Installation Engineer & Planning Engineer, Ltd of China National Chemical Engineering Corporation, The 13th Construction Co., Please see Description of Role & Duties
START Date:
August, 2002
END Date:
September, 2008 Worked as installation engineer & planning engineer in Longshunrong pharmaceutical factory project of Tianjin Zhongxin Pharmaceutical Group Corporation Limited from Apr 2003 to Apr 2004 and in 400,000T/Year PVC project of Elion chemical industry Co., Ltd of Inner Mongolia from Jul 2005 to Apr 2008.
- Audit the construction drawing of steel structure, plumbing, piping and equipment discipline, coordinate with design engineer of the inconsistent and mistakes in drawings.
- Prepare the plan of consumable material and construction material to procurement department based on the construction drawings.
- Arrange human resource & machine & tools plan according to the project progress.
- Coordinate with the operation team in construction arrangement and give installation technology support as needed.
- Develop all kinds of installation plan for construction, prepare and file the as-built drawings and documentation.
- Participate in the procedure development of construction management & technology management & quality control & HSE management.\
- Prepare all level construction schedules to meet the need of the project management. Develop and track the schedule use P3 or Microsoft project and issue the weekly and monthly report.
- Prepare proposal schedule for new project and participate in bidding.
- Execute the computer and network maintenance.
Experience Hours (Planning & Scheduling):
10000
Experience Hours (Cost Management):
1000
Experience Hours (Forensic Analysis):
1000 - Company: