  • Ensure established objectives throughout the project to increase the motivation and involvement.
  • Preparation of Installation Method Statements prior to commencement of work. And assistance in the development and review of specific task project method statements
  • Co-ordinate on quality matters with project team, suppliers and certification authority representatives.
  • Preparations of all relevant project installation check lists.
  • Preparation & updating of the ITP as required and developing installation check list where non standards works are included in the specification
  • Preparation of MRI (Material Receipt Inspection) formats for incoming plant and materials and carrying out inspection with the consultant or other third parties as required by the contract to ensure that only approved materials are installed.
  • Liaising with Construction Managers and carrying out internal inspections of in-process installation work. Carrying out visual Inspection & snag list preparation.
  • Liaising with Construction Managers and preparing a weekly WIR (Work Inspection Request) schedule. Ensuring WIR will be carried out in accordance with contract requirements.
  • Confirming WIR for in-process works aims to cover 10% of the installation
  • Maintaining WIR records and a WIR tracking schedule in order to monitor the status of WIR and monitor WIR performance
  • Ensuring that a ‘Benchmarking’ process is applied. Confirming, the first WIR carried out on a particular type of installation shall be benchmarked. (Benchmarks will pass WIR without comment – typically A status and Benchmarks are photographed. Operational staff is advised and are shown benchmarked work to follow the same.)
  • Prepare CAR, NCR applicable quality system standards.
  • Maintaining the Project Non- Conformity report register.