Guild of Project Controls: Compendium | Roles | Assessment | Certifications | Membership

Planning Engineer, Petra Resources Sdn Bhd, Hook-Up & Commissioning

START Date: 
June, 2013
WORKING EXPERIENCE  Company Petra Resources Sdn Bhd (PRSB) Business nature Offshore Hook-Up & Commissioning Industry Oil & Gas Position Site Planner Duration April 2012 – December 2012 Work Description Seconded to PRSB and assigned as Site Planner for Onshore Fabrication Project at Petra FabricationYard, Labuan.Job scope & Main task: 1. To prepare Daily Progress Report for Daily fabrication work at yard.2. To supervise and advise for daily work as per scheduled to Fabrication Superintendent in order to execute work as per planning package.3. To monitor in every matters that can delayed work progress such as differential between drawing and site stringing, insufficient material, low number of manpowers, etc.4. To check with Material Take-Off (MTO) and Material Expediting Report (MER) for any missing material that could delayed the work progress.5. To advise Fabrication superintendent, supervisor, foreman, etc on daily work priority in order to catch-up fabricated material ship-out to offshore.6. Dealing with Client Representative in giving progress briefing, and work strategies in order to expedite work progress.7. Dealing with Mech/Piping Engineers, Structures Eng, and PMT regarding to any technical issues to give suggestion on strategies on expediting work progress and to counter any matterduring fabrication8. To prepare jobcard for Hook-Up & Commissioning work for Offshore & Onshore work. Assigned as Site Planner for Onshore Fabrication & Installation at Persafe Engineering Yard forBintulu Crude Oil Terminal (BCOT) 1. To monitor progress in fabrication & Installation work at yard and site.2. To prepare Daily Progress Report for work progress.  Project Involved Petronas Carigali Sdn Bhd, SKO Pipelines Rejuvenation Project 2010–2012 PL 364 & PL 366 for BYP-A, TEP-B & BCOT     Company Epic Mushtari Sdn BhdDepartment Offshore Construction CompanyIndustry Oil & GasPosition Technical ExecutiveDuration November 2010 – July 2011Work Description Seconded to EPIC Mushtari and appointed as 2. To prepare procedure for company operations and specific job required by clients.3. Act as Manpower Coordinator for Manpower Supply Division to make sure all client requirements are fulfill.4. To act as Document Controller (DC) to secure all incoming and outgoing procedure drawing, and any native documents.5. Developing MTO from given Isometric drawing for Material order for HUC projects.  Project Involved Mercury removal Unit (MRU) project for CARIGALI HESS, CKP PLATFORM, 2009 - 2010Company Coral Intoil Sdn BhdDepartment Offshore Construction CompanyIndustry Oil & GasPosition Technical ExecutiveDuration May 2010 – PresentWork Description Appoint as Technical Executive and the job scopes are: 1. Act as Proposal Executive for any Invitation to Bid (ITB) for any client’s tender that company involved.2. To prepare procedure for company operations and specific job required by clients.3. Act as Manpower Coordinator for Manpower Supply Division to make sure all client requirements are fulfill.4. To act as Document Controller (DC) to secure all incoming and outgoing procedure drawing, and any native documents.5. Act as Project Scheduler in preparing for Hook-Up & Commissioning Project tender.Task include of planning/scheduling project durations, project estimation, manpower loadings, task relationship and etc.6. Developing MTO from given Isometric drawing for Material order for HUC projects.7. Involve project tendering for PCSB, Sabah Shell, Sapura Kencana, and etc.Company KWH Technlologies Sdn. Bhd (Warga Hikmat Engineering Sdn. Bhd)Department Tank MaintenanceIndustry Oil & GasPosition Site SupervisorDuration Jan 2010 – May 2010Work Description Appoint as Site Supervisor for Exxonmobil tank cleaning project at Westport, Klang. The job scope is: 1. Preparing Work Permit and Job Safety Analysis (JSA) for daily activity.2. Planning daily activities base on company schedule to achieve targets.3. To supervise co-worker and advising project manager to give ideas, orders, and plannings.4. Responsible in work progress and to prepare report for company and client.5. To plan work step with supervisor, manager, and client. Project Involved Exxonmobil Westport Depot Chemical and Fuel Tank Cleaning Project  2010.     Company Warga Hikmat Engineering Sdn. BhdDepartment Plant TurnaroundIndustry Oil & GasPosition Joint & Flange Integrity Team (JIT) Management SupervisorDuration September 2009 – Jan 2010Work Description Successfully conducting Joint Integrity Team (JIT) during Petronas Penapisan Melaka / MalaysiaRefining Company (PPMSB/MRC) Major Turnaround 2009. The job scope is: 1. Responsible in analyzing joint & flange types on equipments and pipes in oil & gas plant for maintenance works.2. Responsible in identifying correct bolts, gasket, and lubricants for each flange in order toavoid leaking.3. Preparing work procedure in blind & deblinding flange during maintenance.4. Preparing tagging system to identify joint that had been blind/deblind.5. To identify flanges and pipes location by referring to P&ID, PFD, ISO Drawing.   Project Involved Petronas Penapisan Melaka/Malaysian Refining Company (PPMSB/MRC) Major Turnaround/Revamp2009/2010Company Infineon Technologies, Melaka (Malaysia) Sdn. BhdDepartment Plant Facilities (PF) DepartmentPosition Environmental Trainee EngineerDuration 8 months (December 2007 –July 2008)Real ProjectInvolvement 1. Assigned to develop a feasibility study for each equipments used in the plant to make sure the equipment is suitable and efficient for the plant.2. Create a Daily Waste Water contaminants level at input and output to determine the equipment and process efficient.Other task 1. To assist engineers in solving problems related to Waste Water Treatment Plant.2. Involve in Weekly Department Meeting Reports to highlight the matter in the plant to the management.3. To assist vendors and operators in explaining the plant system.4. Involve in other Plant Facilities Dept. plant branches such as Mechanical Plant, and ElectricalPlant.5. Involve in company Family Day 2008, appointed as one of the comity.