Operations Manager reporting to GGM, Saipem Contracting Nigeria Limited, Calibration of Oil & Gas Tanks/Leak Detection Test+Pipeline Maintenance

START Date: 
March, 2012

SPECIALIZATION

Planning, Project  Control,Contracting and Oil & Gas Storage Facilities Specialist

KEYS SKILLS & EXPERIENCE

-Program Management and Project Control/ Technical & Commercial Tender & Contract Management/ Buiness Development Environmental Management Program/Field Development Project/ Perform Alert Technologies Tank Test Using Ullage Program/Perform Underfill Leak Detection Test Procedures + Pipeline Maintenance.

Includes:-

  • Prepare and Issue Certificate of Clearance to Clients for Leak Detection Test of Storage tanks+Pipeline Maintenance
  •  Under take the Calibration of Petroleum Storage Tanks
  • Undertake Surface & Underground Oil & Gas Storage Tanks Facilities etc.
  • Undertake pressure test of tanks and other vessels as required in  oil & gas facilities
  • Undertake the Installation and Upgrading of Onshore and Offshore Production Facilities, FPSO Vessels,  Marine Vessels  
    • Preparation of Site Visit checklist for offshore and onshore projects,
    •   Development of Site sketches, preparation of site visit report,
    •   Development of on-site sketches to As-build Drawings,
    •    Preparation of API I4C Compliance Report
    •    Preparation of Data Sheet for Orifice flanges, fittings and plates, Daniel Orifice, PCV, PSV, Turbine flow meters.
    •    Preparation of Valve List
    •    Preparation of Tie-in List
    •    Preparation of Line List
    •    Carried out calculations for Blow down,
    •    Carried out calculations for PSV and LCV Scrubber sizing
    •    Carried out calculations for Orifice Sizing