Assistant / Planning Engineer, Descon Engineering Qatar, “Laffan Refinery” Gas Plant Subcontracted to Descon Engineering. Scope of project was annual Turnaround Maintenance of Static Equipment.
1. Descon Engineering Qatar L.L.C
07th Jan 2014 to till date ---Descon Engineering Qatar L.L.C (Qatar-Doha city)
Designation: Planning Engineer in Shutdown project.
Project’s worked on:
1. Laffan Refinery, Raslaffan
(Laffan Refinery Turnaround)
· Worked as a Planning Engineer for “Laffan Refinery” Gas Plant Subcontracted to Descon Engineering.
Scope of project was annual Turnaround Maintenance of Static Equipment.
2. Qatar gas, Raslaffan
(Train 7 & 1 Shutdown Turnaround)
· Worked as a Planning Engineer for “Laffan Refinery” Gas Plant Subcontracted to Descon Engineering.
Scope of project was annual Turnaround Maintenance of Static Equipment.
Roles & Responsibilities:
· Develop execution plan for Plant Turnaround Maintenance according to the Plant history, Scope of Work, and Inspection Work List.
· Preparation of completed area wise schedule along with the resources like equipment and manpower to expedite the job.
· Preparation of daily progress report & S-Curve for turnaround and examining the effect of progress against the base line schedule.
· Preparation of method statements, job packs for individual equipment and participate in TRA (Task Risk Assessment) meetings for critical jobs.
· Calculation of all required resources to complete the job within planned budget.
· Closely monitor and analyze major shutdown activities status on a daily basis, and emphasizing to schedule/execute critical work on priority which could have impact on timely completion of shutdown.
· Assist Project Manager, maintenance Team Leader and supervisors/foremen on different critical issues as per requirement.
· Overall control of documents & drawings of the respective Discipline In charge.
· Provides expert advice to Discipline In charge from Planning and Monitoring point of view.
· Generate site related Technical queries to client as per the site requirement through Engineering Department.
· Monitor progress to ensure that the project is progressing as planned and the targets would be met. To rise flags if the targets are likely to slip. At every stage would apprise I/C Planning of the latest progress trends.
· Close coordination with all job supervisors/foremen.
· Participate in promotion of HSE awareness as member of HSE group.
· Planning of daily and one day forecast activities and arranging the permit for forecast activates following the permit to work system of company.
· Direct dealing with Client and Sub-Contractors for the queries and technical issues to avoid any delays in the project and sorting out solutions to expedite the job within the scheduled time.
· Preparation of the Close out reports, Lesson learned and Recommendation reports.
2. GULF SKY CRANES & CONTRACTING COMPANY (GSCC)
07th Jul 2012 to 13th Jul 2013 GSCC GROUP LTD. (Saudi Arabia-Jubail city)
Designation:Planning Engineer in Mechanical Construction project.
Project’s worked on:
1. Waist Gas Plant (Saudi Aramco Project)----(Mar-2013 to Jul-2014)
· Worked as a Planning Engineer for “Wasit Gas Plant” (Saudi Aramco Project) Subcontracted by S.K. Engineering.
· Scope of project is Piping, Structure and Equipment Installation.
2. SIPCHEM
(Wire Cable Compound Project) ---- (Nov-2012 to Mar-2013)
· Worked as a Planning Engineer for Projects “WCC POSCO” (SIPCHEM Project)
· Scope of project was Piping, Structure and Equipment Insulation/Installation project.
· Alcoa (Ma’den Rolling Mill, Smelter Port Facility, Cast House) Sub Contracted by Samsung Engineering--- (July-2012 to Nov-2013).
· Worked as a Planning Engineer and Project Coordinator for Projects “Alcoa (Ma’den Rolling Mill , Smelter Port Facility, Cast House)
· Sub Contracted by Samsung
· Scope of project was Piping, Structure and Scaffolding & Cladding.
Roles & Responsibilities:
- Preparation & Tracking of the project master schedule and summary level curves and Man power histogram.
- Identification, monitoring & streamlining of critical paths running through the Project Master Schedule and individual contracts.
- Weekly/Monthly reports generation including ‘S’-curves for client & Management review.
Job allocation to all Discipline Engineers and follow up for daily job progress. - Cost control by Optimization of Resources utilization.
- Understanding project work scope, needs and deliverables, contract milestones, Estimating budget quantities, costs, durations and resources.
- Aligning Project work scope with company structured WBS (Work Breakdown Structure).
Coordinating with subcontractors. - Preparation of MONTHLY/WEEKLY production schedules, Customer delivery schedule, Resource allocation schedule.
- Holding Weekly/Daily production meetings, Inventory monitoring meetings, addressing short falls, cycle time overages, resolving production requirements& Risk analysis & management.
Preparation, Review & Publishing of MIS & Monthly/Weekly/Daily reports on Operational activities.
3. Phonon Technologies
(20th May 2011 – 30th June 2012) Phonon Technologies LLP—India
Designation:Planning Engineer in engineering project department.
Work Area:BTS Tower and Machinery Installation Planning
Roles & Responsibilities:
- To Coordinate Between Vendor And Operating Company For day to day Installation and Maintenance Activities.
- To Plan the Installation Activities and complete the target within set period of time.
- To Report Daily Installation of sites and to Push the vendors to achieve the set target
- Maintain proper Coordination with logistic for smooth functioning.
4. Jet Airways (India) Limited (Mumbai)
(06th May 2008 – 05th May 2011) Jet Airways--- India
Designation:Progress Chaser in engineering planning department.
Work Area:Production Planning
Roles & Responsibilities:
- To forecast and plan aircraft maintenance tasks/checks and prepare/review work packages for scheduled/unscheduled maintenance considering optimum utilization of available resources and cost effective.
- To ensure on time delivery of spares for smooth functioning of maintenance activities.
- To establish well coordination between various dept. like stores, maintrol, AOG desk, defect cell, line maintenance.
5. Bharat Aviation Pvt Ltd (Mumbai)
(16th April 2004 – 24th April 2008) Bharat Aviation Pvt Ltd –India Mumbai
Designation:Aircraft Technician
Work Area:line maintenance.
Roles & Responsibilities:
- Working as an aircraft Avionics Technician, Assisted in Carrying out snag rectification, Removal and installation of cockpit Avionics Equipment’s.
6. Acme Tele Power LTD. (Rajasthan)
(16th July 2000 – 24th Feb 2004) Acme Tele Power ltd. India (Jaipur)
Designation:Project Engineer
Work Area:Planning and coordination of BTS & BSC cell sites projects.
Roles & Responsibilities:
- Looking after the projects and accomplish the day to day target of completion of BTS sites and performing acceptance test and handing over the sites to Airtel.
Total Work Experience of 13 years till date.
- Company:
- Industry:
- Job Role:
- Project:
- Region:
- Skills & Expertise: