Hull Engineer, Unithai Shipyard and Engineering Ltd, Shiprepair- Shipbuilding
Detailed Functions (ship repair):
· Coordinate to the in-charge project superintendent/manager to get work specification regarding the project.
· Planning and scheduling of manpower and the availability of materials needed in the project considering the date of completion.
· Review approved plans and working drawings if any new fabrication/ conversion/ modification involved.
· Preparing equipment (welding machines, blower and other related tools & equipments)
· Assist class surveyor for tank inspections to confirm additional job
· Daily inspections of work given to workers to check fitting provisions and welding quality prior to the Classification Society Standards.
· Coordinates to other departments to avoid conflict on work schedule.
· Detailing / measuring works done in preparation to bill
· Control cost of project manpower & minimizing materials and consumables wastages
· Perform / conduct non-destructive testing such as vacuum testing, hose testing, dye penetrant test, hydrostatic test and air testing.
Detailed Functions (shipbuilding):
· Receives and understand contract specification of approved plans and
working drawings.
· Assign loft’s men to lay-out mark the required lines on the mould loft
floor based on the table of offsets and make necessary templates.
· Prepare daily schedule for workers and delegates to worksite.
· Supervise works in accordance with the approved plan.
· Identify and prepare list of materials needed to be supplied by the
yard that are not available to the warehouse.
· Prepare schedules for erection of fabricated panel or block and arrange to motor pool the necessary equipments such as forklift, trailer & cranes.
· Prepare schedule of tank testing base on target date of completion and in process inspection of quality control section.
· Holds regular meeting with foremen in order to identify
problems encountered on production & matters affecting the schedule.
· Prepare schedule for inspection by the class surveyor.
· Prepare Inspection Testing Record and gets approval authority to sign.
· Responsible for controlling cost of project, proper utilization of labor &
minimizing wastages based on materials issuance against consumed.