COMMISSIONING S.V, ONGC, East Area Projects-EPC4A offshore Wellhead Retrofit and Revamp Project-Engineering
RESUME
FOR THE POST OF COMMISSIONING SUPERVISOR |
NAME : PATEL JIGNESHBHAI RASHIKBHAI
PERMENANT ADRESS : D/79 surya darshan Township,
Near Vishwamitri Railway Station,
Mangleshwar Road, Manjalpur,
Baroda - 390011(Gujarat), India
Phone no : + 91 265 6553225
Present contact cell no : 0091 9979976875
0091 9904877481
Email address : jkrlpatel@gmail.com
Date of birth : 29th June 1975.
Height / Weight : 175 cms / 56kgs.
Marital status : Married.
Nationality : Indian.
Caste & sub caste : Hindu Leuva Patidar.
Languages known : English, Guarati, Hindi.
Passport details : No- H 0422239, Issue place – Ahmedabad, Gujarat (India), Issue - 9th Sept. 2008, Expiry - 8th Sept. 2018.
For Offshore job : Passport Number:-MT0364
Passport Validity: - 2014-11-10
- FIRE PREVENTION & FIRE FIGHTING CERTIFICATE FROM MARINE TRAINING ACADEMY, GOREGAON, MUMBAI (VALID UNTIL 06/10/2014).
- PERSONAL SURVIVAL TECHNIQUES CERTIFICATE FROM MARINE TRAINING ACADEMY, GOREGAON,MUMBAI(VALID UNTIL 09/10/2014).
- HYDROGEN SULPHIDE(H2S) GAS SAFETY COURSE FROM The Shipping Corporation Of India Ltd.
Maritime Training Institute,Powai,Mumbai(VALID UNTIL 08/10/2014).
Educational Qualification
Examination Certificate | Name of board & University | Passing year | Subject | Class/Grade |
SSC | GSEB | March 1991 | Science | 2nd / 59 % |
HSC | GHSEB | March 1993 | Science | 2nd / 44 % |
B Sc (Chemistry) | GujaratUniversity | May 1996 | Chemistry | 2nd / 60 % |
Additional Qualification : I have passed “B” Certificate in N.S.S. in 1994.
: Certificate of creating a proactive work ethos.
23/24/25—June 2006.
Enriching Engineering Skills
Industrial automation Training from SOFCON INDIA PVT.LTD
A.PLC B.DCS C.SCADA
1.Wonder ware, USA (In touch version9.0)
2.ALLEN BREDLY, USA, (Review)
3.SIEMENS, GERMANY. (WINCC0)
4.GEFANUC, USA. (CIMPLICTY)
5.I CONICS, USA. (I CONICS)
D. VARIABLE SPEED DRIVES &MOTORS.
E. PROCESS INSTRUMENTATION.
Hobbies:Playing Chess, cricket, Reading books, Guitar, Swimming, Horse riding.
Singing and to make friends most like.
Career Objective
Seeking a challenging Career in a professional organization in which I can contribute to the company with my qualification, experience and corporate skills for the potential rise in the organization professional experience.
Experience:
I am working continue from 1996 in Oil & Gas, Petrochemical industry as a Field and DCS control panel operation. I have good knowledge of pre-commissioning, commissioning, plant normal start-up and shutdown activities. Hydrotesting witnessPunch listing, completions, piping, process instrumentation, test pack clearing etc.
Experience: more than 14 years of experience in EPC projects, process industries.
Compressor operation ELLIOTT EBARA GROUP. CIBA-JAPAN CENTRIFUGAL COMPRESSOR capacity 5183M3/hr, Power-1339KW for gas plant fuel gas, and KOBELKO (KOBE STEEL LTD) double stage double acting reciprocating compressor 1st stage 27398 kg/hr 2nd stage 25855kg/hr power – 3500KW for condensate stabilization unit.
Sr.No | Name of The company | Designation | Duration | unit/plant |
1 | OIL AND NATURAL GAS CORPORATION LTD.ASSAM,RDS | COMMISSIONING SUPERVISOR | October 2010. Till date | GGS-1 |
2 | KazStroy Service .Almaty For KARACHAGANAK-URALSK GAS PIPE LINE PROJECT(UGPP), | COMMISSIONING PROCESS ENGINEER | June 2010 to August 2010. | GAS PIPE LINE |
3 | OIL AND NATURAL GAS CORPORATION LTD.ASSAM,RDS | COMMISSIONING SUPERVOSOR | April 4th 2010 to June 1st 2010. | GGS-2 |
4 | MAERSK OIL, QATAR Agency:-M/S Alpha Project services (P) ltd. Baroda. | COMMISSIONING SUPERVISOR | July 17th 2009to March 24th 2010. | Offshore Plate form |
5 | RAS GAS LIQUIFICATION COMPONY, QATAR. AGENCY:-MPH TECHNICAL SERVICES. | PMC SUPERVISOR
(FROM CTJV) | March 15th 2009 to June 10th 2009. | Sour water, etp, refrigerant unit, acid injection package & utility. |
6 | M/S L&T LTD.Hazira, Surat. Client :-MEPI(Technip) Agency:-M/S Alpha Project services (p) ltd.baroda. | Specialist as a commissioning supervisor | November 12th2008 to March 2009.
| Precommissioning of offshore Modules for ADGAS PROJECT, Abudhabi. |
7 | OIL AND NATURAL GAS CORPORATION LTD,AGARTALA | Commissioning supervisor | March 2008 to August 31st 2008 | GGS |
8 | NATIONAL IRANIAN OIL COMPANY,ASSALUYEH,IRAN | Commissioning supervisor | May 2007 to Feb. 2008. | Gas refinery |
9 | GUJARAT STATE PETRONET LTD. Rajkot, Gujarat | Commissioning supervisor | Feb. 2007 to April 2007. | NG PIPE LINE |
10 | Solaris Chemtec Ltd. Baroda, Gujarat | Production operator | November 25th 2004 toFeb. 2007. | Petrochemical |
11 | Metrochem industries ltd. Baroda, India | Plant operator | May 2nd 1998 to Nov 24th 2004 | Petrochemical |
12 | Ficom organics ltd. Ankleshwar, India | Plant operator | Oct. 1996 to March 30th 1998 | Petrochemical |
13 | Sujag fine Chem., Nandesary, India. | Plant operator | April 14th1996 to October 1996. | Chlorination |
EXPERIENCE IN DETAIL
From October 2010 to February 2011.
OIL AND NATURAL GAS CORPORATION LTD.RDS, ASSAM.GGS-1
CONTRACTOR : - M/S IOTL INFRASTRUCTURE ANDENERGY LTD..
COMMISSIONING : - M/S Promantec consultant services pvt.Ltd.
As a DCS Operator (Control Room Operator)
Plant capacity :
Crude Oil 500m3/day
Emulsion 1600m3/day
Gas 100000 SCMD
Water 400m3/day
DCS YOKOGAWA Centum CS 3000 R3.
BMS (Burner Management System).For Heater Treator,and water bath Heater Ignition.
Tank farm activities. Etc.
72 HRS PERFORMANCE GAURANTEE TRIAL RUN(PGTR) VITNESS.
From June 14th 2010. August 2010.
KARACHAGANAKPETROLIUM OPERATING b.v (COMPANY)
CONTRACTOR : -KAZ STROY SERVICE.ALMATY.(Kazakhstan)
PROJECT : -UGPP, URALSK
Cross country GAS Pipeline from Karachaganak to Orenburg-Novopskov. The line with facilities of GDS, GPRS, GMS, GVS and SCADA system with PLC controller ABB (AC800) . The operating pressure range from12barg to 80 bars.
From April 4th 2010. June 1st 2010.
OIL AND NATURAL GAS CORPORATION LTD.RDS, ASSAM. GGS-2
CONTRACTOR : - M/S Larsen &Toubro Ltd. (ECC) Division.
COMMISSIONING : - M/S Promantec consultant services pvt.Ltd.
As a DCS Operator (Control Room Operator) commissioning is success fully completed. Which plant capacity is 350m3/day crude and 115000sm3/day sweet gas production
DCS Honeywell (Experian withPKSystem)
BMS (Burner Management System).For Heater Treator Ignition
Tank farm activities from DCS.
72 HRS PERFORMANCE GAURANTEE TRIAL RUN VITNESS.
From July 17th 2009 to March 24th 2010.
COMPANY : - MAERSK OIL QATAR
CONSTRICTION : - M/S LARSEN & TOUBRO LTD.
COMMISSIONING : - ALPHA PROJECT SERVICES (P) LTD. BARODA.
