Project Control Engineer, RWS Corporation, Iroquois Gas Transmission System

START Date: 
April, 2003
END Date: 
September, 2003

Prepared baseline schedule, monitored, analized and repoerted on a cost/resource loaded CPM schedule using SureTrak 3.1 for Iroquois Gas Transmission System. Prepared As-Planned vs. As-Built Schedule Analysis, charts and graphics.