Planner, ESP Asia Pvt.Ltd,Gaytech Engg.Pvt.Ltd.,CODE Engineers Pvt.Ltd, Natural gas compressor Station,Petroleum refinery construction and shut down
Professional Experience(Current) - Mar‘2013 – May’2013
Position: - Planning Engineer
Company - ESP Asia(P) Ltd.
Project - Shut down TA-2013,Sohar Refinery, OMAN
Job Responsibilities:
¨ Updating Project Progress in P6, and preparing look-ahead plans.
¨ Updating the Turnaround report and report progress S-Curves.
¨ Preparation of 24 hrs LookAhead
¨ Attending the Coordination Meetings with Clients and internal meetings.
¨ Awaring the management of the Critical items in the project.
¨ Preparing the DPR and sending the report to the Client.
¨ Ensuring the Supervisors are adopting to the shutdown plans.
¨ Ensuring all safety aspects is been adopted at site.
¨ Briefing the supervisors about the daily plan and ensuring that the plan is effectively managed at site.
Professional Experience - Apr‘2012 – Feb’2013
Position: - Planning Engineer
Company - GayTech Engineering Pvt.Ltd.
Project - Diesel Hydrotreator Project,HPCL,Visakha Refinery,Visakhapatnam. (Fabrication and erection of A/G Piping,Structures & Shutdown Piping)
Job Responsibilities:
¨ Preparing actual bill of quantities from studying project’s drawings like plan, isometric, key plan.
¨ Planning time & resources, scheduling the activities, updating actual progress.
¨ Preparing daily progress report, weekly progress report, monthly billing, hydro testing diagrams, joints mapping.
¨ Analyzing construction factors, such as labor, materials, special machinery requirements and site location.
¨ Performing site visits and gathering necessary information such as site accessibility, availability of utility services and reporting to the concerned person.
¨ Preparation of overall project quantities.
¨ Attending weekly/Monthly progress review meeting.
¨ Monitoring the daily work activities of Sub Contractor and updating Sub Contractor Progress Reports.
¨ Preparation of “As-built” documents such as Isometric drawings, Pipe support drawings.
¨ Preparation of field piping system test packages ,including system limit on P&ID and piping Isometrics.
¨ Ensure that all punch list items are resolved; client handover is satisfactorily concluded and that there is no prolongation of project.
Professional Experience - Jun ‘2007 – Mar’2012
Position: - Planning Engineer
Company - CODE Engineers Pvt.Ltd.Mumbai.
Project 1: EAST WEST GAS PIPELINE-Natural Gas Compressor Station-10A&10B Gujarat for Reliance(RGTIL)-Fabrication and erection of pipelines,Unit piping ,Structures and Equipment erection
Job Responsibilities:
Project 1:
¨ Preparing bill of quantities from studying project’s drawings like plan, isometric, key plan, spool erection drawings, P&ID, flow diagram drawings and designs.
¨ Studying scope of works, Project specifications and Material specifications.
¨ Preparing daily progress report, weekly progress report, monthly billing, hydro testing diagrams, Pipe spool erection drawings, joints mapping, material requisition.
¨ Analyzing construction factors, such as labor, materials, special machinery requirements and site location.
¨ Planning time & resources, scheduling the activities, updating actual progress, discussing project status; reviewing during the course of project review meetings; coordinating with client and head office.
¨ Monitoring the performance of the team to ensure efficiency in process operations & meeting of individual & group targets.
¨ Additional work recording & obtaining client approval for invoicing
¨ Preparation of Material Reconciliation Statement
¨ Preparation of “As-built” documents such as Isometric drawings, Pipe support drawings,Loop test packages
¨ Preparation of field piping system test packages ,including system limit on P&ID and piping Isometrics
¨ Sub-Contractor’s bill checking.
¨ Preparation of overall project quantities,Final bill and associated techno-commercial documents for close-out of project.
Project 2: Fabrication Shop,Solapur,Maharashtra,India.-Fabrication of various types of structures,Vessels,Tanks for Sugar plants ,Power plants(Thermal & Nuclear) etc.
Position : Planning Engineer
Job Responsibilities:
¨ Studying scope of works, Project specifications and Material specifications for Vessels, Tanks,Structures of Sugar plants,Power Plants etc.
¨ Developing accurate and clear cost estimates based on project data.(Estimate man hours,Tools and Tackles ,Equipments,etc required for completing the project.)
¨ Preparing process plan, raw material cutting diagram etc for each project.
¨ Executing the project as per the specification and QAP.
¨ Carrying stage wise inspection and preparing relevant documents for the project.
¨ Preparing daily progress report, weekly progress report, monthly billing,material requisition.
¨ Monitoring daily progress and reporting the same to Project manager.
¨ Preparing Material Consumption Statement.
¨ Preparing a cost summary for the entire project, this includes the cost of materials, equipments, labor and any other costs affecting the project.
¨ Monitoring and storing costs through the use of computers to improve the accuracy of future estimation
¨ Sub-Contractor’s bill checking.