CADD Coordinator, Esawin Resources Sdn Bhd., Rural Electrification Scheme
WORKING EXPERIENCE:
AUG. 2009 –PRESENT : PART-TIME AS CADD DETAILER CUM PROJECT CO’ORDINATOR WITH SYARIKAT TENAGA BUMI BERSEPADU
NOV. 2004 –JULY 2009 : R.S. ENGINEERING CONTRACTOR AS PROJECT CO’ORDINATOR
AUG. 2002 –NOV.2004 : APPOINTED BY NAKAZAWA SAN AS CAD HEAD SECTION ON JULY 2003 TO HANDLE CAD SECTION, STAFFS AND WORKS PROGRESS. EMPLOYED BY MERINO O.D.D AS CAD OPERATOR .
RESPONSIBLE : ENGAGED IN PHASE I UNIMAS PROJECT, KOTA SAMARAHAN. PREPARED M&E DRAWING FOR DESIGN & CONTRUCTION.
MAR. 2002 – AUG.2002 : EMPLOYED AS SAFETY OFFICER FOR 14 TOOLS HOOK UP PROJECT.
RESPONSIBLE : IMPLEMENTED SAFETY RULES AND REGULATIONS, SITE INSPECTIONFOR SAFETY AWARENESS ON WORKERS, SUBCONS. PREPARED WEEKLY TOOLBOX TALK, REPORTS FOR SUBMISSION TO HQ, KINETICS NORTHWEST, USA.
DEC. 2001 – JAN. 2002 : BASE BUILT AND TOOLS HOOKUP FOR C4F8 AND C2H2F6 PROJECTS 1ST SILICON WAFERFAB, KUCHING.
RESPONSIBLE : SITE CHECKING, UPDATES DRAWING FOR ASBUILT, ISOMETRIC AND PROCESS FLOW DIAGRAM. EMPLOYED AS CAD DETAILER
SEPT. 2001 – OCT. 2001 :EMPLOYED BY KINETICS AUSTRALIA PTY. LTD. BASE IN SINGAPORE FOR SINGAPORE BIOTECH FACILITY PROJECT UNDER THE OWNER SHERING PLOUGH PTE. LTD., SINGAPORE. AS CAD DETAILER.
RESPONSIBLE : PREPARED SYSTEM ISOMETRIC DRAWING FOR CONSTRUCTION.
SITE CHECKING & MEASURING BEFORE CONSTRUCTION BEGIN.
P&ID (PIPING & INSTRUMENTATION DIAGRAM) UPDATED FOR
CONSTRUCTION.
REASON FOR LEAVING: WORK PERMIT NOT APPROVED.
JAN. 2001 – JUN. 2001 : EMPLOYED BY REINHOLD FAETH FOR ADDITIONAL INSTALLATION
12 VMB’s AND TOOLS HOOK UP AT 1ST SILICON WAFERFAB PROJECT.
RESPONSIBLE : SITE CHECKING AND UPDATES DRAWINGS FOR AS-BUILT.
MAY 2000 – SEPT.2001 : EMPLOYED BY REINHOLD FAETH GMbH (M) SDN. BHD.. AS CAD DESIGNER.
ENGAGED IN PREPARING DRAWINGS FOR SPECIALTY GAS,
FOR 1st. SILICON WAFERFAB KUCHING, MALAYSIA, ATTACHED
TO AND WORKING UNDER Mr. NOBERT WAGNER, PROJECT MANAGER
FOR SPECIALTY GASES.
RESPONSIBLE : SPECIALTY GAS LAYOUT DRAWING
P&ID (PIPING & INSTRUMENTATION DIAGRAM)
BULK GAS LAYOUT DRAWING
SITE CHECKING TO VERIFIED PIPING DESIGN
AS-BUILT DRAWINGS
PUNCHLIST
DOCUMENTATION FOR SPECIALTY GAS
DOCUMENTATION FOR BULK GAS
DOCUMENTATION FOR VALVE TAGGING
SEPT. 1998 – MAR.1999 : SECONDED TO INNOJASA ENGINEERING SDN BHD., SABAH. ASSIST AND
RESPONSIBLE : TRAINED STAFF OF INNOJASA ON AutoCAD R.14 FOR RURAL
ELECTRIFICATION PROJECT AND SETTING UP AUTOCAD SECTION
FOR DESIGN DEPARTMENT.
OCTOBER 1994 : EMPLOYED BY SHOREFIELD SDN BHD. AS TECHNICAL ASSISTANT
MAY 2000 : IN CHARGE OF CAD SECTION. JOB MAINLY SUPERVISING MAPPING,
RESPONSIBLE : DIGITISED CADASTERAL MAP, MAP SCANNING AND PRODUCE
ENGINEERING DRAWINGS FOR 11KV OVERHEAD LINE FOR RURAL
ELECTRIFICATION SCHEME (R.E.S) FOR SABAH AND SARAWAK.
APRIL 1990 : EMPLOYED BY SARAWAK ELECTRICITY SUPPLY CORPORATION (SESCO)
OCTOBER 1994 : AS JUNIOR TECHNICAL ASSISTANT (J.T.A) . JOB MAINLY DOING CIVIL
AND DESIGN CONSTRUCTION DRAWING FOR SESCO POWER STATION.
DECEMBER 1988 : PROMOTED TO FULL DRAFTSMAN – DOING INTERIOR DESIGN
APRIL 1990 : DRAFTING AND GRAPHIC DESIGN.
NOVEMBER 1987 : EMPLOYED BY DESIGN EAST ASSOCIATE, DESIGN CONSULTANT.
NOVEMBER 1988 : OFFICE BOY CUM TRAINEE DRAFTSMAN.
- Company:
- Industry:
- Job Role:
- Project:
- Region:
- Skills & Expertise: