Planner/Scheduler, GIKI, Snamprojetti, Wapda, Grid Station Construction Projects, Multiple IT Engineering Projects, Oil & Gas
Snamprojetti, Calgary, Alberta
Planner/Scheduler
Development of comprehensive and realistic (Level 3) schedules.
Syncrude(Aurora), Fort McMurray, Alberta, Canada
Planner/Scheduler
Updated Activities, in the schedule. Prepared reports. Coordinated with contractors for HQP (Hourly Quantity Plan), DSC (Daily Schedule Control), and weekly performance reports and meetings.
Key Contributions:
· Prepared Earned Value reports and presented in term of SPI, CPI to senior management. Properly implementedPD&E SFM (System for Managing) Coordinated with Superintendents in order to get Daily Schedule Control (DSC) sheets
· Examined LEM(Labour Equipment Material)to make sure proper assigning of P-Codes. Generated Weekly, Bi-weekly and Monthly Progress Reports
Water and Power Development Authority, Islamabad, Pakistan
Scheduler
Participated in executing project for installation of Grid Station’s high-power cable system, power control, and monitoring system instruments. Utilized Primavera to plan and develop master schedule for Integrated sub-contractor work into master schedule. Maintained variance between planned and onsite projects, as well as costs and resources utilized. Created and presented bi-weekly progress reports to construction manager. Closely monitored critical path to control performance and eliminated unexpected project delays. Coordinated with site management on man hours, scheduling, and trend management.
Key Contributions:
· Designed cost control system using Excel; prepared cost estimates, budget, man hours, and expenses for entry into system.
· Ensured accurate and current reporting of project progress.
GIK Institute of Sciences – Engineering Sciences and Technology, Topi, Pakistan
IT Project Planner/Scheduler
Created and maintained master schedule for design, development, and execution of IT infrastructure project. Loaded, tracked, and analyzed resources. Developed and presented project progress report. Coordinated closely with project management and staff in various capacities. Tracked project and critical activities. Advised management regarding exceptions to the plan along with corrective action and / or impact of project.
Key Contributions:
· Gained extensive knowledge of Primavera and Scheduling. Updated schedule, resources, tracked project, created baseline and generated reports.
· Created WBS (Work Breakdown Structure), planned deliverables and activities.