Engineer Planning, Galfar Engineering & Contracting SAOG, Off Plot Delivery Contract (HPG Gas Well Delivery) – Oman North
Working as Engineer Planning for Off Plot Delivery Contract (HPG Gas Well Delivery) – Oman North.
ü Identification of the high-level drivers of the schedule including the project phase, work breakdown structure, organizational philosophy, work packaging, and key project milestones.
ü Interpretation of the scope from the PM’s scoping document, BOQ’s and Preliminary drawings.
ü Setting up the Project Master Plan, incorporating the above, and developing the Basis of Schedule for sign off by the PM and the client.
ü Reporting progress against the base-lined schedule including S-curves. Establishing appropriate reporting formats in a standard report i.e. Progress Measurement sheet / (TAD – Turn around Document).
ü Develop a Baseline Control Programme that reflects the execution strategy and provides a baseline for controlling the execution of the works.
ü Schedule Trend Analysis & Forecasting.
ü Alternate work methodologies.
ü Programme change Control.
ü Develop and implement project control procedures in conjunction with supporting project ancillary functions.
ü Coordinating subcontractor activities with site.
ü Primavera P6 is the tool used for the Critical Path Method scheduling.
ü Complying with safe work practices and ensure that safety is demonstrated as the highest priority.