Senior Civil Engineer, GRRL, US Air Force,ECCI
RESUME
KIRAN K UNDEKAR
AT-DHOL
POST- HALGA
KARWAR-581328
KARNATAKA, INDIA
E-mail: kiranundekar@gmail.com
Contact No:
India—09480443240,09449955422
Afghanistan--0093781395879
Objective:-Seeking a challenging career as an engineer to interpret my analytical and technical skill in the engineering field. Quest to work in real professional atmosphere that enable me to cope with the engineering as well as latest technology and scope for widening the spectrum of my knowledge.
Civil Engineer
Introduction:
Civil Engineer with good skill of handling projects like construction of residential complex, water retaining structures like service reservoirs, Pumping Station/Pump House, culverts ,circular water & fuel tank Foundations .Consumer Sub-station, Ammunition building,Reacter Auxiliary Building, Turbine building Skilled at handling the projects independently.
Education: 1) PUC science (Two years)
2) Diploma in Civil Engineering, Govt polytechnic karwar, Karnataka. India
Computer knowledge: M S Office, AutoCAD, MS Project
Work Experience:
SL NO | COMPANY | PROJECT | CLIENT | DESIGNATION | YEAR | PLACE
|
1 | GOLDEN RELIEF RESOURCES LLC | US ARMY PROJECTS | US AIRFORCE | Senior Civil Engineer | May 2012to till date | Afghanistan (Kandahar) |
2 | LARSEN &TOUBRO ELECTROMECH LLC | OILSTORAGE & TERMINAL FACILITY | OOT(Oil tanking odefjell terminals) | Civil Engineer | April 2010 to April 2012
| Oman. Sohar (Gulf) |
3 | STRABAG QATAR W.L.L | GTL(GAS TO LIQUID)World’s biggest project | SHELL(Oil & Gas) | QA/QC Engineer | January2009 to September2009 | Doha. Qatar (Gulf) |
4 | LARSEN &TOUB RO ELECTROMECH LLC | OILSTORAGE & TERMINAL FACILITY | OOT(Oil tanking odefjell terminals) | Civil Engineer | August 2007 to September 2008
| Oman. Sohar (Gulf) |
5 | GAMMON AL-MATAR JV LLC | Independent Water and power Project(IWPP) | Energoprojekt Entel LLC | Civil Site Engineer | March 2006 to June 2007 | Oman.Sohar. (Gulf) |
6 | GAMMON INDIA LTD | NUCLEAR POWER CORPORATION KAIGA PROJECT 3&4 | NUCLEAR POWER CORPORATION KAIGA | Engineer assistant | May 2002 to March 2006 | Karnataka. India |
7 | N.sukumaran (class 1contractor) | Punching building ,culverts etc | NUCLEAR POWER CORPORATION KAIGA | Trainee Engineer | July 2001 to May2002 | Karnataka. India |
JOB PROFILE:
Work Experience:1) Golden Relief Resources Ltd LLC.-----Completed work of Roof Slab and finishing work of Ammunition building--1, Ammunition building –2 with k--span roof near flight line area, Cab-Aloc building,Concrete pads with K-span Roof, Box culverts and its all plumbing work, Tendering of new projects.
Working as Senior Civil Engineer:-
1) Execution of all structural work and its all finishing work.
2) Site Activity planning as per priority of work and schedule
3) Having site visit & preparation of BOQ for project & making quote as per given statement of work.
4) Estimation of quantities of civil material and providing work order for project.
5) All super structure and sub- structure plumbing work
6) Rectification of all punch list points raised by the client for final Handover of Project
7) HVAC Ducting work, Wall with Frame stud material, Roof with K-span sheet.
8) Preparing Bar Bending schedule and Formwork details
9) Surveying with Theodolite.
Work Experience: 2)LARSEN &TOUBRO Electromech LLC----Completed work of Pump-House-4, Consumer Sub-Station 3& 5,Potable water tank foundation,Culvert with Retaining wall,Sleepers,Pipe supports,Dyke wall, Oil Tank Foundations, Fire water shelter, pipe rack support etc
Working as a Civil Engineer (Site Engineer): --
1)With all individual execution, checking with clients, planning and all necessary
Arrangement with safety permits near oil and gas pipelines and fuel tanks.
2)Preparing new proposal as per site condition near pipeline and fuel tanks.
3)Using Approved materials.
4) Preparing Bar Bending Schedule and Formwork.
5)Keeping recodes of Daily progress Report and making weekly site activity planning
6)Internal road and drain works around the fuel tanks.
7)Pre-cast work of pedestal and drain.
Note:-The all above work completed with respect to safety permit near live oil and gas pipeline and fuel tanks.
Work experience: 3) ‘STRABAG, QATAR WLL’---GTL PROJECT (World’s Biggest Project)
Working as a QA/QC Engineer: Working by referring with all approved specifications, method statement, BS-EN Code standards, QCS Standards, DEP’s (Design Engineering Practice) etc.
1) Checking of materials withApproved material information.
2) Collecting all test certificates of materials by good communication with supplier
3) Checking of site activities with approved drawings and specifications.
