Guild of Project Controls: Compendium | Roles | Assessment | Certifications | Membership

Project Architect, Turner Construction, EMAAR, DP Architects Pte Ltd, Arabtec Construction Dubai LLC, Al-Futtaim (Pvt) in Dubai, DBB, Construction of High Rise Buildings

START Date: 
August, 2002

Dear Sir:

I hope that I can have a great opportunity to achieve a good job in your Company.

I would like to appreciate and thank you for taking the time to read my resume.

I will be happy if there is an opportunity for me to work with your respectable Company, but if there is no chance for me now, please keep my C.V in your data bank and call me for interview whenever there is any vacancy that may suit my field.

(I wish your quick reply to be sure that my documents already received)

 

 

Mostafa Abdel-moniem AL-Askalany

Architectural Engineer

                                                                   TEL:  +966568646242 (K.S.A)

   +20124545496 (EGYPT)

E-mail:mostafa_askalany@yahoo.com

                  mostafa_askalany@hotmail.com

 

 

 

Preferable Positions as ranking:

.Technical Manager.

. Project Architect.

. Architectural Coordinator.

.Senior Architectural Engineer.

 

 

 

 

 

 

CURRICULUM VITAE

Personal Information:

Name:                      Mostafa Abdel-moniem AL-Askalany

Date of birth:             23/11/1980

Place of birth:           Mansoura - Egypt

Address:                  45 Ali basha st. mansoura - Egypt.

Nationality:                Egyptian

Marital Status:           married

 

Education:

B.Sc. in Architecture Engineering,

Architecture Department,

Faculty of Engineering,

 Mansoura University.

October 2002 (63.4%).

Project Degree (Good).

 

Languages:

Arabic:     Mother Tongue.

English:    Excellent.

 

Computer Skills:

Excellent use of 3D Studio Max.

Excellent use of Auto CAD 2D & 3D.

Excellent use of Adobe Photoshop.

Excellent use of Microsoft Applications (Word, Excel, Power point).

 

Experience:

SABV General Contractors Co.LTD.                                               April 2009 up to now

             Jeddah, KSA

As a Project Architect

  • Plans and schedules work, and, as applicable, determine work load and assignments of group. Provides leadership and direction to team by out-lining methods of approach and indicating critical areas and priorities to meet established deadlines.
  • Provides architectural input to the project.                         Coordinates architectural activities with activities of other disciplines.
  • Assists in coordinating the compilation of technical portions of Requests for Proposal (RFP) for both the design and construction portions of assigned project. Analyzes data pertaining to client requirements to assist in the definition of technical aspects of detailed scope of work.
  • Coordinates with engineering the development of design specifications, and ensure adequate information is provided for clarity of interpretation of required scope of work.
  • Participates in the technical evaluation of potential bidders for contracts on assigned project, and in recommending shortlists of qualified sub-contractors. Coordinates the technical analysis and evaluation of bids proposed.
  • Participates in final negotiations to determine final terms of contracts. Assists Project Manager in compiling technical portions of definitive contracts.
  • Monitors technical progress of sub- contractor at site. Coordinates the review of design drawings, specifications, manuals, shop drawings, vendor data, calculations and other technical information submitted by A/E construction contractor for all phases of contract.
  • Provides requested technical information to A/E or construction contractor regarding interpretation of specifications, and other technical guidance as required. Requests technical information or clarification of submitted data from A/E construction contractor as required.
  • Supervises and coordinates activities of Senior Project Engineers and other personnel assigned.
  • Performs other responsibilities associated with this position as may be appropriate.

Major Project Handled – (On-going):_

Construction and furnishing of student's dormitories and technical   staff housing for YIC & YTI 

Client             :     Yanbu Industrial College and Yanbu Technical institute.  

Management  :     Royal Commission for Jubail and Yanbu, KSA.

