civil supervisor, Mc Connell Dowell Constructors - South East Asia/Bechtel, PTT chem pre shut down/Siam poly ethylene RayongThailand
Mr.LAKORN SAPANGNGERN
136/3 Srichang Island Chonburi Thailand20120
phone no.+9710563887184 E-mail :lakorn_7988@hotmail.com
CAREER OBJECTIVE
To join with a global company that provides me with opportunities to utilize my experience, knowledge and skills.
PERSONAL INFORMATION
Date of Birth :1st June 1967 Place of Birth : Udornthani
Age :45 Blood Group : B+
Sex : Male Marital Status : Married
Weight :65 kg. Heights : 161 cm.
Race : Thai Nationality : Thai
Religion : Buddhism Military Status : Exempted
SUMMARY OF EDUCATION
Diproma in construction Udornthani technical
Secondary school at phenpittayakom Udornthani
Language Thai,English
TRAINING COURSE
Feb,2008 Bechtel International Inc.chonburi,Thailand.
Safety training for supervisor
PROFESSIONAL EXPERIENCE
Jan 2013 –present time ED Zublin AG Abu dhabi UAE
Strategic tunnel enhancement programme project.
Shaft Supervisor
Working in shaft section.Excavation big manhole for pipe jacking (TBM) shaft diameter between 3m.-12m.and depth between 10m.-40m.both type of secant piling and caison.supervision with heavy equipmment, excavator,dump truck,crane,telescopic,clampshel
Operate and controling shotcrete machine.reinnforce steel and
Shotcrete work in the shaft.
Apr 2009 –Dec 2012 Tiamtan,co.ltd.
Mabtaput Rayong Thailand
Supervisor
Managment all works on construction site, controling and managing all heavyEquipment excavator,jcb,roller,dump truck,
Foundation and structural work , Steel Structure work,
Trench , ,Duct Bank, V-Ditch , bridge,canal,pipe rack
Concrete road , Paving , Underground Pipe, asphaltic.
Jul 2008- Feb2009 Bilfinger Berger Qatar W.L.L.
Barwa city phase 1Doha Qatar.
Supervisor Infrastructure section
Concrete foundation underground piping excavation,backfilling for all structure building earth work movement concrete road and site preparation.
Nov 2006-May 2008 Bechtel International ,inc.
TPX Revamp Project , Sriracha ChonburiThailand
Supervisor
Concrete rebar formwork for mat foundation and building
precast installation,columns,beams,earth work movement
,excavation,backfilling for structural,building and road.
Mar 2006 –Oct 2006 Mc Connell Dowell (Thailand) Ltd.
PTT chem. Furnace and pre shut down
.Mabtaput Rayong Thailand
Civil supervisor
Underground piping in live plant sheetpiling,excavation
And Backfilling ,concrete structure,building, paving
. concrete road earth work movement.and steel structural.
Feb 2005- Mar 2006 Nacap Asia Pacific (Thailand) Co;ltd.
Third transmission pipeline project Rayong Thailand
Supervisor
All civil works ,concrete foundation,building,road,paving.
materials take off and orders, controlling sub contractors.
Concrete structure,excavation and backfilling
Supervise all heavy equipment and earth work movement.
Jul 1999- Jun2004 Pro Master Craft International ltd.
MRTA ProjectBangkokThailand
Supervisor
Incharge of source and supply manpower,housing and site safety training,full time supervision on site over650 site base personal.
May 1997-Jan 1999 Mc Connell Dowell (Thailand) ltd.
Siam poly ethylene Project , Maptaput Rayong Thailand
Supervisor
Foundation concrete,earth work,sheet piling, block work
Foundation Tank , Pipe Rack , Steel Structure ,
Trench ,Instrument Trench ,Duck Bank, V-Ditch , Bund
Wall , Paving , Underground Pipe, Site Slope
.
Feb 1996 – Apr 1997 Mc Connell Dowell (Thailand).Ltd
Thai Fertilizer Project Ayutthaya Thailand
Civil General Foreman
Foundation, Footing & Socket Pipe Rack. Column & Beam,
Excavation Underground Pipping structure and building
Backflling and earth work movement.
Apr 1994 –Jan 1996 Mc Connell Dowell (Thailand) ltd.
Sichangthong Marine and Tank farm Project ChonburiThailand
Foreman
In charge of blasting hard rock, concrete foundation,block works , building and concrete raod,concrete foundation,precast columns,beams and structural steel
- Company:
- Industry:
- Job Role:
- Project:
- Region:
- Skills & Expertise: