Safety Coordinator / Senior HSSE Coordinator, PEC LTD, ECC BUKOM, HCF Exxon Mobil PAC Jurong Island, SPT IRF MPO6 Exxon Mobil Jurong, CT Project PAC Jurong Island, SHELL BUKOM Recovery Team 2011.
Field Experiences
Kajima Corporation Pte Ltd (1994 - 2000)
* Water Proofing Specialist / General Construction * Grouting Epoxy Injection Hydro Foam Chemical Grouting Bitumen Laying Shell Coating Torch On Membrane Stick on Membrane Fiber Glass Laying Brick Laying/Construction Forming Works Plastering / False Ceiling Works Silicon Application Tiling / Sanitary Repairs Painting Roof Repairs Safety and Site Supervisory
*CAAS * (2000 – 2007)
Fire Safety Emergency Preparation and Evacuation Drill Hot Works/Cold Works Permit application Confine Space Accessor / Rescue Fire Fighting Hydro Testing – Fire Hydrants/Breeching Inlets Building Inspections Hanger Inspections Tunnel Inspections Runway Inspections Marine Rescue Fire Boat Operation Underwater Rescue Steersmen
* PEC * (Current)
Site SH&E – 19 Tuas Fabrication/HQ/Workshop/7 tuas basin/6 Tuas/ Banyan 1 and 2, Tembusu Jurong Island Facilitator 19 Tuas Building Maintenance 19 Tuas WHP Committee Member ( Lead – WHP Event June 2008 ) SHE Editorial – Publishing/ Layout Artist/ Advisory PEC Environment Programme 2011 – Leader PEC Corporate Risk Assessment Committee Member 2011
Completed/Ongoing Sites as SHE practitioner
EM-HCF JI Plant Construction WSHE Asst - May 07 – Jan 08 Completed COPL Chevron Oronite WSHE Asst – DEP Tankage Project – Completed TPS Soxal HYCO Shutdown WSHE – Mar 08 – April 08– Completed ECC BUKOM/BRM– Ethelyn Cracker Complex WSHE – Support Exxon Mobil MP06 Project Sub-Lead WSHE - Dec 2008 – Completed SPT IRF MP06 TK-164 and TK165 Tankage Jurong Refinery WSHE – Completed EM-MPHC Shutdown 09 Supplied to EXXON MOBIL– Completed SPT IRF MP06 Main Mechanical Piping Marine WSHE- Completed EM-Transplus 2 Structural/Civil works WHSE – Completed SPT IRF MP06 TK160 Tankage and Main Piping WSHE – CompletedSPT IRF MP06 MPHC Unit -Civil, Structural and Piping WSHE – Completed
Exxon Mobile - Marine LPG / Naptha / Toulene / pipe line demolition and installation Berth overhaul / fuel transfer berth overhaul and repair works - Completed
SPT IRF MP06 Main Mechanical Piping, Structural Adjustments and Unit Shutdown Appointed Lead WSHE Coordinator – SPT IRF Jurong - Completed Appointed Lead WSHE Coordinator – EM/FWP - TP2 Conversion – Completed
Promoted as Senior Coordinator for good performance in Quality Assurance, Cost Effectiveness in SHE Budget and ZERO LTI in project completion
SPT IRF Completion Team (Short term) – CT Projects Pulau Ayer Cawan – Completed
EM Jurong Turnaround 2011 Supplied to EXXON MOBIL– April 4th to May 3rd – Completed
PEC Corporate Environment Programme preparation.
SHELL BUKOM – PH43 Recovery team 7th October – 24th October – Completed ( Recent Fire Incident at Pump House 43)
Currently as a Senior WSHE Practitioner I am undertaking major job scopes and office and sites, where by I have to move around whenever required, working closely with my company and clients requirements in SHE related matters.
In summary my WSHE roles, responsibilties and practices in the field are as follows:
Office Related
1. Conducting SIC 2. Conducting SIC (Client Representative) 3. Documentation of SHE/Filing 4. Conducting Mass Tool Box Meetings 5. SHE Campaigns/ Promotions 6. Daily site SHE walk/inspections 7. Monthly Audits, Evaluation and Control 8. Report Analysis and Case Review – BBSO 9. Accident investigation and Analysis 10. Daily/Weekly/Monthly Meetings 11. Management Walk about and Management Meetings 12. SHE Training Theoretical/Practical 13. Permit Application/Gate Pass 14. PEC SHE Newsletter Editor/Designer 15. SHE News update and review with MOM 16. Facilitator and Building Maintenance 17. Manpower Deployment & Control 18. Equipment Deployment Plan 19. Security and Logistic control 20. Accident/Incident investigation 21. FWP/Client Training application and appointed trainer
Technical and Field Related
1. ERT Member/Trainer 2. First Aider – In house Training 3. 4 in 1 Gas Monitoring/Repair 4. Site Spot Mitigation 5. Hot Tapping – Live lines 6. Cold Cutting 7. Blinding/De blinding /OPE 8. Heavy Lifting/Tandem Lifting /Lifting Operations 9. Pump Installation and Alignment 10. Shaft Alignment and Calibration 11. Bundle Pulling 12. Reactor Installation 13. Heat Exchanger Cleaning/Installation 14. Machinery/PWHT 15. Marine safety and Rescue 16. Flange Breaking/Installation and fitting/Tie In 17. Flare Installation/Demolition 18. Fire Resistant Painting 19. Chemical Cleaning 20. Catalyst insertion and dumping 21. Inert Entry operations 22. Radiography
Coordinated with the following alliance partners on SHE matters in projects 1. Dialogue - Inert entry team 2. CR Asia – Catalyst loaders specialist 3. TD Williamson – Cold/Hot Tap specialist 4. Industrial Services (IS) – Insulation specialist 5. Nippon Express - Equipment installation specialist 6. FRP – High density flame proof painting specialist 7. Fajouli – Equipment lifting specialist 8. Al Jabar - Heavy lifting specialist 9. Cuestar – Radiography specialist 10. Acer- Radiography specialist 11. HSL – Civil engineering specialist 12. PESKO – Electrical engineering specialist 13. Presco – Scaffold specialist 14. CARBER – Cold cutting specialist
Awards in PEC 1. Appreciation Award for PEC SHE Newsletter 08 2. Appreciation Award for PEC SHE Work Place Safety Health Promotion 08 3. Attained Best Safety Supervisor for Overall Project MPO6 4. Attained 7 Best Contractor Award for Overall Project MPO6 5. Achieved OHSMS Sharp Award 2010 for PEC LTD Jurong Mobil Maintenance. 6. Appreciation Award for achieving OHSMS Sharp Award 7. Nominated as Environment Leader for 2011 and onwards
- Company:
- Industry:
- Job Role:
- Project:
- Region:
- Skills & Expertise: