Construction Project Planner / Senior Planner, May Gurney Rail;, Bridges, OLE & Station
START Date:
August, 2013 May Gurney/Kier July 2013 till date
Senior Project Planner (P6 & MS Project)
• Produced schedule adherence report for Project Manager, trace programme logic and report on slippage and risks issues.
• Analyzed programme impact of change controls and report to Project Manager prior to acceptance.
• Produced summary report periodically (4 & 8 weeks Look-ahead) to the Project Manager.
• Represented the depot at Planning meetings and feedback to the central team where improvements are required.
• Provided updates to the Central team on reports that are being frequently requested at the depot and present a case for inclusion into the Programme and Controls Interface.
• Prepared a work breakdown structure to enhance planning following the requirements of the Guide to Railway Investment Project – G.R.I.P all stages.
• Maintained/Assigned required baseline plans for the project plans against which progress is measured following monitoring, update and changes to the project plans throughout the project lifecycle.
• Highlighted key milestones and critical path issues to members of the project team.
• Carried out Progress tracking with specific reference to engineering activity, sourcing, quality and delivery on a weekly/monthly basis.
• Progressed the project plans to report and compare actual progress against planned progress that will ensure robust tracking of key activities and milestones.
Network RailMarch 2013 – June 2013
Project Planner (P6 & MS Project)
• Worked closely with the PM and Functional Managers in producing an agreed list of activity descriptions, durations and dependencies for Network Rail projects.
• Used the model to forecast dates, resource loading and allocation of resources in line with Resources Manager.
• Produced and agreed project/programme baseline (Clause 14).
• Gathered progress information, and used it to update the programme.
• Produced reports and advising the PM and Functional Managers of any variances in terms of schedule, budget and resources.
• Worked with the Head of Planning in the production of the overall company project plan.
• Complied with the company and contract health, safety, quality and environmental requirements and procedures. Targeting work areas and reviewing progress as agreed.
• Prepared detailed reports on weekly basis for the progress meeting.
• Recommended any remedial works with agreed date when necessary.
• Produced reports on outputs and assisting in re-planning of a project when new requirements, change requests or other exceptional changes occur.
• Incorporated WBS, Activities, Schedule and Resource loading within the plans
• Produced Monthly Project Financial, Project End and Project Estimate Report through Oracle Interface
• Interfaced with the cost function to assure Earned Value Information is accurate and that forecast information is robust and underpinned
• Reported against the schedule to include for physical work completed and forecast of work to complete, including for what-if modelling
• Produced key quantities to underpin schedule performance
• Interfaced with the Commercial team on Cost of Work Done, At Completion Total Cost and Remaining Cost and align in P6 at Period End.
• Updated of Primavera project plans to enable business reporting, including schedule and cost variance analysis and total float reporting
• Liaised with contractors, SPM and PM in actualising and producing of project dashboards
• Supported the project teams with all planning related activities associated with the management of their contracts and reporting
• Identified and maintained programme/project milestone and schedule interface activities
• Performed and/or coordinated, collected, verified and integrated the work scope for all entities into the total project plan
• Reviewed, Actualised and scheduled project activities and cost/resources
• Monitor Project progress and milestones via MS Project/Primavera
Crossrail LtdJune 2011 – March 2013
Project Planner (Primavera P6)
• Developed new and existing project plans including liaising with many internal stakeholders, to incorporate technical knowledge and company process into the planning process
• Liaised with suppliers to monitor progress against plan and interrogation of the contractors plan, and payment request submissions
• Prepared and monitored TBM progress and Ensured suppliers plans meet company requirements/standards according to NEC3 contract
• Forecasted TBM arrival dates and defects survey start date at the beginning of each period
• Contributed to the investment process with preparation of proposal estimates and associated reports
• Ensured project plans and associated reporting is in line with Network company requirements/standards
• Contributed to driving improvements in the planning and wider project management processes within the programme, to enable successful delivery of projects
• Created relations and overlapping activities in Gantt chart.
• Monitored projects on a day to day basis and updating the progress to plan through liaison with the Engineering staff.
• Compiled project programme drawings installation & procurement.
• Identified & captured key deliverable dates start/finish as reflected on the programme.
• Analysed information supplied by suppliers/sub-contractors.
• Accumulated data from all parties and the project team.
• Monitored progress, installation, procurement, and design drawings with agreed time scale.
• Checked on progress and verifying works completed and reviewing any possible delays that is been highlighted to the Sponsor.
• Kept reports up to date, Prepared targets, look ahead, forecast and reporting Key milestones to the Project Team.