Project Engineer / Senior Engineer / Site Agent, suzlon energy ltd, & Power infrastructure works

START Date: 
July, 2007

Handled Survey and Construction of 0.69/33KV New Switch Yards,33KV HT Lines, LT Cable Termination and Tower Cable Termination works. As per our company Technical Specifications and Quality Specifications.

  • 71.4 MW  Wind Power Plant constructed at Gandikota in Kadapa District, ( A.P)
  • 88.2 MW  Wind Power Plant constructed at Vajrakarur, ( A.P)
  • Survey & Construction & Commissioning of 690Volts/33KV Switch yards.                                                                                 
  • Preparation of DPR for the  2.1 MW WTG’s power plant at  Vajrakarur, ( A.P)
  • Handover &Takeover activities with documentation
  • Proper work planning on location activities and communicate with higher & lower levels
  • Work knowledge on Switchyard (HT & LT)  690Volts/33KV
  • Planning, scheduling and erection of wind turbine generators as per business plan.
  • Work closely with contractors and lead a team.
  • Responsible of Inspect all incoming materials and prepare NCR for non conformity materials.
  • Material handling, equipment planning as per site requirement.
  • Coordinate with Engineering team, TSG.
  • Participate with internal and external audit.
  • Coordinating with other departments for surveying the land, <?xml:namespace prefix = st1 />LAF Clearance, Pre concrete level checking, cable laying, material flowing, etc.
  • Evaluating health & safety issues and formulating practical solutions and ensuring the highest level of safety standards is applied by all Consultants.
  • Preparing that all required inspection and testing records are progressively and systematically generated and compiled for hand-over to Clients as per ISO Standard.

Worked fully in accordance with the project quality standards specified in the Contract and that the procedures laid down in the Project Quality Procedure and work instruction to achieve these standards are followed