Schools –  Dammam, KSA

Jr. Site Engineer - December 1990 to November 1991

Owner - Saudi Aramco (Arabian-American Oil Company)

 

Project   :               Const. of Ras Tanura Control Rooms and Communication Building - Rahima, Ras Tanura

                                Jr. Site Engineer - November 1989 to November 1990

                                Owner – Ras Tanura Refinery, Saudi Aramco (Arabian-American Oil Company)

 

Project   :               Const. of Aramco Built Govt. Schools – 3 Buildings. in Rahima, Ras Tanura

                                Jr. Site Engineer - October 1988 to November 1989

                                Owner - Saudi Aramco (Arabian-American Oil Company)