Planning Engineer, PT Thiess Contractors Indonesia, Mining infrastructure, crushing %26 conveying system, Construction of Gold Mining Facilities

START Date: 
February, 2008

Thiess Contractors Indonesia (Subsidiary of Leighton Holdings)

SPECIALIST PLANNING/SCHEDULING ENGINEER

February 2013- Present
 

Industry           : Mining & Construction Services
Project             : Mining Infra-structure , Bulk Material Handling, Process Plant, Civil-Construction.

Location          : Jakarta Head Office – Technical Services Department
Specialization : Project Planning & Scheduling
Reporting to    : Senior Planning Engineer

 

Task:

  1. To provide key support to Business Development and Estimating Division on tender phase, provide direct support and governance to project planning/scheduling team on site for setup detail schedule, plan value, progress update and detail look ahead program, provide key support for project planning/scheduling on variation works.

 

FLSmidth Indonesia (Subsidiary of FLSmidth)

PLANNING ENGINEER

August 2012 – February 2013
 

Industry           : Bulk Material Handling, Minerals, Machine & Equipment Manufacturer
Project             : Out of Pit Crusher and Conveyor (OPCC) project PT. FLSmidth Indonesia joint venture PT. WIJAYA KARYA for PT. ADARO Indonesia

 Location         : Tutupan, Tanjung-Tabalong City, South Kalimantan, Indonesia
Project Value   : Over Than USD 200 Millions
Specialization : Project Planning, Scheduling & Controlling
Reporting to    : Project Manager & Project Director

 

Task:

  1. Prepare Weekly & Monthly % Complete S-Curve (Civil, Mech & Elect)
  2. Collect update data (% Completed) from Fabricator & Subcontractor (Logistics, Shipment Plan, Steel Supply, Site Assembly, Procurement, Engineering, and O&M)
  3. Using PRIMAVERA P6 Ver. 7 to Update Overall Schedule and Analyze the critical path and advice project team the potential cause of delay.
  4. Attending Civil, Mechanical, & Electrical weekly meeting with Client
  5. Update data for Handover Area Target Milestones to monitor the handover by each area are not behind the schedule.
  6. Assist Project Manager & Project Director to Track/Control the Construction and compile the Monthly Report
  7. Conduct weekly meeting with Subcontractor Planner to review the schedule
  8. Distribute Overall Onshore & Offshore schedule after finalized and approved by Project Director
  9. Making detailed schedule with Ms. Project 2010 such as Civil, Structural, Mechanical & Electrical Schedules, Operational & Shutdown planning (Stacking Plan)

Scope of Work:
Total system capacity = 12,000 tph;
- 2 x Semi-Mobile Overburden crushing stations – 6,000 tph each
- 2 x Mobile Discharge Conveyors
- 3 Overland conveyors. Combined length ~10km
- Relocatable conveyor = 2,400m
- Mobile Overland Tripper
- Mobile Stacking Conveyor – 411m
- Mobile Stacking Conveyor Tripper
- Spreading Conveyor
Include of civil works:
- Massive machine foundation for Crushing Station, Gabion Wall, Bridge Structure, Underpass Tunnel, Drainage & Terramet Wall

 

FLSmidth Indonesia(Subsidiary of FLSmidth)

QUALITY CONTROL - CIVIL

December 2011 – August 2011

 

Industry                       : Bulk Material Handling, Minerals, Machine & Equipment Manufacturer
Project                         : Out of Pit Crusher and Conveyor (OPCC) project PT. FLSmidth Indonesia

  joint venture PT. WIJAYA KARYA for PT. ADARO Indonesia

 Location                     : Tutupan, Tanjung-Tabalong City, South Kalimantan, Indonesia
Project Value               : Over Than USD 200 Millions
Specialization             : Quality Assurance & Quality Control
Reporting to                : QA/QC Manager


Task:

  • Quality Control for Sleeper and other concrete works such as :
    1. Witness at any Sleeper and other concrete which tests
    2. Check the material use for production
    3. Monitoring the temperature before and after the concrete pour into the mold.
    4. Check every concrete and repair if damages according to the quality standard that has been agreed.
    5. Monitoring molding condition before pouring the concrete, pouring concrete time, and open mold after concrete inside the mold have enough strength.
    6. Scheduling for transportation Sleepers to change place to the stock yard according its own strength.
    7. Map the location for every Sleepers for easy check to comply with the consultant desired.
    8. Final check for every concrete product according to the quality.
  • Quality Assurance for Sleeper and other concrete works such as :
    1. Record and report sleepers production and other concrete works.
    2. Attending meetings with client representative, consultants, subcontractor and supplier to describe the quality of work in the field.