PROJECT : - BLOCK 5 FDP 2005
LOCATION : - AL SHAHEEN FIELD (HA- PLATE FORM)
The main process systems are:
- Inlet & test separator with send removal system.
- Oil export pumps.
- Pig launcher and receivers.
- Lift gas systems & distribution.
- Flare/closed drain tank with sand removal system.
- Flare tip with ignition panel.
- Atmospherically vent system.
- Water injection distribution.
- Sand cleaning system.
- Chemical storage tanks and injection skid.
- Fire & Gas Detectors & Devices
Hydrocarbon Gas Detector : - Infra-red type
H2S Detector : - Electro Chemical cell type
Flame detector : - Infra-red type
H2 gas Detector : - Catalytic type
Smoke detector : - Optical type
Heat detector : - Rate compensate type
From March 15th 2009 to June 10th 2009.
Agency: - mph technical services, Doha.
RAS GAS, QATAR, from Chiyoda Technip Joint Venture as a PMC S.V
- Steam blowing and RFI preparation for witness.
- Nitrogen purging, vender package, mechanical run drive test and vitness, punchlist preparation and follow up by particular deptt.
RAS GAS PTW & H2S /B.A. FROM National Academy for Professional Training
Certificate
CTJV Confined Space Entry Safety Course.
From November 12th 2009 to March 2009.
Project : - ADGAS
Construction : - M/S L&T LTD. Hazira, Surat. (HC)Division
Client : - MEPI (TECHNIP) for offshore platform precommissioning for ABUDHABI GAS LIQUIFICATION COMPONY, ABUDHABI, and UAE. For (ADGAS PROJECT)
Commissioning Agency : - M/S Alpha Project Services (P) Ltd.
From March 14th 2008 to 31st August, 2008.
CLIENT : - ONGC LTD. AGARTALA.
CONTRACTOR : - M/s L&T (ECC) Division
COMMISSIONING : - PROMANTEC CONSULTANT (PVT) LTD. BARODA. (PCPL)
FOR PRE-COMMISSIONING, COMMISSIONING AND PLANT NORMAL START UP ACTIVITY OF
GAS GATHERING STATION.
CAPACITY : - 300MMSCMD
IT CONSISTING OF HP, MP, TEST SEPARATORS ( 69 Kg/cm2), CONDENSATE SEPARATOR, CONDENSATE STABILIZATION, INSTRUMENT GAS DRYER (MELCON), CAPACITY - 60M3/HRS, BATH HEATER, CENTRIFUGAL PUMPS, CHEMICAL DOSING PUMPS, EFFLUENT WATER STABILIZER, GAS SCRUBBER, CONDENSATE STORAGE TANK ,FLARE SYSTEM AND FIRE PREVENTING SYSTEM. ETC.
May 22nd2007 to February 28th2008.
CLIENT- NATIONAL IRANIAN OIL COMPANY. ASSALUYEH, IRAN. CONTRACTOR-JOINT VENTURE OF TIJD (TEC, IDRO, JGC, DAELIM) FROM PCPL, BARODA
COMMISSIONING SUPERVISOR IN GAS REFINERY ( CAPACITY 4000 MM SCFD) FOR PRE-COMMISSIONING, COMMISSIONING ACTIVITY OF CONDENSATE STABILIZATION UNIT, GAS PLANT FUEL GAS UNIT, VARIOUS TYPE OF COMPRESSOR LIKE RECIPROCATING, CENTRIFUGAL FOR NO LOAD TRIAL RUN MECHANICAL RUN DRIVE TEST. LUBRICATING SYSTEM, COOLING SYSTEM. IT CONSIST OF
- OFF SHORE GAS PRODUCTION.
- SLUDGE CATCHER, MEG RECOVERY, SOUR WATER STRIPPER.
- PRESSURE LET DOWN STATION AND HP SEPARATOR.
- GAS DEHYDRATION UNIT (MOLECULAR SIEVES SILICA GEL TYPE).
- NGL EXTRACTION AND FRACTIONATION
- PROPANE REFRIGERATION, LPG TREATING UNIT AND CONDENSATE STABILIZATION UNIT.
- TANK FARM ACTIVITIES OF 4000m3 CAPISITY OF STORAGE.
FROM FEB - 2007 to April 2007. CLIENT-GUJARAT STATE PETRONET
CONTRACTOR : - M/s ESSAR CONSTRUCTION LTD.
THROUGH AGENCY : - M/s PCPL. BARODA.
