Core senior Planner, undefined, & Oil & Gas Projects 2) Buildings 3) Infrastructure
SUMMARY:
Has participated in the completion and profitable turnover of projects both large and medium scale in various locations of Saudi Arabia, Libya, Singapore, Philippines, and now at UAE. The projects I have involved with encompass site developments, high rise buildings, roads/ highways, mechanical infrastructure, airbase facilities, major pumping stations for crude oil export, housing, reclamation / landfill, precast buildings, and medium size hospital.. All duties were executed at the front-line project sites in the function of planning (17 yrs), and project engineering (3-1/2 yrs), quantity surveyor & QA (2 yrs) for a summary of 22 years.
Employment and Experience
Al Geemi & Partners Cont. Co. (UAE) Planning Engineer
February 2013 – To present
Head Office, Abu Dhabi, UAE
Duties and Responsibilities
Prepare tender programs and planning for various clients ie; DOT, ADAC, ADCO, Musanada, Abu Dhabi Municipal Affairs, Al Ain Municipality, GASCO, Ports Authority, SCADIA, LIWA.
March 2011 – February 2013
Project 232 : Al Ain Various Roads and Utilities
Client : Al Ain Municipality, UAE
Value : AED 84 – M
Duties and Responsibilities
Designated Planning Engineer (R/E and AAM approved) Produced baseline program in collaboration with R/E (Diwi Consult) and AAM Planning department. Participates in progress meetings and Data Show presentation of current project undertakings. Participate in in-house strategic construction approach how to beat tight time frames to execute subsurface works adjacent existing institution e.g. school, and existing active main roads.
Sept 2008 – March 2011
Project 220 : Shams Abu Dhabi Al Reem Island
Client : Sorouh Real Estate, Abu Dhabi, UAE
Value : AED 451 – M
Duties and Responsibilities
Designated Planner (PMC accepted), able to attain code-B approval of logic baseline program. Co-participated with other planner in assigning resource loading as per 2nd phase of planning provisions.
· Perform tender planning services intended for head office submissions ie; ADNOC Old housing rehab at Ruwais, Aldar, Esnaad, Abu Dhabi government projects, Musanada, and Masdar.
· Short Interim planning assignment to Ruwais project Nov-2008 to Jan-2009.
United Maintenance and Contracting Co. (KSA) Planning Controller
Sep 2004 – Sep 2008 · Project : Ar Rayn / Muzahimiyah Hiway
Client : Ministry of Communications, KSA
Value : SAR 75 – M
· Project: AL Kharj Airbase Runway & Riyadh Airbase Expansion
Client : Ministry of Defense and Aviation, KSA
Value : SAR 72 – M
· Project: West Riyadh, phase 1 & 2
Client : Balidiyah (Riyadh Municipality), KSA Value : SAR 68 – M
· Project: Varous roads, maintenance Contracts, & Riyadh city
development projects.
Client : Various private establishments & Riyadh Dev. Authority
Value : SAR 120 – M
Duties and Responsibilities
· Directly reports to deputy general manager
· Perform project control overview plans as pre-requisite for producing micro schedules and weekly schedules as well as fast track work program.
· Prepare logistical estimation for front-end forecast expenses related to plans.
· Physical assessment of gathered site and plant data and prepare summary of each project progress on a daily basis. Supervise calculations of physical progress, and relates to construction schedules and budget program.
· Prepare a detailed manpower loading program and equipment allocation schedule as called for in the master program
· Joins progress meeting with frontline staff for assessment/evaluation of equipment and material usage against Pay-item quantity progress.
· Prepare monthly Turn-around Revenue summary of executed works illustrated with graphs.
Samama Precast and Construction Company (KSA) Planning Engineer
Aug 2000 – Sep 2004:
· Project : Medical Services Directorate Building Complex
Client : Ministry of Defense & Aviation, KSA
Value : SAR 125 – M
· Project: Southern Schools Contract
Client : Ministry of Education, KSA
Value : SAR 78 – M
· Project: Bank building branches
Client : Al-Bank Al-Saudi Al-Fransi, KSA
Value : SAR 38 – M
Duties and Responsibilities
· Perform master schedule and detailed execution program for building constructions incorporating various disciplines : structural erections, civil, electro-mechanical, HVAC, architectural, and landscape. Software used, Primavera v-3 and customized Excel charts.
· Prepare construction diagram to generate men and machine usage through the entire duration of the projects.
· Perform quantity take-off and estimating for : precast components and mensurations, prepare production and delivery schedule of precast members.
· Overall coordinator for the phasing of work packages involving subcontract trades for: builders work, electrical, mechanical (water system, fire protection, HVAC, sewerage), external works.
· Attend weekly progress and planning meeting along with the General manager to pinpoint some schedule priorities specific for electro-mechanical concerns and architectural finishes related to Handing-Over phase schedules.
FGCC / J.Pajara Construction Joint.Venture Project Engineer
Jan 1999 – Aug 2000:
· Project: La Union Provincial Hospital, Philippines
Client : Department of Health, Philippines
Value : Euro 8 – M ( European Union grant project)
Duties and Responsibilities
· Supervise staffs for trade supervisors in structural steel erection, architectural finishings, civil works, builder’s works, land development, landscaping, and sorrounding roadworks.
· Assist the Project Manager in coordinating with the Euro project consultant in constructing the hospital buildings and facilities comprising 9-isolated and sprawled micro-buildings interconnected with covered pathways. Perform some architectural design features to modify original euro designs to adapt with the local (provincial) environmental requirements.
· Supervise a team of civil and architectural Cad operators to produce shop drawings, evaluate the drawings and submit all docs via digital transmissions to Trachtebel Consulting based at Brussels Belgium.
· Supervised setting-up a “mock-up” partial completed building (show-case) furnished internally and externally top-down for review and comment.
Hyundai Engineering & Construction Pte Ltd. Planning Engineer
March 1997 – Aug 1998
· Project : Glendale Condominiums, Singapore
Client : Glendale Estate development, Singapore
Value : SGD 132 – M
Duties and Responsibilities
· Post award planning and control from groundbreaking stage to completion of 11 cluster of 12-storey buildings. Work packages include: basement carpark, reinforce-concrete structurals, builders/masonry work.
· Prepare Master programme required to complete the condominium project encompassing all the disciplines eg; structural shell (framework) construction from basement parking areas to superstructures (flexural members), architectural features and finishes, electrical fittings and mechanical facilities (sub-contracted), external works inclusive of sewerage systems, and landscaping.
· Coordinate with the subcontractors and issuing weekly target schedules of specific trades and particular areas of priority.
TOA Corporation Project Engineer cum Quantity Surveyor
Sept 1995 – March 1997
· Project : Reclamation / Sanitary Landfill Project Pulau Semakau, Singapore
Client : National Environment Agency (NEA), Singapore
Value : $ 400 – M
Duties and Responsibilities
· Reporting to the Commercial Manager.
· Estimating, progress reporting, and reconciling of progress data with the Client project quantity surveyor’s team.
· Review and charting of divers data for actual underwater level measurement of installed rock armors along shorewall.
LSK-O’Donnel Griffins-Kentz Joint Venture Planning Engineer (for Kentz)
August 1993 – Sept 1994
· Project : Suntec City, Singapore: convention and exhibition halls, 4-tower office buildings 45 storey level, an 18 storey building and 4 storey podium.
Client : Suntec City Development Pte Ltd, Singapore
Value : US$ 1 – Billion
Duties and Responsibilities
· Prepare phase-schedules for airconditioning systems and mechanical ventilation work packages: central mechanical room, ducting works and air-testing, chilled water piping system, air-handling units, grilles/ diffusers/ registers.
· Prepare fabrication measurement tables for grilles / diffusers/registers for ordering and subcontractor / supplier production reference.
