Planner, ESP Asia Pvt.Ltd,Gaytech Engg.Pvt.Ltd.,CODE Engineers Pvt.Ltd, Natural gas compressor Station,Petroleum refinery construction and shut down

START Date: 
May, 2006

Professional Experience(Current)     -  Mar‘2013 – May’2013

Position:                                               -  Planning Engineer

Company                                            - ESP Asia(P) Ltd.

Project                                                - Shut down TA-2013,Sohar Refinery, OMAN

Job Responsibilities:

¨       Updating Project Progress in P6, and preparing look-ahead plans.

¨       Updating the Turnaround report and report progress S-Curves.

¨       Preparation of 24 hrs LookAhead

¨       Attending the Coordination Meetings with Clients and internal meetings.

¨       Awaring the management of the Critical items in the project.

¨       Preparing the DPR and sending the report to the Client.

¨       Ensuring the Supervisors are adopting to the shutdown plans.

¨       Ensuring all safety aspects is been adopted at site.

¨       Briefing the supervisors about the daily plan and ensuring that the plan is effectively managed at site.

 

Professional Experience                     -  Apr‘2012 – Feb’2013

Position:                                               -  Planning Engineer

Company                                            - GayTech Engineering Pvt.Ltd.

Project                                                - Diesel Hydrotreator Project,HPCL,Visakha Refinery,Visakhapatnam.                                                           (Fabrication and erection of A/G Piping,Structures & Shutdown Piping)

Job Responsibilities:

¨       Preparing actual bill of quantities from studying project’s drawings like plan, isometric, key plan.

¨       Planning time & resources, scheduling the activities, updating actual progress.

¨       Preparing daily progress report, weekly progress report, monthly billing, hydro testing diagrams, joints mapping.

¨       Analyzing  construction factors, such as labor, materials, special machinery requirements and site location.

¨       Performing site visits and gathering necessary information such as site accessibility, availability of utility services and reporting to the concerned person.

¨       Preparation of overall project quantities.

¨       Attending weekly/Monthly progress review meeting.

¨       Monitoring the daily work activities of Sub Contractor and updating Sub Contractor Progress Reports.

¨       Preparation of “As-built” documents such as Isometric drawings, Pipe support drawings.

¨       Preparation of field piping system test packages ,including system limit on P&ID and piping Isometrics.

¨       Ensure that all punch list items are resolved; client handover is satisfactorily concluded and that there is no prolongation of project.

Professional Experience                     -  Jun ‘2007 – Mar’2012

Position:                                               -  Planning Engineer

Company                                            - CODE Engineers Pvt.Ltd.Mumbai. 

Project 1: EAST WEST GAS PIPELINE-Natural Gas Compressor Station-10A&10B Gujarat for Reliance(RGTIL)-Fabrication and erection of pipelines,Unit piping ,Structures and Equipment erection

Job Responsibilities:

Project 1:

¨       Preparing bill of quantities from studying project’s drawings like plan, isometric, key plan, spool erection drawings, P&ID, flow diagram drawings and designs.

¨       Studying scope of works, Project specifications and Material specifications.

¨       Preparing daily progress report, weekly progress report, monthly billing, hydro testing diagrams, Pipe spool erection drawings, joints mapping, material requisition.

¨       Analyzing  construction factors, such as labor, materials, special machinery requirements and site location.

¨       Planning time & resources, scheduling the activities, updating actual progress, discussing project status; reviewing during the course of project review meetings; coordinating with client and head office.

¨       Monitoring the performance of the team to ensure efficiency in process operations & meeting of individual & group targets.

¨       Additional work recording & obtaining client approval for invoicing

¨       Preparation of Material Reconciliation Statement

¨       Preparation of “As-built” documents such as Isometric drawings, Pipe support drawings,Loop test packages

¨       Preparation of field piping system test packages ,including system limit on P&ID and piping Isometrics

¨       Sub-Contractor’s bill checking.

¨       Preparation of overall project quantities,Final bill and associated techno-commercial documents for close-out of project.

 

Project 2: Fabrication Shop,Solapur,Maharashtra,India.-Fabrication of various types of structures,Vessels,Tanks for Sugar plants ,Power  plants(Thermal & Nuclear) etc.

Position  : Planning Engineer

Job Responsibilities:

¨       Studying scope of works, Project specifications and Material specifications for Vessels, Tanks,Structures of Sugar plants,Power Plants etc.

¨        Developing accurate and clear cost estimates based on project data.(Estimate man hours,Tools and Tackles ,Equipments,etc required for completing the project.)

¨       Preparing process plan, raw material cutting diagram etc for each project.

¨       Executing the project as per the specification and QAP.

¨       Carrying stage wise inspection and preparing relevant documents for the project.

¨       Preparing daily progress report, weekly progress report, monthly billing,material requisition.

¨       Monitoring daily progress and reporting the same to Project manager.

¨       Preparing Material  Consumption Statement.

¨       Preparing a cost summary for the entire project, this includes the cost of materials, equipments, labor and any other costs affecting the project.

¨       Monitoring and storing costs through the use of computers to improve the accuracy of future estimation

¨       Sub-Contractor’s bill checking.