4) Providing method statement and ITP (Inspection testing plan) for site activity.
5) Inviting clients for checking of site activity before proceeding next activity
6) Preparing pre-checklist and post checklists of activities.
7) Conducting tests, like water tightness test of Man hole, main sump pit; compaction tests of backfilled material; flow test of concrete etc.
8) Preparing final punch lists with clients to hand over the structure
TRAINING COMPLETED IN PEARL GTL PROJECT (SHELL)
Introduction to HSE & Leadership
2) Supervision with LCA (Life Critical Activities)
3) Communication skills TTT (Train The Trainer)
4) Quality Control
QA/QC Knowledge:1)Testing of concrete temperature, slump test.
2)Initial and final setting time of concrete.
3)Fineness test of cement, sand and aggregate
4)Compaction test of soil (By sand replacement method)
5)Checking of pour as per specification before concreting.
6)Testing of specific gravity of cement.
7)Checking of construction material as per specification.
8) Checking of survey grid line with surveyor
9) Preparation of post concrete report
10)Compression test of concrete cub
11) DPT (Di penetration test)
12)Hydro testing of water reservoir
Work Experience: 4) ‘LARSEN &TOUBRO ELECTROMECH LLC’ LLC
Working as a site Engineer (Civil engineer)-with all individual execution, checking with clients, planning and all necessary arrangement of Tank Foundations and other related structure.
1)Completed work of foundation of tanks of dia 52 meter with approved material, with compaction of each 300mm layer
2)Providing sleepers and pipe support for laying of pipeline
3)Providing fire fighting supports for laying of fire fight pipeline
4)Construction of bund wall of width 7.2mtr around the tank and fire wall in between tanks.
5) Providing cop(cross over platform) pedestal for crossing of pipeline and firewall
6)Construction of ‘V’ drain (with PCC), rectangular drain (with RCC), sand trap, leak-proof area, leak-detection sump, Gravelling, asphalting for slope of tank and tank pad area etc for the tanks.
Note:-The all above work completed with respect to safety permit near live oil and gas pipeline and fuel tanks.
Work Experience: 5) ‘GAMMON - AL-MATAR JV, TRADING & CONTRACTING LLC’
Working as a Site Engineer (Civil engineer) -For Reservoir & Forward Pumping Station Works in one of the leading Construction Company in civil & Pipe line Projects,
1)Working as a Civil Engineer – Completed (Independent Water & Power Project) Reservoir of 1500 cum. Of size 27.95X 13.95m X 4m height, & Connected Forwarding Pumping Station with all RCC & finishing activities.
2)Reservoir Hydro testing.
3)Checking and providing reinforcement as well as formwork for the respective works in accordance with drawings.
4)Supervising and maintaining records for all activates related to concreting, Block works, Plastering, painting etc.
5)Estimating and working out quantities.
6)Preparing weekly /monthly program for execution of works.
7)Execution of cavity blocks works, Epoxy flooring, hardener flooring, false flooring.
8)All block work required for pump house.
Work Experience: 6) ‘GAMMON INDIA LTD’—Completed work of Reactor Auxiliary Building, Turbine building, Fuel tanks foundation.
Primary duties:-
1) Preparing bar bending schedule, client joint measurement
Maintaining ISO records.
2) Executions of Epoxy & Cement Grouting. Sand & Grit Blasting.
3)Checking Reinforcement in accordance with the drawing & confirm
that the reinforcement meets the specification requirement before Permitting to take up shuttering work.
4) Temperature controlled concrete. Finishing.
5)Self compaction & Heavy concreting {H-35}
6) Execution of Bar-Tec in Reinforcement work. & Green cutting in Concrete surface.
7) Execution of U-3 & F-3 finishing inconcrete surface.
8)Execution of END-BEARING piles
9)Embedded parts installation and checking to the tolerance shown on drawing
10)Checking Formwork in according with the shuttering scheme & specification requirement L&T(DOKA shutter)
11)Epoxy painting involved checking surface preparation, paint used. Humidity, checking the
D.F.T aftereach coats painted
12) Execution of Active type rock anchors.
13) Surveying.
Personal skill:-Comprehensiveproblem solving ability. Excellent verbal written communication skill,ability to deal with people diplomatically, willingness to learn team facilitator.
1) Dedication determination.
2) Accept responsibility challenging tasks.
3) Take initiatives and working under pressure
4) Willingness to travel & relocate.
5) Highly adaptable to changes.
Personal Details –
Name : Kiran K Undekar
Date of Birth : 4th January 1980
Education : 1) PUC 2ND Year science
2)Diploma in civil Engineering in Govt Polytechnic
Karwar Karnataka
Permanent Address : KIRAN K UNDEKAR
AT-DHOL, POST- HALGA
TALUKA-KARWAR-581328
STATE-KARNATAKA.
INDIA
E-mail address : kiranundekar@gmail.com
kiranundekar@yahoo.com
Passport No : F6458987
Martial Status : Married
Nationality : Indian
Language Known : Hindi, Kannada, English, Konkani, Arabic
Hobbies : Traveling, Playing cricket
(KiranUndekar)