CADD Coordinator, Esawin Resources Sdn Bhd., Rural Electrification Scheme

START Date: 
November, 2012

 

WORKING EXPERIENCE:

 

AUG.  2009 –PRESENT : PART-TIME AS CADD DETAILER CUM PROJECT CO’ORDINATOR WITH SYARIKAT TENAGA BUMI BERSEPADU

 

NOV.  2004 –JULY 2009   :    R.S. ENGINEERING CONTRACTOR AS PROJECT CO’ORDINATOR

 

AUG.  2002 –NOV.2004    :   APPOINTED BY NAKAZAWA SAN AS CAD HEAD SECTION ON JULY 2003 TO HANDLE CAD SECTION, STAFFS AND WORKS PROGRESS. EMPLOYED BY MERINO O.D.D AS CAD OPERATOR .

 

RESPONSIBLE                   :  ENGAGED IN PHASE I UNIMAS PROJECT, KOTA SAMARAHAN. PREPARED M&E DRAWING FOR DESIGN & CONTRUCTION.

 

MAR.  2002 – AUG.2002    :   EMPLOYED AS SAFETY OFFICER FOR 14 TOOLS HOOK UP PROJECT.

RESPONSIBLE                   :  IMPLEMENTED SAFETY RULES AND REGULATIONS, SITE INSPECTIONFOR SAFETY AWARENESS ON WORKERS, SUBCONS. PREPARED WEEKLY TOOLBOX TALK, REPORTS FOR SUBMISSION TO HQ, KINETICS NORTHWEST, USA.

 

DEC. 2001 – JAN. 2002     :      BASE BUILT AND TOOLS HOOKUP FOR C4F8 AND C2H2F6 PROJECTS 1ST SILICON WAFERFAB, KUCHING.

RESPONSIBLE                   :     SITE CHECKING, UPDATES DRAWING FOR ASBUILT, ISOMETRIC AND PROCESS FLOW DIAGRAM. EMPLOYED AS CAD DETAILER

 

SEPT. 2001 – OCT. 2001  :EMPLOYED BY KINETICS AUSTRALIA PTY. LTD. BASE IN SINGAPORE FOR SINGAPORE BIOTECH FACILITY PROJECT UNDER THE OWNER SHERING PLOUGH PTE. LTD., SINGAPORE. AS CAD DETAILER.

 

RESPONSIBLE                   :               PREPARED SYSTEM ISOMETRIC DRAWING FOR CONSTRUCTION.

                                                                                SITE CHECKING & MEASURING BEFORE CONSTRUCTION BEGIN.

                                                                                P&ID (PIPING & INSTRUMENTATION DIAGRAM) UPDATED FOR

CONSTRUCTION.

 

REASON FOR LEAVING:                WORK PERMIT NOT APPROVED.

 

JAN. 2001 – JUN. 2001      :               EMPLOYED BY REINHOLD FAETH FOR ADDITIONAL INSTALLATION

12 VMB’s AND TOOLS HOOK UP AT 1ST SILICON WAFERFAB PROJECT.

RESPONSIBLE                   :               SITE CHECKING AND UPDATES DRAWINGS FOR AS-BUILT.

                                                                                                                                                               

MAY 2000 – SEPT.2001   :               EMPLOYED BY REINHOLD FAETH GMbH (M) SDN. BHD.. AS CAD DESIGNER.

                                                                                ENGAGED IN PREPARING DRAWINGS FOR SPECIALTY GAS,

                                                                                FOR 1st. SILICON WAFERFAB KUCHING, MALAYSIA, ATTACHED

TO AND WORKING UNDER Mr. NOBERT WAGNER, PROJECT MANAGER

FOR SPECIALTY GASES.

 

RESPONSIBLE                   :               SPECIALTY GAS LAYOUT DRAWING

                                                                                P&ID (PIPING & INSTRUMENTATION DIAGRAM)

                                                                                BULK GAS LAYOUT DRAWING

                                                                                SITE CHECKING TO VERIFIED  PIPING DESIGN

                                                                                AS-BUILT DRAWINGS

PUNCHLIST

                                                                                DOCUMENTATION FOR SPECIALTY GAS

                                                                                DOCUMENTATION FOR BULK GAS

                                                                                DOCUMENTATION FOR VALVE TAGGING

 

SEPT. 1998 – MAR.1999  :               SECONDED TO INNOJASA ENGINEERING SDN BHD., SABAH. ASSIST AND

RESPONSIBLE                   :               TRAINED STAFF OF INNOJASA ON AutoCAD R.14 FOR RURAL

ELECTRIFICATION PROJECT AND SETTING UP AUTOCAD SECTION

FOR DESIGN DEPARTMENT.

                                                               

OCTOBER 1994                 :               EMPLOYED BY SHOREFIELD SDN BHD. AS TECHNICAL ASSISTANT

MAY 2000                            :               IN CHARGE OF CAD SECTION. JOB MAINLY SUPERVISING MAPPING,

RESPONSIBLE                   :               DIGITISED CADASTERAL MAP, MAP SCANNING AND PRODUCE

ENGINEERING DRAWINGS FOR 11KV OVERHEAD LINE FOR RURAL

ELECTRIFICATION SCHEME (R.E.S) FOR SABAH AND SARAWAK.

 

APRIL 1990                         :               EMPLOYED BY SARAWAK ELECTRICITY SUPPLY CORPORATION (SESCO)

OCTOBER 1994                 :               AS JUNIOR TECHNICAL ASSISTANT (J.T.A) . JOB MAINLY DOING CIVIL

                                                                                AND DESIGN CONSTRUCTION DRAWING FOR SESCO POWER STATION.

 

DECEMBER 1988              :               PROMOTED TO FULL DRAFTSMAN – DOING INTERIOR DESIGN

APRIL 1990                         :               DRAFTING AND GRAPHIC DESIGN.

 

NOVEMBER 1987             :               EMPLOYED BY DESIGN EAST ASSOCIATE, DESIGN CONSULTANT.

NOVEMBER 1988             :               OFFICE BOY CUM TRAINEE DRAFTSMAN.