Mannesmann Anlagenbau Pte Ltd. (KSA) Planning Engineer
Feb 1992 – April 1993
· Project : Increase Yanbu Crude Export Capacity Project (comprise 11- super pumping stations across East-West pipeline)
Client : Saudi Aramco, KSA
Value : US$ 2+ Billion
Duties and Responsibilities
· Coordinator and Scheduler for the construction of Oil Pumping station works systems: Super Pump (Combustion Gas Turbine by Rolls-Royce), Oil Heater package (by Broach), NGL facility (natural gas line), Hot Tapping works (tapping of new by-pass pipelines to existing live-pipelines), Electrical and air-conditioning works (by ISCOSA), power control building field control rooms (for instrumentations), SCADA (station automation system), Power sub-station, UPS (un-interrupted power systems.).
· Coordinate and synchronize all details of schedules with AG&P subcontractor for Pipeline works.
· Prepare a monthly billing progress and supported with technical documents affirming Contractor’s compliance eg; test certificates, Inspector’s acceptance/ approval.
Dong Ah Consortium, (Libya) Q/A Supervisor
September 1990 – Oct 1991
· Project : Great Man-Made River Project, Libya
Client : GMRA, Libya
Value : (undisclosed)
Duties and Responsibilities
· Checking of quality requirements for the Final-Finishing works of 3-meter diameter x 7-meter long concrete coated steel pipe for water. Checking list includes: steel dents tolerance, honeycomb patching inside pipe, spigot roundness tolerance, external scratches fixing, and sandblasting finish
· Supervised QC assistants to “preliminary quality” checking of all finished pipes prior to next day actual checking and acceptance. By Brown & Root Consultant.
· Assist the Quality Manager during regular- daily inspections and acceptance of serialized pipes.
CEPALCO (Philippines) Superintendent
May 1988 – June 1990
· Project : Clark Air Base various facilIty projects, Philippines
Client : U.S. Pacific Command
Value : $ 4 - M
Duties and Responsibilities
· Supervised setting up of “Portomod” project comprising warehouse built with structural steel frames and equipped with auto fire alarm systems, sprinklers, with remotely connected sensors to the fire station.
· Supervised setting up of “Engine Dispatch Facility” project comprising of reinforced concrete foundations and masonry walls ; erection of imported prefabricated roofing systems; outfitting with explosion proof external electrical and mechanical fixings as specified; setting up of centralised airconditioning systems and compressed air systems. Finishing of external building surfaces and outdoor landscaping.
· Supervised construction of “Stradley Igloo” ammunition dump.
DeMauro-Shuwayer Co. (KSA) Scheduler
July 1981 – Aug 1986
· Project : Site Development Projects, Jubail Industrial City
Client : Royal Commission, KSA
Value : SAR 116-M , SAR 97-M, SAR 34-M, SAR 32-M,
SAR 69-M
Duties and Responsibilities
· Prepare programs: tender, executive and operational purpose for the following Projects:
1. Haii Al Deffi Site Development Contract 702-CO3
2. Haii Al Fanateer Site Development Contract 709-C02
3. Wavewall Protection, Jubail Ports Contract
4. Sewage Treatment Plant, Rahima
5. Aramco Dhahran Housing
Al Gosaibi – Bison Ltd (KSA) Planning Engineer
June 1980 – June 1981
· Project : Housing Project, Jubail Industrial City, KSA
Client :Royal Commission, KSA
Duties and Responsibilities
· Assist the planning manager in progress monitor of precast element erections, plumbing, electricals, internal & external finishes for detached and attached housing structures (118 units) and 3-level apartment types.(10 units).
________________________________________________________________
Education
October 1978: ML Quezon University, Philippines
BS degree, Civil Engineering
________________________________________________________________
Career Level
Career Level: Senior supervisor
________________________________________________________________
Skills
Skill Skill Level Experience Last Used
Primavera p3, p6 software good 5 years current
MS Project good 3 years recent
Excel database handling, customized good 10 years+ current
Chart bars, s-curve, and marking up
Quantity surveying, estimating, good 8 years current
Cashflow generating for budgets
Civil Construction site supervision, good 10 years+ year 2000
superintendence
________________________________________________________________
Languages