Guild of Project Controls: Compendium | Roles | Assessment | Certifications | Membership

Area Project Manager, Aurelio Martins Sobreiro & Filhos SA, BEMPOSTA II Dam - Power Reiforcement, Minho Line - Viana Bridges

START Date: 
August, 2008
END Date: 
October, 2011

Aurelio Martins Sobreiro & Filhos SA , Viana do Castelo (Portugal)

INDUSTRY: Civil Engineering - Construction and Public Works

COMPANY PROFILE: Portuguese engineering, manufacturer and construction group

ROLE:. Leading the Special Works Department (Rail, Earthworks and Structures) with 5  Engineers and 6  Foreman’s

 

# ENERGY & POWER GENERATION

- EDP ENERGY - Bemposta II Hydropower Dam 318MW, Power Reinforcement, SOMAGUE 270 Million EUR – Underground  e Cut and Cover excavations

 

# INFRASTRUCTURE & UTILITIES

- REFER Minho Railway, Viana South Bridges,  ▪ 1.2 Million EUR – 3 underpasses and  1 overpass.

- REFER Minho Railway, Areosa Underpass, VIANA DO CASTELO MUNICIPALITY  ▪ 900k EUR

- REFER Minho Railway, Midões and Moure Branch Bridges, ▪ 1.1 Million EUR

- BRISA  PORTUGUESE HIGHWAYS,  IC9 - Fatima/Ourem -, SOMAGUE- 5,3 Million EUR  - Excavation of 1.000.000m3,(1/2  rock  and 1/2 soils)

- EUROSCUT HIGHWAYS - SCUT S. Miguel  Island- Troço Ribeirinha/Agua de Alto",  38 Million EUR 

- PORTUGUESE ROADWAYS AUTHORITY , Marão Tunnel, SOMAGUE, 5,5 Million EUR -  Earthworks of 5,5km of  the highway  before the  tunnel.

. Developed the Underground experience of the company with Bid and Construction of the excavations of the Power Reinforcement of the Bemposta Dam, which leaded to gain the Contract of Marao Tunnel.

. Achieved the goal of within 14 days, working 24/7, levelled the Douro River in a length of 1,7km.

 

.Developed and maintained a great relationship with the REFER (Portuguese Railway Authority) representatives and directors.

Experience Hours (Planning & Scheduling): 
500
Experience Hours (Cost Management): 
1000