Planning Manager, MITSUBISHI HEAVY INDUSTRIES PLANT CONSTRUCTION COMPANY LIMITED, Ar Razi Saudi Methonal Shut down project

START Date: 
October, 2012
END Date: 
March, 2013

 EXPERIENCE

 

 

Apr13 – Present      SBA TECH Tamilnadu

                                   Manager (Construction /Planning)

 

Organize Industrial, Commercial buildings ,Lead construction crew of 25 .Analyze blue print, hire subcontractors and schedule project milestones, develop bids, negotiable contracts, purchase materials, Optimize site development processes by providing continuous planning. Inspect construction to guarantee that workmanship conforms to plan, specification and contract requirement, Oversee the testing of plumbing, electrical and mechanical installation. Direct the checkout of utilities, operational systems and equipment for readiness.  

 

                                   

Oct 12 – Mar 13       MITSUBISHI HEAVY INDUSTRIES PLANT CONSTRUCTION COMPANY      LIMITED

A Japanese multinational engineering, electrical and electronics company headquartered in TokyoJapan.

                                 Manager – Project Control/ Construction

Accountable for planning, preparation and coordination activities for execution of shutdown projects. Coordinate and schedule all pre and post shutdown activities including tender documents, preparation of detailed network plan, monthly progressive reports, resource allocation & leveling, progress analysis and S-curve planning, using Primavera P6v7 to achieve project milestones as per given timelines.

·   Executed a turnaround project for Saudi Methonal company, AR-RAZI PLANT-V to be shutdown in Oct 2013 involving heavy lifting equipment i.e. Auto-thermal reactor and replacement of saturator

·   Compiled tender documents to commence project scheduling activities through cost effective strategies, ensuring availability of long lead items

·   Analyzed shutdown critical path activities and ensured optimized man-hour schedule through appropriate resource allocation and planning

·   Identified critical and sub-critical issues by using Primavera P6v7 to prevent pre-shutdown/shutdown schedule delays

·   Prepared monthly progress reports (MPR) to highlight real-time progress, performance indices and computed turnaround time for completion

·   Liaisoned with senior management teams to strategize and implement corrective actions for seamless execution of project

·   Documented target milestone schedules, critical item lists and equipment loading charts

 

May 05 – Jul 12       NADIA HOLDINGS LIMITED, Tamilnadu

                                 (Unit of Al-Shallal International Group, Kuwait)

Its services include Oil & Gas installations, petrochemical, telecommunication turnkey solutions, electro mechanical constructions, fiber optical installations, logistic support and heavy equipment lease. 

                                 Project/ Planning Manager

Prepared and represented technical proposal for 6 projects comprising industrial buildings, electrical substation, sewerage treatment plant and all external works by designing schedules for man-power loading and equipment chart, for submission of tender.

·   Involved in end-to-end project management and preparation of recovery schedule for site office, achieving project milestones 2 weeks ahead of given timeline

·   Evaluated & developed >9 contractors including 5 key vendors to ensure seamless availability of man-hour and equipment allocation of critical items at benchmark costs

·   Developed recovery schedules and contingency plans in order to meet changed objectives as necessary

·   Prepared quality plan / schedule in line with the project scheduling principles and processes

·   Highlighted key milestones & critical path issues to senior management groups, providing assessment along with solutions to mitigate the risks involved

·   Travelled internationally including Georgia and Thailand on a sponsored business trip for site study in 2006

 

Oct 02 – Apr 05         

Established in 1979 the company is a service provider in the downstream sector of the oil and gas industry.

                                 Planning Engineer

Accountable for performing and managing base schedule for technical proposal bid for oil & gas, storage tanks, power plant, EPCC of mechanical & piping works, heavy equipment lifting sequence and chemical plant shutdown projects.

Scope of work: Preparing base schedule of mechanical works, piping works, electrical works, instrumentation works, painting works in (ITB) Tender Document for Submission of bid.

·   Interfaced with cross-function team of 10 providing support to business & planning division in executing operational and financial analysis & reports

·   Prepared progress analysis, recovery schedule, 2 weeks look ahead & progress updating report for Army camp housing project involving 5 nine storey building blocks & 16 bungalows

·   Provided base scheduling for technical proposal bid of in 3 critical projects, involving Oil & Gas Storage Tanks, Power Plants and EPCC of all Mechanical and piping works:

o   Petrochemical Projects (Thar Jath Development Project, All Package Accommodation Complex, Central Processing Facilities (CPF), Field Surface Facility (FPF) Export Pipe Line, Central Power Plant, Runkona Bridge for WPNOC and GNPOC Petrochemical Projects

o   Storage Tank for Brunei shell ,Fertilizer Plant, Chemical Plant Shutdown job(Petronas Methanol Plant(Labuan)), Tank Facilities (Client –STP Maldives)           

                                 PREVIOUS EXPERIENCE                            

 

Feb 97 – Sep 02    NADIA HOLDINGS LIMITED, Tamilnadu

                                 Senior Project/ Planning Engineer

 

Dec 94 – Dec 96      HOUSING AND DEVELOPMENT BOARD, Singapore

                                 Technical Officer

 

May 91 – Oct 94      MUNICIPAL CORPORATION, (Government of Tamilnadu), Tamilnadu

                                 Site Engineer

                                 EDUCATION

 

1991                         Madurai Kamaraj University, Tamilnadu 

                                 Bachelor of Engineering - Civil

         CERTIFICATION

·   Primavera P6v8.2(CAAD Centre India)2014

·    AutoCAD, Autolisp-COA, 1994

·   Survey GPS at Coimbatore Institute of Technology, Coimbatore

·   Diploma in e-commerce CSC Computers - India (2001)

 

         PERSONAL INFORMATION

         Date of Birth: May 9th, 1970