Site Planner, Foster Wheeler SA, Acrylic Acids and Acrylates Project (AAA)

START Date: 
October, 2002
END Date: 
September, 2003

I was site based on a multi disciplinary project, including design, procurement, fabrication and erection of piping, Building work, civil works, structural steel fabrication and erection, electrical and instrumentation erection in the petrochemical industry. Using Primavera software, I maintained the Level 4 Project plan, providing monthly, as well as weekly reports, as to the current project status, high-lighting any shortfalls in planned progress and possible problem areas. Creating and the updating, on a weekly basis, of curves based on earned man-hours versus planned man-hours. Reporting the Project status to the client. Assisted with Management and co-ordination of interface milestones with sub-contractors. The familiarity with NEC contract documents, general conditions, special conditions, scope of work and contractual drawings was of great importance.