Planning Engineer , ATE (AL-Sayed Alawi Asaad Tunsi Est.) , Construction of Additional 36,000 WCs at Mina, Arafat and Muzdalifa for Hajj Pilgrims. Project to construct in 3 phases (i.e 1433H (2011-2012), 1434H (2012-2013), 1435 (2013-2014).
START Date:
December, 2011 ATE (AL-Sayed Alawi Asaad Tunsi Est.)
Planning Engineer since December’11
KEY RESULT AREAS;
Client: KSA Ministry of Municipal and Rural Affairs Central Dept for the Development Projects
Consultant: Werner Voss & Partner Architects and Engineers
Project: Construction of Additional 36,000 WCs at Mina, Arafat and Muzdalifa for Hajj Pilgrims.
Project to construct in 3 phases (i.e 1433H (2011-2012), 1434H (2012-2013), 1435 (2013-2014).
Project Cost: 582Million SR
Planning & Scheduling
- Preparation of L1,L2 and L3 schedule on Primavera.
- Preparing Master Schedule for the project on Microsoft Projects.
- Analyze and compare the report Planned Vs Actual.
- To monitor the construction project by using the physical %age in Primavera.
- Prepared the list of achieved and targeted milestone list on monthly basis.
- To prepare the list of critical activity of the month.
- Preparation of Project master & detailed Schedule on the basis of SOW documents with the coordination of Consultant and Ministry.
- Preparing Drawing Schedule for the Projects.
- Integrate the schedules (Master schedule, Drawing Schedule and Procurement Schedule).
- Preparing resource loaded schedule in compliance with WBS schedule using “Primavera”.
- Preparing WBS (Work Break Down Structure) and Work Package
- Project Monitoring, Collating and analysing data and preparation of Weekly, Fortnightly and Monthly Reports, Progress S-Curves, Project related presentations and material management.
- Critical Path Analysis (CPA), Total Float Analysis, Variance Trend Analysis and recommendations for recovery.
- Preparation of catch up plans and recovery schedule
- Estimation and forecasting of man power requirement construction scheduling.
- Review, comments and recommendations on contractor’s schedule.
- Interfacing with various disciplines to build up activities sequence and milestones. Equipment, manpower and material loading as per requirement.
- Preparing short term look-ahead reports & Histogram report.
- Scheduling, Planning, Monitoring & Controlling of Construction Activities.
- Scheduling and planning for project, and root cause analysis including budgeting and cost control activities.
- Preparing critical procurement schedules in conjunction with construction programs
- Preparing weekly progress report for client.
- Supervising the progress of the project according to the plan & schedule.
- Estimation and forecasting of man power requirement construction scheduling.
- Weekly planning for Engineering, Construction and Procurement department).
- Preparing 2/3 - week look ahead program
- Preparing of QHSE plan for the project
- Managing Stakeholders (internal and external both).
Supervision & Execution
- Monitoring overall project.
- Monitoring the progress of structure work at construction site.
- Ensuring work is executing as per approved drawings.
- Coordinate with consultant and sub-contractor.
- Monitoring the progress of work at construction site.
- Verifying the Re-bar of RCC STRUCTURE at the site
Project Management
- Preparation of Gantt chart, Resource chart, Cash flow, S-curve Analysis and Earned Value Management for project on Primavera.
- Conducting daily, weekly & monthly project review meetings for evaluating project progress.
- Preparing Project’s Monthly Development and weekly development Report
- Preparing agendas & organizing meetings at site & preparing minutes of Site Progress Meetings & Design Team Meetings.
- Creating formats/templates for daily, weekly/monthly progress monitoring.
- Baseline Tracking of Master Schedule.