 

Inti Karya Indonesia

CIVIL ENGINEER

February 2011 – November 2011

 

Industry                       : Building & Civil Construction
Project                         : Various Local Government Project  in Surabaya & East Java
Specialization             : Engineering

Reporting to                : Site Manager

 

Task:

  1. Responsible in Preparing Engineering Design, Analysis and Calculation of Civil/Structure Work comply to Safety in Design.
  2. Organize and manage all aspects of the workload for drafters allocated to team within the parameters of a project schedule.
  3. Responsible in Checking the drawing and Specification prior  to Construction.
  4. Responsible in preparing material take off, estimate cost and purchase requisition to the project requirement.
  5. Preparing and Maintaining standard drawing, specification and procedures of civil engineering.
  6. Monitoring on site if any discrepancy between actual & the drawing.
  7. Make sure that proposal/approval drawing have been allowed the Safety in Design.
  8. Commence the data input from other discipline for design and revise for updating and pre-construction and installation works.

 

BAM Decorient Indonesia (Subsidiary of BAM International)

QA/QC INSPECTOR - CONCRETE

June 2010 – September 2010

 

Project Name                         : Xblocs for Gorgon LNG project – Barrow Island, Australia
Project Location                      : Cilegon, Banten - Indonesia

Client                                       : Kellogg Joint Venture Gorgon (Chevron, Shell and Exxonmobil)
Owner Representative            : Velosi
Reporting to                            : QA/QC Manager

 

Task:
Quality Control for every type Xbloc Gorgon Precast Armor such as :

  1. Check the material use for producing the Xbloc
  2. Monitoring the temperature before and after the concrete pour into the mold.
  3. Check every Xbloc and repair if damages according to the quality standard that has been agreed.
  4. Monitoring molding condition before pouring the concrete, pouring concrete time, open mold after concrete inside the mold have enough strength.
  5. Scheduling for transportation Xbloc to change place to the stock yard according its own strength.
  6. Map the location for every Xbloc for easy check to comply with the consultant desired.
  7. Final check for every Xbloc according to the quality.
  8. Record and report production Xbloc progress daily, weekly, monthly and for the first shipment.
  9. Attending meetings with client representative, consultants, subcontractor and supplier to describe the quality of work in the field.

 

Widya Satria

SITE ENGINEER

February 2010 – May 2010

 

Project Name                          : Cibinong Public Hospital
Project Location                      : Cibinong, Bogor - West Java
Project Value                           : Over Than USD 50 Millions
Specialization                         : Engineering
Reporting to                            : Site Manager

Job Description:
1. Bar Bending Schedule Preparation
2. Schedule Monitoring, Quantity & Quality Monitoring
3. Conduct weekly meeting with Hospital Manager
4. Produce Shop & As-built Drawing and Technical Administration
5. Conduct weekly meeting with Hospital Manager
6. Daily & Monthly Report regarding construction activity

 

Garahan Jati

SITE ENGINEER

February 2008 – December 2008

 

Project Name              : KE 3 LOT III - Civil Works of PT. PLN Main Substation for PT. AREVA T&D
Project Location          : Sekar Putih-Mojokerto, Tegal Besar-Jember, & Sanggrahan-Magelang
Project Value               : Over Than USD 30 Millions
Specialization             : Engineering
Reporting to                : Site Manager

Job Description:

  1. Realize contract document, project cost estimate, project quality plan
  2. Realize planning coordination shop drawing, super imposed drawing and as built drawing
  3. Realize job time-table planning
  4. Dominate construction technique and follow the development
  5. Realize use construction device management
  6. Review of Bar-bending schedule to be implemented
  7. Realize welfare, work well-being (k3)
  8. Realize cost analysis scheduling
  9. Make Weekly & Monthly progress report