PROJECT : - AANAND RAJKOT NATURAL GAS PIPE LINE PROJECT
I WORKED AS A COMMISSIONING SUPERVISOR IN 500 KM LONG, 24 INCH DIA. NG PIPELINE IN SECTIONAL VALVE STATION AND IPS STATION. IT CONSIST PIG LAUNCHER AND PIG RECEIVER. PARAMETERS WERE CONTROLLED THROUGH SCADA SYSTEM
FROM November 2004 to February ‘07 M/s SOLARIS CHEMTECH LTD. BARODA. (THAPAR GROUP)
AS A PRODUCTION OPERATOR, I WORKED IN TBBA PLANT WHOSE CAPACITY WAS 120MT. IT CONSISTED VACUUM DISTILLATION WITH GLASS COLUMN, GLASS LINE VESSELS, AND TANK FARM ACTIVITIES FOR HAZARDOUS CHEMICALS LOADING AND UNLOADING. TRAY DRYER, NUTCH FILTER ETC.
NATURE OF WORK: ERECTION, PRE-COMMISSIONING AND COMMISSIONING, STABILIZATION OF DEXTROSE PLANT, CAPACITY - 110MT/DAY WITH PROCESS PERAMETERS ARE CONTROLLED THROUGH YOKOGAVA PLC PANEL - JAPAN. DEXTROSE USED AS A RAW MATERIAL OF CITRIC ACID.
ALSO WORKED AT CITRIC ACID MANUFACTURING PLANT – AT BADADANA PROJECT WHERE OPERATED M/s FISHER ROSEMOUNT SUPPLIED DCS CONTROL PANEL.
HAZARDAS CHEMICAL LOADING AND UN LODING ACTIVITIES. FOR TANK FARM.
FROM April1998 to Nov 2004. M/s METROCHEM INDUSTRIES LTD. BARODA.
CLIENT-CIBA BASEL, USA
CAPACITY 300 MT/MONTH.
AS A PROCESS OPERATOR, WORKED IN MANUFACTURING OF H-ACID FROM SULPHONATION, NITRATION, REDUCTION OF PETROLEUM PRODUCT NAPHTHALENE OPERATED M/s MOJJ ENGINEERING, PUNE SUPPLIED PLC PANEL.
OLEUM(114%) LOADING AND UN LOADING ACTIVITIES FOR TANK FARM.
From Oct -14-1996 to March-98 M/s-Ficom Organic Ltd, ANKLESHWAR
PLANT OPERATOR (FIELD)
HANDLING OF PLC CONTROL PANEL, CENTRIFUGAL PUMPS (20Kg/Cm2 AND FLOW UP TO 400Nm3/Hr) , PROCESS VALVES , BLOWERS, KHOSALA CRIPPLES MAKE RECIPROCATING AIR COMPRESSORS, HEAT-EXCHANGERS ,PNEUMATIC CONVEYORS,
OPERATION OF UTILITY AND DG-GENERATOR (35 KVA) AND DISTILLATION COLUMN.
TANK FARM ACTIVITIES FOR HAZARDOUS CHEMICALS LOADING AND UNLOADING. .
From April-96 to Oct-96. M/s Sujag Fine Chem Ltd. Baroda
PRODUCTION OPERATOR (PANEL & FIELD)
CHLORINATION PLANT, PRODUCT METADYCHLOROPHYNOL CAPACITY 200 MT/M EQUIPMENTS HANDLED - KHOSLA CRIPPLES RECIPROCATING AIR COMPRESSORS, HEAT EXCHANGERS, DISTILLATION COOLUM AND DG-SET.
TRAINING/COURSE
- SAFETY INDUCTION COURSE.
- PTW – HSE TRAINING.
- H2S Competency Certificate.
- CONFINED SPACE ENTRY, BA SETS.
- FIRST AID.
- FIRE FIGHTING COURSE. ISOLATION AUTHORITY.
- SOLAS (SURVIVAL OF LIFE AT THE SEA).
a) HAZOP (Hazard & Operability Studies).
b) HAZID (Hazard Identification).
c) FTA (Fall Tree Analysis) Studies.
d) FMEA ( Failure Mode Event Anakysis) Studies.
e) FMEAC (Failure Mode event & Critically Analysis)Studies.
f) ETA (Event Tree Analysis) Studies.
g) QRA (Quantitative Risk Analysis) Studies.
PRE COMMISSIONING AND COMMISSIONING ACTIVITIES.
- INSPECTION OF PIPING & INSTRUMENT SYSTEM AS PER P&ID
- PUNCH LIST PREPARATION AND ITS LIQUIDATION
- HYDROTESTING WITTNESS.
- INSPECTION OF LINES FLANGES WITH PROPER GASKETS, FLOW WITH RESTRICTED ORIFICE AND NRV.
- WATER, AIR –FLUSHING AND DRYING OF PIPELINES.
- LEAK TESTING. STEAM BLOWING/FLUSHING OF PIPELINE.
- N2 GAS PURGING AND INERTISATION.
- CATALYST LOADING.
- INSPECTION OF COLUMN, VESSELS, TANKS, FILTERS, EXCHANGERS AND KNOCK-OUT DRUM.
- CHEMICAL CLEANING OF PIPELINE. PUNCH LIST PREPARATION,
- STROKE CHECKING OF CONTROL VALVES THROUGH DCS SYSTEM.
- VALVE TRAY ERECTION IN DISTILLATION COLUMN AND TRAY CHECKING FOR LEVEL NESS WEIR HEIGHT, DOWN COMER CLEARANCE, VALVE FREE MOVEMENT AND PROPER TIGHTENING OF TRAY DECKS.
- NO- LOAD TRIAL RUNNING OF COMPRESSORS, MOTORS AND PUMPS, WITH VENDOR ASSISTANCE. AND PERFORMANCE TEST
- MECHANICAL PREVENTIVE MAINTENANCE, INSPECTION, CHEKING FOR PROPER OPERATIONS.
- COMMISSIONING OF UTILITIES LIKE PLANT AIR, INSTRUMENT AIR, LP & HP STEAM, N2, COOLING WATER, SERVICE WATER, DM WATER, FUEL GAS LINES ETC
- OPERATION AND CONTROLLING PROCESS PARAMETERS USING PLC AND DCS.
DUTIES AND RESPONSIBILITY
- LOOKING AFTER COMPRESSOR, REFORMER AND CO2 REMOVAL AND RECOVERY SECTION ,OXIDATION, HYDROGENATION, DISTILLATION ,POLYMER CRACKING / FURNACE, EFFLUENT TREATMENT, TANK FARM ACTIVITIES LIKE LOADING AND UNLOADING MATERIAL ETC.. IN THE FIELD FOR SMOOTH OPERATION OF ALL EQUIPMENTS.
- THE SAFE, RELIABLE AND EFFICIENT OPERATION OF PLANT BY CONTROLLING PROCESS PARAMETERS THROUGH PLC & DCS PANEL. PLANT START UP AND SHUT DOWN ACTIVITIES, MAINTAINING LOG SHEET AND EMERGENCY HANDLING.
- EXECUTING FIELD AND PANEL OPERATION AND SAFETY AND REGULAR CHECK UP OF PLANT CONDITION.
- REPORT ALL ABNORMALITIES AND FAILURES TO THE HIGHER AUTHORITY AND TAKE POSSIBLE CORRECTIVE MEASURE IMMEDIATELY.
- COMMUNICATION AND COORDINATION BETWEEN THE VARIOUS DEPARTMENTS FOR SMOOTH OPERATION OF THE PLANT.
- FOLLOW UP WITH THE MAINTENANCE DEPARTMENT FOR TAG IN TAG OUT
- START UP AND SHUT DOWN OF THE PLANT.
- ROUTINE CHECKING OF LUBRICATION SYSTEM OF COMPRESSOR, PUMPS ETC AND ALSO TO MAKE UP OIL LEVEL.
- ATTENDING REGULAR REFRESHING TRAINING OF SAFETY AND FIRE FIGHTING.
- CONTINUOUS VIGILANCE ON QUALITY OF PRODUCTS THROUGH LABORATORY RESULTS AND MAKE OR ADJUST NECESSARY CORRECTIONS WITH THE PROCESS PARAMETERS.
- INVOLVED IN TROUBLE SHOOTING OF THE PLANT.
- ATTENDING OF PRODUCTION/TECHNICAL MEETING.
- FOLLOW UP HOT WORK BY CO ORDINATION WITH FIRE AND SAFETY PERSONS.
- FOLLOW UP THE INSTRUCTION FROM HIGHER AUTHORITY PERSON FOR ANY MODIFICATION IMPLEMENTATION IN THE PROCESS.