Consultant   :   Saudi Consulting Services, KSA

 

Space Consult Office                                            Aug-2008 to April-2009

             Dubai, UAE

 

As a Senior Architectural Engineer         

  • Provide leadership and direction to a team of 3 Architectural Engineers and 10 CAD Operators (Draftsmen) involved designing and drafting of huge projects and in setting up and maintaining of project file structure and protocols and to accomplish project goals and monitor out-put.
  • Responsible for overseeing the preparation of Auto CAD drawings, as per client requirements. Preparation of tender submission documents, systematic filing of all project correspondences.
  • Responsible for solving all design issues as per standards regulations and client requirements.
  • Coordinate activities of department with related activities of other departments to ensure efficiency and economy.
  • Establish a system to enable control of the inflow, outflow, storage and identification of documents and any subsequent changes to the documents.

 

            Major Project Handled – (On-going):_

            Mudon P123 Cairo Downtown

Client                         :           DUBAI PROPERTIES

Management                     :            MACE INTERNATIONAL LIMITED

Consultant                         :           SPACE CONSULT

 

 

 

Gulf Precast Company LLC                                                   Nov-2006 to Jul-2008

             Dubai, UAE       

 

As an Architectural Engineer                                                                     

  • Provide leadership and direction to a team of 10 CAD Operators (Draftsmen) involved drafting of Precast & Grc and in setting up and maintaining of project file structure and protocols and to accomplish project goals and monitor out-put.
  • Provide technical advice and guidance to team ensuring that critical or urgent situations are quickly addressed.  
  • Coordination with reprographic companies for external printing. Basic Auto CAD Station and plotting support for project team & Provide CAD orientation for new team members joining the project.
  • Responsible for overseeing the preparation of Auto CAD drawings, as per client requirements. Preparation of tender submission documents, systematic filing of all project correspondences.
  • Confer with supervisors to obtain data required for planning department activities, such as new commitments, status of work in progress and problems encountered.
  • Disseminate policy to supervisors. Give work directions, resolved problems, prepare schedules and set deadlines to ensure timely completion of work.

 

Major Project Handled – (On-going):_

 

Burj Dubai Development / The Dubai Mall Project – Dubai

Client                         :           EMAAR

Management             :           Turner

Consultant                 :            DP Architects PTE Ltd

Contractor                  :           Joint Venture

Dutco Balfor Beatty (DBB)

Al Ghandi Consolidated Contractors International Co. (AGCCC)

 

Gulf Precast Co.: Nominated Sub-Contractor for Design and Build of                                   Precast and GRC Façade.

Project Details: A huge Precast & GRC Cladding Façade of a total of AED. 170 Million

 

High Art Consultant Office                                      Dec-2005 to Oct. 2006

         Emirates Office

I joined Cairo Branch

                Egypt

 

As an Architectural Engineer                                                                     

  • Responsible for Design & presentation (Villas – Towers – Factories – Hospitals –interior design….).
  • Preparation of architectural working drawings – work shop drawing – land escape.
  • Coordination between architecture drawings and MEP works and structure drawings.

 

 

 

Kawader Consultant Office                                     Dec-2004 to Aug. 2005

                     Taif    

   Kingdom of Saudi Arabia

 

As an Architectural Engineer         

  • Responsible for Design & presentation (Villas – Towers – Factories – Hospitals –interior design….).
  • Preparation of architectural working drawings – work shop drawing – land escape.
  • Site supervision & site coordination (Finishing).

 

 

Kabnoury 2000 for Aluminum Works                                          Apr-2004 to Nov. 2004

                    Mansoura

                        Egypt

 

As a Designer & Sales Engineer       

  • Designer for kitchen and children bedrooms and aluminum windows and Terraces doors and entrances doors.

 

Joined Egyptian army at works ministry architecture department JUL 2003 to JUN 2004

 

Makka Al.mokarama engineering office                                     Oct-2002 to JUL. 2003

                    Mansoura

                        Egypt

 

As a Site Engineer          

  •  Site supervision & site coordination (Finishing).

          

Hobbies

Playing football.

 Listen to music.

Reading. 

 

Military Status:

Performed military service.

                                                                                 

Driving license:        

Egypt: Available.

UAE    : Available.

Saudi : Available.

 

 

 

 

 

Next page is choice of my work

 

 

 

 

 

 

 

 

choice of my work