PLANNING,BILLING ,MONITORING,BUDGETING AND CONTROLLING, SMPLEX INFRASTRUCTURES LTD, EXPANSION OF RELIANCE REFINARY PROJECT,JAMNAGAR,GUJRAT
Organizational Experience : |
Sr.Manager- Planning,Billing,& Controlin “SIMPLEX INFRASTRUCTURES LTD.” From :January’2010 till date
Right now posted in “Jamnagar J3 Expansion Projects ,SEZ Gasification”in Reliance Industries Limited from July’2013
Scope:Constructionof Precast Pipe Racks,,UG Piping,AG Piping,,Substation,&Structural Works,Job Value :1200 Crore
Deputed in Paradip Refinery Project at Paradip,Orissa,India under IOCL for LSTK,Package-B ,Job Value:1123 Crore.
ProjectScope:
Design Engineering ,Procurement ,Construction and Commissioning of Kero Treatment Unit ,Sulpher Recovery Unit ,
FCC LPG Treatment Unit, FCC Light Naptha Treatment Unit, Alkylation Unit ,Butane Isomerisation Unit ,Spent Acid Regenaration, Flue Gas Desulphurisation Unit.
Responsibilities :
· Project Planning ,Scheduling,Budgeting &Monitoring . Project Scheduling by Primavera-P6
· Delay analysis ad contractual correspondence with the client
· Preparation DPR & DLR of Sites and submit to RO
· Preparation of MIS, MOM.
· Steel reconciliation & preparing status report of project & labour percentage.
· Preparation of revised schedule as required & maintaining drawing register.
· Planning, Budget, Cash in-flow & out flow.
1. Manager-Planning(Civil)in “JUSCO-A TATA ENTERPRISE.” From: April'2006- December‘2009
Project:
Construction of 25MGD. Water Treatment Plant at Haldia,Dist : East Midnapore, West Bengal,India
Construction of 12 MGD Water Treatment Plant at GardenReach, Kolkata for CMWSA
Responsibilities:
Project Planning ,Scheduling, Budgeting &Monitoring . Project Scheduling by Primavera-P6
· Preparation of Budget for Civil & Structural Work.
· Control of Budget by reviewing the cost of work executed by the vendor on regular basis.
· Participating in project review meetings for evaluating project progress.
· Compliance of quality standards to maintain the quality of the work.
· Liaison with client & consultants on determining technical specification
2. Manager-Planning in “ Navayuga Engineering Co.Ltd.” From : November’2003-March’2006
Construction of 500MW Thermal Power Plant at Farakka ,Dist : Murshidabad ,WestBengal
Construction of two G+30 Storied residential cum commercial complex in Calcutta,West Bengal.
Responsibilities:
- Project-Planning and preparation of work schedules through Primavera-P6. Resource Planning.
- Coordination with Client and Customer.
- Checking of quality as per specification.
- Furnish timely Reports on site activities to the reporting manager. Preparing Client Bill as per executed work month wise
- Making completion schedule step by step, working drawing (by Auto CAD software), BBS, BOQ, Rate analysis of Buildings item.
3. Sr.Project Engineer in “East Coast Construction Ltd.” From:January’2001 - October'2003
Project: -
Planning , Monitoring & Supervision for construction of two G+10 Storied Residential Buildings with a Covered Area of
200000 SFT. in Calcutta,West Bengal.
Responsibilities:
· Preparation of BBS, BOQ, Working Drawing, Client billing, sub contractor billing
· Execution and monitoring steel structure and its layout, fabrication and also erection
· Preparation of Civil Engg. drawings and estimates,
· Pilling works (Driven Piles) with Pnumatick Rigs.Dia of Piles :500 mm.Number of Piles :800
· Building works (foundation, basement and structure, grouting & water proofing along with brick work and plastering work)
· Preparation of Budget for Civil & Structural Work.
· Control of Budget by reviewing the cost of work executed by the vendor on regular basis.
4. Project Engineer at “Lalkar Marine Pvt.Ltd.” From :January’1995 - December'2000
Project:-
Construction of 5 Nos. G+10 Storied residential building at Kolkata with a covered area of 150000 SFT.
Responsibilities:
- Preparation of BBS, BOQ, Working Drawing, Client billing, sub contractor billing
- Execution and monitoring steel structure and its layout, fabrication and also erection
- Preparation of Civil Engg. drawings and estimates,
- Pilling works (Bored piles) with conventional pilling rigs. 450 mm diameter piles. Number of Piles :1500
Building works (foundation, basement and structure, grouting & water proofing along finishing works .